Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Wesley Jack

Almonte

Summary

Adept at delivering exceptional results on time and within budget, I honed my precision machining and project management skills at Canadian Hydro Components. My attention to detail and problem-solving abilities have consistently enhanced production efficiency and quality, making me a valuable asset to any team seeking to improve their operational standards and client satisfaction.

Driven and highly adaptable with keen eye for detail, bringing solid foundation in project management and hands-on problem-solving skills. Proficient in understanding complex blueprints and ensuring compliance with safety regulations. Committed to delivering high-quality work and contributing to successful project outcomes.

Goal-driven contractor dedicated to providing high-quality construction services to discerning clients. Offering first-rate construction management and field supervision expertise. Skillful in working with architects, inspectors, designers and subcontractors to accomplish high-quality project work.

Thorough team contributor with strong organizational capabilities. Experienced in handling numerous projects at once while ensuring accuracy. Effective at prioritizing tasks and meeting deadlines.

Overview

2019
2019
years of professional experience

Work History

Contractor

WB Jack Contracting
  • Delivered high-quality work on time and within budget, earning positive feedback from clients.
  • Delivered outstanding service to customers to maintain and extend relationships for future business opportunities.
  • Managed multiple projects simultaneously while maintaining strict adherence to deadlines and budgets.
  • Coordinated timely delivery of materials and resources to job sites, preventing delays in project timelines.

Machinist

Canadian Hydro Components
08.2011 - 12.2018
  • Inspected completed parts to verify compliance with specifications and quality standards.
  • Utilized micrometers and calipers to measure and verify precise tolerances.
  • Operated drill presses, lathes and milling machines to produce required parts.
  • Manually set up machinery, lathes, and grinders.
  • Adapted to frequently changing priorities in a dynamic manufacturing environment, ensuring timely completion of all assignments.
  • Read and interpreted blueprints, technical drawings and schematics to determine parts dimensions.
  • Demonstrated flexibility in working with various materials, including metals, plastics, and composites, to produce high-quality machined components.
  • Used CNC and manual equipment to perform both initial and final machining.
  • Adjusted machine settings to reduce waste and improve efficiency.
  • Worked with team members to improve production processes and procedures.
  • Supported team members in troubleshooting complex machine issues, sharing knowledge and expertise to resolve problems quickly.

Machinist

Rose Integration
02.2004 - 07.2011
  • Inspected completed parts to verify compliance with specifications and quality standards.
  • Utilized micrometers and calipers to measure and verify precise tolerances.
  • Operated drill presses, lathes and milling machines to produce required parts.
  • Manually set up machinery, lathes, and grinders.
  • Adapted to frequently changing priorities in a dynamic manufacturing environment, ensuring timely completion of all assignments.
  • Read and interpreted blueprints, technical drawings and schematics to determine parts dimensions.
  • Demonstrated flexibility in working with various materials, including metals, plastics, and composites, to produce high-quality machined components.
  • Used CNC and manual equipment to perform both initial and final machining.
  • Adjusted machine settings to reduce waste and improve efficiency.
  • Worked with team members to improve production processes and procedures.
  • Supported team members in troubleshooting complex machine issues, sharing knowledge and expertise to resolve problems quickly.
  • Studied daily work instruction, sketches, drawings, blueprints, and manuals to determine dimensions and tolerances accurately.
  • Assisted in training new machinists on company procedures, best practices, and safe operation of equipment.
  • Monitored equipment to detect and report malfunctions and prevent accidents.
  • Completed projects on time and under budget and maintained equipment and tools.
  • Performed preventative maintenance on machines regularly to minimize downtime due to breakdowns or malfunctions.
  • Maintained detailed records of completed jobs, tracking materials used and time spent on each project for accurate billing purposes.
  • Lubricated parts and performed minor and preventive maintenance to improve machine function and increase lifespan.
  • Calibrated machines to maintain required productivity levels and adherence to quality standards.

Machinist

Terray Corporation
12.1998 - 01.2005
  • Inspected completed parts to verify compliance with specifications and quality standards.
  • Utilized micrometers and calipers to measure and verify precise tolerances.
  • Operated drill presses, lathes and milling machines to produce required parts.
  • Manually set up machinery, lathes, and grinders.
  • Adapted to frequently changing priorities in a dynamic manufacturing environment, ensuring timely completion of all assignments.
  • Read and interpreted blueprints, technical drawings and schematics to determine parts dimensions.
  • Demonstrated flexibility in working with various materials, including metals, plastics, and composites, to produce high-quality machined components.
  • Used CNC and manual equipment to perform both initial and final machining.
  • Adjusted machine settings to reduce waste and improve efficiency.
  • Worked with team members to improve production processes and procedures.
  • Supported team members in troubleshooting complex machine issues, sharing knowledge and expertise to resolve problems quickly.
  • Monitored equipment to detect and report malfunctions and prevent accidents.
  • Assisted in training new machinists on company procedures, best practices, and safe operation of equipment.
  • Optimized tooling performance through regular inspection, cleaning, sharpening or replacing worn tools as needed.
  • Supported recordkeeping by logging daily production, scrap rate and machine maintenance data.
  • Completed projects on time and under budget and maintained equipment and tools.
  • Performed preventative maintenance on machines regularly to minimize downtime due to breakdowns or malfunctions.
  • Lubricated parts and performed minor and preventive maintenance to improve machine function and increase lifespan.
  • Calibrated machines to maintain required productivity levels and adherence to quality standards.

Education

Grade 12 Diploma -

Opeongo High School
Douglas, On

Bachelor Of Mechanical Engineering -

Niagara College
Welland, None
06.1998

Skills

  • Attention to detail
  • Customer service
  • Time management
  • Problem-solving
  • Residential construction
  • Safety compliance
  • Worksite safety
  • Project management
  • Painting and finishing
  • Schedule management
  • Scheduling and planning
  • Construction estimating
  • Subcontractor relations
  • Project estimation and bidding

Languages

English
Full Professional

Timeline

Machinist

Canadian Hydro Components
08.2011 - 12.2018

Machinist

Rose Integration
02.2004 - 07.2011

Machinist

Terray Corporation
12.1998 - 01.2005

Contractor

WB Jack Contracting

Grade 12 Diploma -

Opeongo High School

Bachelor Of Mechanical Engineering -

Niagara College
Wesley Jack