Dedicated and focused project management specialist with several years of experience excelling at prioritizing, completing multiple tasks simultaneously and following through to achieve project goals. Flexible, detail-oriented and adaptive team player with expertise in equipment operation, staff training and development, customer service and process improvements.
Overview
24
24
years of professional experience
Work History
Supervisor
MY05 Construction limited
02.2023 - Current
Company Overview: MY05 is a construction building construction company, which deals in drywall as well as framing work related to commercial buildings like schools, old age homes, hospitals, etc
Close coordination with the customers and other related technical issues at the site
Supervision and coordinated with a site regarding erection progress, manpower utilization, and bottlenecks
Ensure all erection/installations are undertaken in a safe manner in accordance with Canadian law and Project/Company HR policy
Liaison with and supervision of Q.A
Staff to ensure project quality objectives are attained
Executing Drywall installation work in one of four Stories old age home building at Langley - BC
Executing the framing work in the same project
Supervising the fabrication and assy of steel framing as per drawings/documents at other projects in Langley - BC
MY05 is a construction building construction company, which deals in drywall as well as framing work related to commercial buildings like schools, old age homes, hospitals, etc
Senior Project Manager
ISGEC Heavy Engineering Limited
Noida, India
03.2006 - 01.2023
Company Overview: The ISGEC Group comprises the heavy engineering divisions of the Saraswati Industrial Syndicate Ltd., which is a public company, which was established in 1933
In 1964 it established a joint venture with John Thompson of the UK to form ISGEC JOHN THOMPSON
Today the company deals in Power plants (coal-fired, biomass-fired, etc.), EPC Projects & and production Plant as ISGEC Heavy Engineering Limited
Now ISGEC products have been supplied their Boilers to reputed Companies across 84 countries
Preparing the MS Project schedules, and dispatch schedules
Follow up of the Project Schedule and identify the Critical Path area and items causing concern on the critical path
Cost and schedule Monitoring of projects and individual items
Close coordination with the customers for commercial, engineering, and other related issues
Coordination with engineering departments (Mechanical Design, Instrumentation & Electrical) to ensure timely release & and submission for client/Consultant approvals
Coordination with a site regarding erection progress, manpower utilization, and bottlenecks
The ISGEC Group comprises the heavy engineering divisions of the Saraswati Industrial Syndicate Ltd., which is a public company, which was established in 1933
In 1964 it established a joint venture with John Thompson of the UK to form ISGEC JOHN THOMPSON
Today the company deals in Power plants (coal-fired, biomass-fired, etc.), EPC Projects & and production Plant as ISGEC Heavy Engineering Limited
Now ISGEC products have been supplied their Boilers to reputed Companies across 84 countries
As a Site Project Head of the following projects in India (March 2006 to September 2008): Executed up to successful commissioning of 30 MW (1X120 TPH, 87Kg/cm2) in M/s Dwarikesh Puram- India, Executed up to successful commissioning of 40 MW (1X120 TPH, 87 Kg/cm2) in M/s DSCL, Hariawan, India, Executed up to successful commissioning of 20 MW (1x120TPH) in M/s Godhawari Sugar Mill, Karnataka - India, Executed up to successful commissioning of 20 MW (1x120TPH) in M/s Nirani Sugar Ltd., Mudhol - India
As an Office Project Coordinator in India (October 2008 to August 2009): Executed and coordinated the EPC 2 x 15.0 MW (2X110 TPH Biomass Fired Boiler) in HPCL, Lauriya - India, Executed and coordinated the 24.0 MW (1X 160 TPH CFBC Boilers) in M/s VISA Steel - India, Executed and coordinated the 30.0 MW (2X125 TPH CFBC Boiler) in M/s OCL India Limited - India, Executed and coordinated the 30.0 MW (2x140TPH, 55Kg/cm2) in Hindalco Muri - India
As a Senior Project Head Abroad (September 2009 to June 2012): Executed up to successful commissioning of 6.6 MW (1X28 TPH, 45 kg/cm2) in M/s Aldebaran Del Energia, Spain (Europe), Executed up to successful commissioning of 3.6 MW (1X37 TPH, 45 Kg/cm2) in M/s KIBOS Sugar & Allied Ind
Ltd
East Africa, Executed up to successful commissioning of 30.0 MW (3X 150 TPH, 47 Kg/cm2) in M/s Sukhothai, Thailand, Executed up to successful commissioning of 10.0 MW (1X 50 TPH, 47 Kg/cm2) in M/s Vithai Bio power - Thailand, Executed up to successful commissioning of 34.9 MW (1X 180 TPH, 109 Kg/cm2) in M/s Meghna Group of Industries, Bangladesh
As an America Regional Senior Project Head Abroad (July 2012 to June 2018): Executed up to successful commissioning of 65.0 MW (1X 220 TPH, 109 Kg/cm2) in M/s Santa Ana - Guatemala, Executed up to successful commissioning of 65.0 MW (2X 220 TPH, 109 Kg/cm2) in M/s Magdalena - Guatemala, Executed up to successful commissioning of 65.0 MW (1X 220 TPH, 109 Kg/cm2) in M/s Lizitex - Guatemala, Executed up to successful commissioning of 40.0 MW (1x200 TPH, 85 Kg/cm2) in M/s Ingenio Pantaleón, Panuco - México, Executed up to successful commissioning of 40.0 MW (1x200 TPH, 85 Kg/cm2) in M/s Ingenio La- Gloria, Cardel - México, Executed up to successful commissioning of 34.9 MW (1x220 TPH, 109 Kg/cm2) in M/s Injiboa, El Salvador, Executed up to successful commissioning of 34.9 MW (1x200 TPH, 109 Kg/cm2) in M/s Cenosa, Honduras
As an Asia Senior Regional Project Head Abroad (August 2018 to January 2023): Executed up to successful commissioning of 34.9 MW (1x180 TPH, 109 Kg/cm2) in M/s Meghna Group of Industries, Bangladesh, Executed up to successful commissioning of 2 x 34.9 MW (2 x 180 TPH, 109 Kg/cm2) in M/s Basundara Group
Bangladesh, Executing the EPC Project of Coal fired 30 MW Power Plant (1 X 120 TPH, 87 Kg/cm2) in M/s Adani Group of Industries, Bangladesh
Sr. Engineer (Projects)
M/s Cheema Boilers Ltd.
Mohali, India
06.2003 - 03.2006
Company Overview: It's a Boiler Manufacturing Company based in Mohali (Pb) - India, now these days, this company makes up to 120TPH with 67 kg/cm2 Boilers
From 2008 they are making their own ESP
Responsible for the overall completion of successful commissioning of pressure and Non-pressure Parts
By understanding the Scope of work, Drawings & and specifications
Ensure all operations/erection are undertaken safely in accordance with Indian law and Project/Company HR policy
Liaison with and supervision of Q.A
Staff to ensure project quality objectives are attained
Supervision and coordination of multiple contractors
Schedule preparation with the Project Management
It's a Boiler Manufacturing Company based in Mohali (Pb) - India, now these days, this company makes up to 120TPH with 67 kg/cm2 Boilers
From 2008 they are making their own ESP
Did the Installation and successful commissioning of 40 TPH, 65Kg/cm2 in IAL Sangrur - India
Did the Installation and successful commissioning of 32 TPH, 65 Kg/cm2 in M/s Deepak Spinning Mill - India
Did the Installation and successful commissioning of 60TPH & 65Kg/cm2 Project at CDBL, India
Engineer (R&D)
M/s Indofarm Equipment Ltd
Baddi, India
08.2000 - 05.2003
Company Overview: It's a Tractor manufacturing company based in Baddi (HP) - India
They make tractors of different HP having the range from 30HP to 55 HP
As a team member to Design & and Draught the Different parts of the Engine Having 30HP, 40 HP & and 50 HP Power respectively
As a shift head of the Engine Assembly Team of all models
As a shift head of Trouble-free test and operation of the Engine on the fully Auto testing bed with specific parameters
It's a Tractor manufacturing company based in Baddi (HP) - India
They make tractors of different HP having the range from 30HP to 55 HP
Education
10+2 -
S.R.A.A.B. Collage
Punjab, India
01.1996
Matric -
Happy High School
Punjab, India
01.1994
Skills
Windows
MS-Office
AutoCAD
Operations Management
Project Management
Staff Development
Employee Motivation
Strategic Planning
Ielts
6.5 Bands each
Passportnumbers
H2662946, S7712071,
Totalprofessionalexperience
22+ yrs.
Personal Information
Date of Birth: 09/17/78
Gender: Male
Nationality: Indian
Marital Status: Married
Languages
English
Professional
Spanish
Professional
Hindi
Native/ Bilingual
Punjabi
Native/ Bilingual
AMERICAN B1/B2
20122005290001
Timeline
Supervisor
MY05 Construction limited
02.2023 - Current
Senior Project Manager
ISGEC Heavy Engineering Limited
03.2006 - 01.2023
Sr. Engineer (Projects)
M/s Cheema Boilers Ltd.
06.2003 - 03.2006
Engineer (R&D)
M/s Indofarm Equipment Ltd
08.2000 - 05.2003
10+2 -
S.R.A.A.B. Collage
Matric -
Happy High School
Similar Profiles
CHARANJEET KAURCHARANJEET KAUR
Data Admin/Clerk Specialist at TS Sembhi Construction LimitedData Admin/Clerk Specialist at TS Sembhi Construction Limited
Managing Partner at Cognica International Engineering Construction Services and Trades Sierra Leone Limited (CIECOST SL LTD)Managing Partner at Cognica International Engineering Construction Services and Trades Sierra Leone Limited (CIECOST SL LTD)