Engineering Co-Op Student
Nova Scotia Power, Lingan Power Plant
06.2024 - 09.2024
- Coordinated & Planned weekly schedule for Lingan Power Production.
- Optimized & Revamped Machinery manual inventory system.
- Designed & Felicitated over 50 Machinery Inspection Methods.
- Gained exposure to various aspects of engineering discipline by working closely with multidisciplinary experts throughout co-op placements.
- Studied corrections from senior engineers to learn and grow professionally.