Summary
Overview
Work History
Education
Skills
Timeline
Generic

Warren Reese

Palmdale

Summary

Dependable professional with strong background installing, maintaining, and repairing systems and components. Maintains equipment safety and performance with in-depth inspections and corrections. Dedicated to quality and always professional.

Proactive and versatile professional with a dedication to quickly adapting to new challenges. Strong problem-solving abilities and a proven track record of fostering strong relationships with clients and team members. Focused on supporting team success and achieving positive results.

Overview

28
28
years of professional experience

Work History

Level 4 Installer

Professional Teleconcepts
02.2010 - 03.2023
  • Initial installation of Titan 5500 & 5100 series, building new infrastructure, running all transmission cables and power cables, setting Bay and B&C connectors, and wire wrapping.
  • Installation of zone 4 infrastructure suites and various power jobs supervised crews with the installation of all jobs and tracked & ordered materials.
  • Jobs consisted of PECO, BDFB, Lorain PDB, 1400 amp power plants, primary power & secondary power.

Allencom
01.2008 - Current
  • Running power and 735 cables and Installing B&C.

Lead installer

Allmon
01.2006 - 01.2007
  • Decommission equipment for quest and running power for co-locates.

Lead installer

Rightech
01.2003 - 09.2005
  • Installing Tyco gps 2424 and 4848 power plants and Gnb batteries for cingular wireless.
  • Also performed hot slides transitions, turn up of cell sites, bts gsm bays, removal of old batteries and power plants.
  • As well as, mining of old cables.

Lead installer for Marconi

Comforce
01.2001 - 08.2001
  • Installation and turn up of Marconi power plants.
  • Including DGU and MCA programming.
  • The new systems were installed for Verizon & Quest.

Lead COE installer

US COM
06.2001 - 07.2001
  • Supervised crews in the installation of various equipment for Quest.
  • Writing Mop’s & DMOP’s.
  • Reading spec and prints for the installations of OC-12’s OC 48’, ISDN, X-DSL and TITAN 5500 Series.
  • Running and terminating secondary power from live DBFB to equipment.
  • Duties included running cables, sewing cables, and forming cables.
  • Installing B&C connectors and wire wrapping.

Marconi Services
10.2000 - 06.2001
  • Installation of vortex power plants, copper bus bar, zone 4 infrastructure, cabling, alarms, and programming.
  • Installation of C&D Exide batteries.
  • I also attended a Marconi two-week certification course in North Ridgeville Oh on power plants.

COE installer for Nortel Network

Tad Telecom
05.2000 - 09.2000
  • Initial installation of a DMS 500 switch and Aztec 2800 Amp power plant.
  • Switch consisted of (1) PDB control bay {1} PDB distributions bay (2 PDB rectifier bay’s (2) BDFB’s.
  • Running and terminating primary power from the distribution bay plant to PDC bays.
  • Running and terminating secondary power from PDC to DMS equipment shelves.
  • This job consisted of tear out of old DMS 10 and PECO power plant.

COE installer for Nortel Network

HL YOH Telecom
04.2000 - 05.2000
  • Retrofit of live DMS 500 with one new line up and PDC to equipment shelves.
  • Running transmission and fiber cables, Crimping lugging and wire wrapping of all cables.

COE Lead installer for Level 3 communications

Cactus integration group
11.1999 - 04.2000
  • Installation of zone 4 infrastructure suites and various power jobs supervised crews with the installation of all jobs and tracked & ordered materials.
  • Jobs consisted of PECO, BDFB, Lorain PDB, 1400 amp power plants, primary power & secondary power.

Japha INT
03.1998 - 08.1999
  • Initial installation of Titan 5500 & 5100 series, building new infrastructure, running all transmission cables and power cables, setting Bay and B&C connectors, and wire wrapping.

Alcatel
01.1998 - 02.1998
  • Installing ADSL 1000, zone 4 infrastructure installing shelves, wire wrapping, mounting and leveling bays.

Butler Telecom
07.1997 - 12.1997
  • Installation of large as Installation of astec power plant.
  • Installation of 220 GNB batteries, installation of a DMS 500 switch installation infrastructure, installing DDP & DSX shelves.

Lead installer

Tesinc
01.2002
  • Installing ADSL 7300, zone 4 infrastructure installing shelves, wire wrapping, mounting and leveling bays a.m.p connection.

Education

Telcom Trad

New Millennium Telcom School
Louisa, KY
07-2000

Skills

  • Cable installation
  • Power distribution
  • Infrastructure setup
  • Equipment decommissioning
  • System programming
  • Project coordination
  • Crew supervision
  • Material management
  • Customer communication
  • Technical documentation
  • Problem resolution
  • Attention to detail
  • Safety compliance
  • Quality assurance
  • Time management
  • Technical drawing interpretation
  • Electrical wiring
  • Equipment operation
  • Troubleshooting
  • Equipment calibration
  • Project management
  • System repairs
  • Field verification
  • Supply inventory management
  • Quality checks
  • Professional appearance
  • Power tool operation
  • Flexible scheduling
  • Diagnostics and troubleshooting
  • Positive attitude
  • Safety procedures
  • Inventory oversight
  • Equipment handling
  • Testing processes

Timeline

Level 4 Installer

Professional Teleconcepts
02.2010 - 03.2023

Allencom
01.2008 - Current

Lead installer

Allmon
01.2006 - 01.2007

Lead installer

Rightech
01.2003 - 09.2005

Lead installer

Tesinc
01.2002

Lead COE installer

US COM
06.2001 - 07.2001

Lead installer for Marconi

Comforce
01.2001 - 08.2001

Marconi Services
10.2000 - 06.2001

COE installer for Nortel Network

Tad Telecom
05.2000 - 09.2000

COE installer for Nortel Network

HL YOH Telecom
04.2000 - 05.2000

COE Lead installer for Level 3 communications

Cactus integration group
11.1999 - 04.2000

Japha INT
03.1998 - 08.1999

Alcatel
01.1998 - 02.1998

Butler Telecom
07.1997 - 12.1997

Telcom Trad

New Millennium Telcom School
Warren Reese