Skilled Framer with extensive experience at United Production Framing, adept in power tools operation and ensuring structural integrity through precise framing and anchoring techniques. Demonstrates exceptional teamwork and problem-solving abilities, significantly enhancing project efficiency and quality. Expert in hardware installation and maintaining high standards of craftsmanship across all tasks.
Overview
3
3
years of professional experience
Work History
Framer
United Production Framing
09.2021 - Current
Plumb and Level doors, walls, window openings, shower benches as well as placing backing for drywall.
Cut and lift walls after cutting all the trimmers, king studs, headers, and cripples for layout before bracing.
Install blocking for stair rails, kitchen cabinets, toilet holders, towel bars, Tv mounts, and above and below window openings before nailing cs16 strap outside where its structural.
Cut 7x7 to 10x10 holes in e-joist depending on what the HVAC request or rim joist if the plans call for it.
Straight edge walls before installing plywood in structural areas of the house or where there are imperfections that drywallers request before inspection.
Nail 1x1, 2x4 or 2x6 studs for the hip and ridge depending on what the roof calls for so that roofers can install roof tiles.
Screw SDS screws to bottom plates into the rim joist where its required and ledgers before installing joist hangers.
Anchor down bottom plates/mud sills to fasten walls to the foundation as well as install hold downs.
Clean and organize any material that can still be used for later such as hardware, OSB, nuts and washers, nails, flashing, and lumber.
Straight edge joist making sure its level before installing OSB as well as unloading screws, glue and 8d nails.
Framer
CBC Framing
04.2023 - Current
Install blocking for the ventilation vents.
Help tie and unload trusses onto the roof.
Remove scaffolds used for installing trusses and fascia.
Install and remove any marks that inspector sprays with paint to pass inspection.
Nail LTP4's, A35's or LS50 onto sheathing where structural.
Frame an area access for the HVAC including platform.
Remove or add 2x4, 2x6, or 3/4 to 1/4 for windows or doors that are to small or wide so that there aren't any issues when the window and door installers arrive.
Nail a minimum of 1ft of 1/4 plywood outside doors and windows where its not already sheathed so that flashing can be installed.
Fix or add anything that other trades request.
Frame a drop ceiling/soffit where needed and making sure its level.
Mason Apprentice
Clover Construction
03.2021 - 07.2021
Dig trenches as well as cut, bend, tie and setup rebar before pouring concrete mix.
Make mortar mix with or without the machine mixer for the masons that are laying bricks.
Measure and cut bricks with skill saw when needed.
Cut and clean excess mix from wall before brushing it, leaving a nice and smooth finish.
Help bring the pump from the concrete truck to the back of the house while working out you're way back to the truck.
Help unload all bricks that we'll be used near where masons will build walls.
Education
High School Diploma -
Golden Valley High School
Santa Clarita, CA
06.2020
Skills
Power Tools Operation such as skillsaw, drill, impact, nailgun, sawzall, and concrete nailer
Hardware Installation for trusses, hangers for joist, cs16 straps where 4x6 blocks are placed behind sheathing
Plumb and level doors, windows, walls, bathroom bench's, and drop ceilings/soffit
Straight edge walls and e-joist making sure it's perfectly level before installing subfloor
Anchoring down walls with washers, squares and nuts including which type of hold down where its required
Measure and and frame all parts to build a door, window or wall and making sure its 16OC or 24OC on layout
Cut perfect holes into the e-joist for the HVAC installers
Repair any damaged joist, truss, subfloor, sheathing and post that might've been compromised by other trades
Nail the hip and ridge for roofers depending what the roof needs such as 2x4, 2x6, and 1x1
Install flashing around bathtubs, porches, windows, and doors
Languages
Spanish
Native or Bilingual
English
Native or Bilingual
Timeline
Framer
CBC Framing
04.2023 - Current
Framer
United Production Framing
09.2021 - Current
Mason Apprentice
Clover Construction
03.2021 - 07.2021
High School Diploma -
Golden Valley High School
Similar Profiles
Richard FritchRichard Fritch
Construction Supervisor at United Production FramingConstruction Supervisor at United Production Framing