Overview
Work History
Timeline
Generic

SHIVAMKUMAR AVAIYA

Hinton,AB

Overview

2
2
years of professional experience

Work History

Project Coordinator

A. A. Bhambhrolia Contractors Ltd.
Surat
04.2021 - 12.2022
  • Led all phases of project from estimation to completion, including ComSlab floor system installations (achieving 25-ft spans) and implementing a CAD-integrated digital tracking system that reduced material costs by 7-9% through optimized quantity management.
  • Ensured project success through comprehensive oversight: developing Primavera P6 schedules (90% on-time delivery), processing all submittals/expenses for accurate cost control, and maintaining perfect safety compliance via weekly toolbox talks and audits.

Site Engineer (Intern)

A. A. Bhambhrolia Contractors Ltd.
Surat
04.2021 - 12.2022
  • Technical Leadership: Contibuted construction execution of $15M roadway project through detailed drawing analysis, precise quantity take-offs (including BBS rebar calculations), and quality control of 20 C.M. concrete placements via slump-cone/cube testing, while ensuring structural integrity through pile load and integrity tests.
  • Operational Management: Maintained project timelines by coordinating contractors, resolving technical issues, and implementing efficient testing schedules, while enforcing strict compliance with design specifications through systematic quality assurance protocols.

Timeline

Project Coordinator

A. A. Bhambhrolia Contractors Ltd.
04.2021 - 12.2022

Site Engineer (Intern)

A. A. Bhambhrolia Contractors Ltd.
04.2021 - 12.2022
SHIVAMKUMAR AVAIYA