Overview
Work History
Timeline
Generic

Emmanuel Krah

Winnipeg,MB

Overview

6
6
years of professional experience

Work History

CBI Home Health
Winnipeg, Canada
08.2021 - Current
  • I support individuals with developmental disabilities in all aspects of their day-to-day lives
  • I help with personal skill development in all areas of the individual's life by showing, teaching and providing opportunities for new experiences
  • I build relationships with the individuals I provide care for, based on respect and trust
  • I administer medications
  • I read and document logbooks and communication books
  • I assist with personal care whenever the need arises

Production Worker

Price Industries Limited
Winnipeg, Canada
05.2019 - 09.2019
  • I assembled the HVAC system using power tools and packaged the assembled product
  • I was responsible for applying labels on products and scanning them before shipping
  • I used a special software to update and complete customers order
  • I carried out regular cleaning of the site after each shift

Member of Wind Energy Design Team

University of Manitoba
09.2022 - Current
  • We design and create mechanical parts using CAD tools
  • I'm part of the electrical team responsible for developing circuits on PCB using Altium Design suit for integration into our control system
  • I participate in brainstorming activities to help come up with solutions to problems regularly

School Project

University of Manitoba
09.2023 - 04.2024
  • The project title was development of test beds for examining low initial system of synchronous machines and converters
  • We modelled a generating Unit using a synchronous generator module on PSCAD
  • A variable load was connected to the system output terminal
  • The real-time behaviour of the system was analyzed with the help of RSCAD as the load was varied
  • The transient response of the system with a change in load was improved by including a converter coupled with a controller to the generating unit
  • The purpose of the controller and converter unit was to control the speed of the generator which in turn controls the system's frequency
  • The frequency of the system was the control variable, it changed as the load changed
  • The main purpose of the project was to stabilize the frequency as the load changes
  • This was achieved by the end of the project

Timeline

School Project

University of Manitoba
09.2023 - 04.2024

Member of Wind Energy Design Team

University of Manitoba
09.2022 - Current

CBI Home Health
08.2021 - Current

Production Worker

Price Industries Limited
05.2019 - 09.2019
Emmanuel Krah