Committed job seeker with a history of meeting company needs with consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand.
Prepared the technical requirements for thermal power plant systems and equipment in terms of water
treatment, circulating water supply, cooling tower and wastewater treatment.
Performed comparative analyses of technical proposals of technological equipment and solutions.
Defined and agreed on technological solutions which reduce capital expenses by 0.5 mln USD and
annual operating expenses by 1 mln USD compared with initial solutions.
Prepared reports on the analysis of design and project documentation.
Prepared explanatory notes and other project documents.
Conducted numerous technical Zoom meetings with foreign suppliers in English.
Consulting services for the investment project “The Construction of a New Thermal Power Plant with an
Installed Capacity of 2х200 MW with CFB coal-fired boilers" in the Republic of Uzbekistan as a thermal
power expert.
Carried out analysis of BASIC DESIGN designed by a Chinese General Designer in terms of the
power plant layout, water treatment solutions, and wastewater treatment solutions.
Consulting services for the investment project “The Construction of a Solar PV power plant with an
Installed Capacity of 40/35 MW (DC/AC) in the Samarkand region" based on Single Axis Tracker
systems and bifacial PV modules in the Republic of Uzbekistan as a solar power expert.
Took part in the preparation of the technical part of the General contractor agreement (design
assignment, technical requirements, etc.).