Welding Inspector
Altex
SUG Shut-down, CNRL Horizon., AB
04.2024 - Current
- Prepared master turnover packages including ITP, regulatory forms, MTR’s, and all other relevant turnover documentation.
- Performed inspections on exchangers, catalyst reformer and calibration equipment.
- Witnessed hydrostatic testing on various exchangers ensuring no leaks are present.
- Coordinated with NDT crew for testing and audited NDT reports.