Professional Summary
Overview
Work History
Education
Skills
Languages
Timeline

Uriel Orta

United Production Framing
Santa Clarita,STATE_US
2
Languages
6
years of professional experience

Skilled Framer with extensive experience at United Production Framing, and CBC Framing. Adept in power tools operation and ensuring structural integrity through precise framing and anchoring techniques. Demonstrates exceptional teamwork and problem-solving abilities, significantly enhancing project efficiency and quality. Expert in hardware installation and maintaining high standards of craftsmanship across all tasks.

Work History

Framer

3 Years 6 Months
CBC Framing | 04.2023 - Current
  • Install blocking for the ventilation vents.
  • Tied and unloaded trusses onto the roof to ensure timely project progression.
  • Remove scaffolds used for installing trusses and fascia.
  • Install and remove any marks the inspector sprays with paint to pass inspection.
  • Nail LTP4s, A35s or LS50 onto sheathing where structural.
  • Frame an area access for the HVAC including a platform.
  • Remove or add 2x4, 2x6, or 3/4 to 1/4 for windows or doors that are too small or wide so that there aren't any issues when the window and door installers arrive.
  • Nail a minimum of 1ft of 1/4 plywood outside doors and windows where it's not already sheathed so that flashing can be installed.
  • Responded to requests from other trades by fixing or adding necessary materials.
  • Frame a drop ceiling/soffit where needed and making sure it's level.
  • Maintain a clean work environment by organizing materials and removing debris at the end of each day.
  • Frame and square bathroom niches where needed
  • Remove and replace any corner studs that aren't plumb.
  • Look through the blueprints to see where the engineer wants bracing nailed onto the trusses.
  • Add caulking to porch post and outside blocking so there won't be any visible gaps when painters are scheduled to paint.
  • Walk with the engineer, supervisor, and city inspector to walk through the houses to go over scheduled inspections in order to move unto the next phases.
  • Straight edge floors and level any humps painted by the tile crew so there aren't any visible bumps when installing trim.
  • Frame garage jam with galvanized nails while making sure depending what the plans ask that there is at least 1inch review on the sides and half an inch on top or flush with the corners and 1inch on top.

Framer

5 Years 1 Month
United Production Framing | 09.2021 - Current
  • Plumb and Level doors, walls, window openings, shower benches as well as placing backing for drywall.
  • Cut and lift walls after cutting all the trimmers, king studs, headers, and cripples for layout before bracing.
  • Install blocking for stair rails, kitchen cabinets, toilet holders, towel bars, Tv mounts, and above and below window openings before nailing cs16 strap outside where it's structural.
  • Cut 7x7 to 10x10 holes in e-joist depending on what the HVAC request or rim joist if the plans call for it.
  • Straight edge walls before installing plywood in structural areas of the house or where there are imperfections that drywallers request before inspection.
  • Nail 1x1, 2x4 or 2x6 studs for the hip and ridge depending on what the roof calls for so that roofers can install roof tiles.
  • Screw SDS screws to bottom plates into the rim joist where it's required and ledgers before installing joist hangers.
  • Anchor down bottom plates/mud sills to fasten walls to the foundation as well as install hold downs.
  • Clean and organize any material that can still be used for later such as hardware, OSB, nuts and washers, nails, flashing, and lumber.
  • Straight edge joist making sure it's level before installing OSB as well as unloading screws, glue and 8d nails.

Mason Apprentice

4 Months
Clover Construction | 03.2021 - 07.2021
  • Dig trenches as well as cut, bend, tie and setup rebar before pouring concrete mix.
  • Make mortar mix with or without the machine mixer for the masons that are laying bricks.
  • Measure and cut bricks with skill saw when needed.
  • Cut and clean excess mix from wall before brushing it, leaving a nice and smooth finish.
  • Help bring the pump from the concrete truck to the back of the house while working out you're way back to the truck.
  • Help unload all bricks that we'll be used near where masons will build walls.

Education

High School Diploma

Golden Valley High School | Santa Clarita, CA | 06-2020

Skills

Power Tools Operation such as skillsaw
drill
impact
nailgun
sawzall
and concrete nailer.
Hardware Installation for trusses
hangers for joist
cs16 straps where 4x6 blocks are placed behind sheathing.
Plumb and level doors
windows
walls
bathroom bench's
and drop ceilings/soffit.
Straight edge walls and e-joist making sure it's perfectly level before installing subfloor.
Anchoring down walls with washers
squares and nuts including which type of hold down where its required.
Measure and and frame all parts to build a door
window or wall and making sure its 16OC or 24OC on layout.
Cut perfect holes into the e-joist for the HVAC installers.
Repair any damaged joist
truss
subfloor
sheathing and post that might've been compromised by other trades.
Nail the hip and ridge for roofers depending what the roof needs such as 2x4
2x6
and 1x1.
Install flashing around bathtubs
porches
windows
and doors.

Languages

Spanish
Native or Bilingual
English
Native or Bilingual

Timeline

Framer

CBC Framing
04.2023 - CurrentRead More

Framer

United Production Framing
09.2021 - CurrentRead More

Mason Apprentice

Clover Construction
03.2021 - 07.2021Read More

Golden Valley High School

High School Diploma
Read More
Uriel Orta