Work History

Alstom Transport Canada Inc.

Project Verification and Validation (V&V) Designer
01.2023 - Current

Job overview

  • Writes the System Verification and Validation Plan for the OnCorr Project
  • Participated to the writing of the test strategies and wrote test objectives for the test procedure lists
  • Provided the test stages required to deliver the system including the assignment of the test procedures
  • Manages all the processes related to the V&V work in DOORS tool and deploy this to the V&V Team
  • Prepares the Requirement Validation Table (RVT) for the all the System and Subsystems requirements
  • Wrote workflows for RVT process and deployed it to the team and other stakeholders
  • Allocates V&V Attributes in DOORS for all the technical requirements in the SyRS
  • Wrote and reviews test procedures for the System In-house and On-Site testing
  • Responsible for the strategy of getting all the technical requirements being allocated by a validation method as Test, Inspection, Analysis or Demonstration
  • Provides estimate of work packages on the V&V as required by the Management
  • Process tailoring to the specific needs of the project and organization for the V&V tasks
  • Participated as member of the Change Control Board for the Change Request using Clear Quest

Alstom Transport Canada Inc.

Senior Verification and Validation Engineer
04.2019 - 12.2022

Job overview

  • Specified and designed overall tests: test architecture (test plan), test design (test cases)
  • Performed test sessions: run test procedures, produce test reports and associated Change Requests
  • Performed customer acceptance tests, and participates to site tests
  • Performed investigation on defects detected on test bench or on site
  • Managed the production of test procedures for Subsystem, System Integration, FAT and SAT
  • Responsible in setting up testing strategies for all test stages of the project
  • Provided the Requirements Compliance Matrix for the Overall Project
  • Estimated workload, realizes scheduling and follow-ups of validation activities
  • Managed V&V work products under configuration management (CM) according to CM Plan
  • Ensured test traceability vs
  • Requirements according to Requirements Management Plan
  • Responsible for all V&V planning activities and validation at the system level
  • Responsible in the V&V attributes in IBM DOORs for modules of System Requirements Specification, System Architecture Design, Internal and External interface design, Subsystem Requirements for Prognostic Health Management, and Training Facility
  • Provided leadership to sub-systems validation teams in their execution
  • Main interface for the customer regarding V&V activities

Thales Canada Transportation Solution
Toronto, Canada

Integration, Verification, and Validation (IVV) Project Lead
01.2015 - 11.2018

Job overview

  • Defines the IVV, Test strategy, and tailors the IVV environment (process, practices and tools)
  • Responsible for the creation, review and approval of the IVV plans
  • Interact with PMO (Project Management Organization) and SEM (Solutions Engineering Manager) for overall project planning and reporting
  • Establish IVV priorities
  • Negotiates priorities with SEM/PMO for unplanned work
  • Perform WPM (Work Package Manager) role (Scheduling, ETC updates, EAC reviews, etc.)
  • Interact with System Project Lead and Software Project Lead to receive high quality inputs for IVVQ
  • Interact with Integration Team for planning of integration activities and monitoring the results
  • Interact with System and Subsystem VV Teams for planning of verification and validation activities and monitoring the results
  • Maintain set of KPI's, analyze results and use this data to drive the teams that you interact with
  • Manage the Project using data
  • Organize TRR (Test Readiness Review) and TQR (Technical Qualification Review) meeting/gate
  • Support Bids and produce IVV Estimates
  • Leads the team on the day to day strategies for delivering the IVV testing activities
  • Executes tests with the Clients for the Factory Acceptance Tests witness
  • Responsible to face internal and external Audits to represent the IVV Team

Thales Canada Transportation Solution
Toronto, Canada

Integration, Verification, Validation and Qualification (IVVQ) Group Leader
02.2008 - 12.2014

Job overview

  • IVVQ Project Lead - HK Duat Project for the MTR in Hong Kong (Mixed Mode Operation with Existing Signalling System SACEM Trains and Thales CBTC Systems)
  • Leading a team of 20 people in IVVQ to deliver the work package in IVVQ
  • Work Package Management and responsible on the overall IVVQ and T&C activities in DUAT Project
  • Prepared test plans for every SW releases and ensures the completion of test execution in-house
  • Wrote test procedures for System Factory Acceptance Tests and the Site Acceptance Tests
  • Wrote test strategies for all the test phases in the HK DUAT Project
  • Wrote System Test Plan, System Verification and Validation Plan, System Demonstration Plan, Trial Operation Plan for the HK DUAT Project
  • Leads and interfaced with Clients for the System Factory Acceptance Tests and other relevant tests in the Life Cycle of the project
  • Coordinated and supported the issues reported from the site to the relevant teams in-house and come up with the resolution of the reported issues
  • Change Control Board Member for the Change Request process in Clear Quest
  • Reviewed test results from the formal testing and making decision of the pass/fail criteria to provide guidance to all testers in the team
  • Responsible on ensuring the validation assessment of the technical requirements in DOORs for the project
  • Leads the team on the day to day strategies for delivering the IVVQ testing activities
  • Provided the System Verification and Validation Report

Thales Canada Transportation Solution
Toronto, Canada

Senior Verification and Validation Specialist
02.2008 - 12.2014

Job overview

  • IVVQ Team Lead in Walt Disney World CBTC project for all the Verification and Validation activities up to this present stage of the project
  • System Integration on Site for the Walt Disney World CBTC project (CBTC Moving Block for Monorail System)
  • IVVQ Technical Lead in Flushing Line for the New York City Transit for all the Verification and Validation activities up to this present stage of the project (CBTC Moving Block Overlay to Existing Signalling System)
  • Involved in the MS Convergence R&D Project for the Verification and Validation activities
  • Involved in the in-house testing and test procedures writing of the Dulles APM Project in Dulles
  • Delivered the Beijing Line 4 and Extension Line from the beginning of the project Stage 1 (fixed block) and Stage 2 (moving block) for the In-house Verification and Validation of the System scope of work
  • Provided bid proposal work package for the IVVQ activities in various projects
  • Wrote test objectives and test procedures for various projects involvement
  • Executed tests for subsystem and system level tests and provided the Requirements Validation Matrix

Bombardier Transportation (Signal) Thailand Ltd.
Bangkok, Thailand

ITC Manager
07.2007 - 02.2008

Job overview

  • Provided work package for Installation, Test and Commissioning (ITC) activities to all R5 projects
  • Ensures on time delivery for ITC activities and achieve agreed commissioning levels
  • Responsible for coordinating all ITC activities on all projects sites region wide
  • Ensures ITC process for R5 projects is followed
  • Ensures site safety rules are followed
  • Ensures skilled resources for installation, test, commissioning, warranty, maintenance and services
  • Represented Region 5 on all matters related to ITC
  • Responsible to provide ITC work estimates for bids and tender projects
  • Manages a team of 10 ITC engineers in the functional department
  • Estimates ITC work and scope for projects in Tender work

Bombardier Transportation (Signal) Thailand Ltd.
Bangkok, Thailand

Site and Test Manager
09.2006 - 07.2007

Job overview

  • Project Assignment: ATP (Automatic Train Protection) for Taiwan Railway Administration
  • This project is equipping 756 train sets of 26 different type in a 1000 km mainline track around the island of Taiwan with the ATP Onboard and Wayside ERTS level 1 system (300M Euros project)
  • Site management for onboard vehicle design team and Onboard prototype ITC management
  • Prototype approval coordination on site and Onboard change order management
  • Vehicle design NCR CCB chairman
  • Field tests management and Attends customer engineering meetings, issues on site, and track access maintenance meetings as necessary
  • Onboard fault review involvement and coordination for necessary fault tracing
  • Closely working with the management team, the customer (TRA), and all other consortium partners in order to deliver the safe and reliable ATP system in Taiwan

Bombardier Transportation (Signal) Thailand Ltd.
Bangkok, Thailand

Wayside Commissioning Manager
12.2006 - 03.2007

Job overview

  • Planning of necessary test needed for the change order in the commissioned ATP wayside in the whole Taiwan mainline
  • Arrange resources in implementing the change order and the necessary static and dynamic tests
  • Decides on the test results for any deviation found on the commissioning nights
  • NCR follow up and conducts CCB-change control board for the fault reported from the Wayside
  • Managed the fault tracing team on site
  • Test and commissioning responsible for any new and re-constructed stations in Taiwan railway
  • Writes commissioning reports in order for the Safety Authority to accept the system being commissioned

Bombardier Transportation (Signal) Thailand Ltd.
Bangkok, Thailand

System Integration and Test Manager
05.2004 - 09.2006

Job overview

  • Project Assignment: ATP (Automatic Train Protection) for Taiwan Railway Administration
  • This project is equipping 756 train sets of 26 different type in a 1000 km mainline track around the island of Taiwan with the ATP Onboard and Wayside ERTS level 1 system (300M Euros project)
  • System Integration Test Planning and Implementation including resource planning and management
  • Prototype Installation, Test and Commissioning Test planning and implementation
  • Prototype safety approval support from site and coordination with the Safety Authority (Safety Validators and Independent Safety Assessors)
  • Coordination with all subsystem involve and the customer in order to synchronise track access, train driver management, test resources, operation schedules and other parties involved
  • Involved in Change Control Board for the NCRs and Hazards found during the tests
  • Deceleration test and train data verification for 22 types of train
  • Regular meetings with customer for project schedules, milestones, project issues and test issues
  • Reliability demonstration test planning and implementation, and final acceptance with the customer
  • Full System Functional Test planning, specification and implementation with the Customer

Bombardier Transportation (Signal) Thailand Ltd.
Bangkok, Thailand

System/Products/Software VALIDATOR (Senior Safety Engineer)
03.2002 - 04.2004

Job overview

  • Safety Validation and Assurance
  • Continuously guide a project in all safety-relevant questions, starting from project planning until final acceptance
  • Validation of a RCS (Rail Control Solutions) product according to all relevant CENELEC, BT (Bombardier Transportation) and other standards
  • Define strategies on how to validate a product, taking care of both technical and formal/process questions
  • Negotiate and plan the validation process with the Project Management, performance of the required tasks and present evidences to internal/external/3rd party Assessor(s) and/or Railway
  • Responsible for planning the Verification and Validation activities through the life cycle of a project
  • Conducts training for software engineers, system designers, project managers, hardware engineers, testers, verifiers and related staff for the detailed interpretation of the CENELEC (European Committee for Electrotechnical Standardization): 50126, 50128 and 50129
  • Conducts training for Safety Management, Hazard and Risk Management, HAZOP – Hazard Operability, PHA, RAMS Principles, and other product safety-related topics
  • Mentors Safety Coordinators of some safety related projects in Bangkok site

Bombardier Transportation (Signal) Thailand Ltd.
Bangkok, Thailand

Safety Engineer
06.2000 - 04.2002

Job overview

  • Responsible of the Safety Planning in the Projects where he is involved
  • Responsible in guiding the projects in Safety related matters
  • Responsible in assisting the Safety Review Team, the Auditor and the Safety Assessor in the review activities
  • Responsible for compiling the project hazard logs and maintaining them in accordance with company procedures
  • Responsible in coordinating the safety activities of the projects
  • Responsible for Safety functions within ADtranz Thailand
  • Responsible in implementing Safety Processes, Safety/hazard analysis and safety activities
  • Responsible for training the Engineering new staff on Safety Processes
  • Assisted manager to instruct employees on Safety issues
  • Responsible in estimating quality and safety manhours for tender projects involved
  • Other duties as assigned by Quality and Safety Department Manager

Asian Institute of Technology
Pathumthani, Thailand

Program Assistant for Center for Energy-Environment Research and Development
01.1999 - 01.2000

Job overview

  • Handled subscription, distribution, promotion, and other activities related to the circulation and publication of a monthly press review (Asian Energy News)
  • Handled all correspondence related to the circulation of Asian Energy News and the news service
  • Prepared and supervised the production of promotional materials and promoting it
  • Conference agreements and publications exchange negotiations with international organizations

Pan-International Electronics Co., Ltd.
Prachinburi, Thailand

Quality Assurance Supervisor
01.1997 - 01.1998

Job overview

  • Standardization of safety procedures in the workplaces of the production from the materials handling to delivery of the goods to the customers
  • Coordinates with the Engineering Department in designing procedures by implementing safety measures in each process
  • Implementation of safety analysis tools and techniques such as hazard analysis, FMECA, and fault-tree analysis
  • Conducts training for safety and quality principle in the orientation of the process and for newly hired
  • Responsible in presenting the company's quality system for every customer's visit
  • Planned and designed QC checklist and IIS (Inspection Instruction Sheet)
  • Planned, organized, and follow-up any activities and project held by the Quality Assurance Department

Timeline

Project Verification and Validation (V&V) Designer
Alstom Transport Canada Inc.
01.2023 - Current
Senior Verification and Validation Engineer
Alstom Transport Canada Inc.
04.2019 - 12.2022
Integration, Verification, and Validation (IVV) Project Lead
Thales Canada Transportation Solution
01.2015 - 11.2018
Integration, Verification, Validation and Qualification (IVVQ) Group Leader
Thales Canada Transportation Solution
02.2008 - 12.2014
Senior Verification and Validation Specialist
Thales Canada Transportation Solution
02.2008 - 12.2014
ITC Manager
Bombardier Transportation (Signal) Thailand Ltd.
07.2007 - 02.2008
Wayside Commissioning Manager
Bombardier Transportation (Signal) Thailand Ltd.
12.2006 - 03.2007
Site and Test Manager
Bombardier Transportation (Signal) Thailand Ltd.
09.2006 - 07.2007
System Integration and Test Manager
Bombardier Transportation (Signal) Thailand Ltd.
05.2004 - 09.2006
System/Products/Software VALIDATOR (Senior Safety Engineer)
Bombardier Transportation (Signal) Thailand Ltd.
03.2002 - 04.2004
Safety Engineer
Bombardier Transportation (Signal) Thailand Ltd.
06.2000 - 04.2002
Program Assistant for Center for Energy-Environment Research and Development
Asian Institute of Technology
01.1999 - 01.2000
Quality Assurance Supervisor
Pan-International Electronics Co., Ltd.
01.1997 - 01.1998