Summary
Overview
Work History
Education
Skills
Certification
Languages
Timeline
Generic

Eduardo Pascual Dominguez

Dartmouth,Canada

Summary

Dynamic epoxy flooring installer with proven expertise at Project Epoxy Floors Inc, skilled in resinous coatings and problem resolution. Enhanced customer satisfaction by 20% through meticulous installation and maintenance of high-quality flooring systems. Proficient in blaster and grinder operation, ensuring optimal project outcomes while fostering a safe work environment.

Overview

19
19
years of professional experience
1
1
Certification

Work History

Epoxy Flooring Installer

Project Epoxy Floors Inc
Dartmouth, NS
07.2023 - Current
  • Inspected, measured, and marked surfaces to be covered, ensuring precision and compliance with project specifications.
  • Prepared concrete floors by grinding, leveling, and vacuuming to remove dust and debris, creating optimal conditions for epoxy application.
  • Calculated required quantities of epoxy and other materials to minimize waste and ensure cost efficiency.
  • Applied primers and sealants to floors, enhancing adhesion and durability of the epoxy coating.
  • Accurately mixed epoxy components according to manufacturer instructions to achieve consistent quality and performance.
  • Installed epoxy floor coverings using rollers, spreaders, and other hand tools while maintaining a clean and safe work environment.
  • Conducted inspections of finished surfaces to ensure smoothness, consistency, and compliance with safety and quality standards.
  • Performed repairs on damaged epoxy floor coverings, extending the lifespan of installations and ensuring client satisfaction.

Flooring Installer

Persa Del Bajio
Queretaro, Queretaro
10.2011 - 07.2023
  • Read and interpreted project specifications to properly prepare and install Stonehard's systems.
  • Used propelled shot blaster and grinder to provide proper floor preparation for new systems.
  • Installed different types of Stonhard epoxy flooring lines: Stoncald, Stoneshield, Stonblend, Stoneres, Stontec, Stonlux, Stongard.
  • Worked through all stages of flooring systems installation: Floor preparation, primer, conductive primer, mortar, groutcoat, undercoat, groove filler, base, aggregate, flakes, elastomer, sealer and coating installation.
  • Maintained excellent communication, cleanliness and safety standards on work sites and projects, boosting customer satisfaction ratings 20%.
  • Recorded measurements and devised plans to match installation specifications.
  • Swept, scraped and chipped dirt and irregularities from base surfaces and filled cracks with cement and putty to form smooth foundation.
  • Took measurements and studied floor sketches to calculate area to be floored and amount of materials needed.
  • Removed existing flooring to prepare cement surfaces for new flooring.
  • Used compounds to waterproof areas, fill in cracks or produce special effects based on project demands.
  • Operated hand tools and machines to install Stonehard's systems and achieve proper finishing.

Builder's Laborer

Construction Company
Queretaro, Queretaro
11.2006 - 08.2011
  • Erected and removed temporary structures such as trench liners and scaffolding to meet team needs.
  • Interacted daily with various project managers, subcontractors and municipal inspectors to complete construction projects.
  • Interpreted job site supervisor's orders and technical documentation to complete accurate work.
  • Prepared and cleaned surfaces for rebuilding purposes by removing damaged tiles, bricks and mortar.
  • Kept tools and equipment cleaned, well-maintained and properly stored to promote team efficiency.
  • Determined materials needed for daily shift and loaded vehicles with equipment and supplies.
  • Used required tools to complete jobs, including hammers, saws, squares, levels and fastening devices.
  • Enhanced job site safety by vigilantly monitoring equipment and team members to prevent accidents.
  • Cleaned, operated and maintained machinery for optimal team productivity.

Education

Secondary Public School -

Secondary Public School Of Amealco
Querétaro
07.2006

Skills

  • Waterproofing methods
  • Resinous and epoxy coatings
  • Floor removal techniques
  • Blaster and grinder operation
  • First aid and CPR
  • Supervision skills
  • Problem resolution strategies

Certification

  • Manual and mechanical handling of loads, 02/01/19
  • Classification and use of personal safety equipment, 03/01/19
  • Personal safety equipment physical risk, 01/01/18
  • Use and handling of fire extinguishers, 01/01/19
  • Safety in the use of manual and power tools, 01/01/19
  • Implementation of transition to the globally harmonized system of classification and labeling of chemical substances, 03/01/19
  • Communication, identification, storage in handling of dangerous chemical substances, 01/01/18
  • Basic industrial safety and environmental protection, 05/01/19

Languages

English
Limited
Spanish
Native/ Bilingual

Timeline

Epoxy Flooring Installer

Project Epoxy Floors Inc
07.2023 - Current

Flooring Installer

Persa Del Bajio
10.2011 - 07.2023

Builder's Laborer

Construction Company
11.2006 - 08.2011

Secondary Public School -

Secondary Public School Of Amealco
Eduardo Pascual Dominguez