Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Highly skilled candidate with experience in designing, developing and managing construction projects. Proven ability to successfully in problem-solving skills to meet goals and coordinate complex engineering activities in a fast-paced environment.
The contractor for the construction and installation of secondary and main CNG gas stations in the city of Nayin, Isfahan, using the EPC method .
project manager in the National housing project, 190 units in Shahin Shahr city in esfahan, 104 units in Pardis Tehran, 52 units in Fulad Shahr, esfahan totally over than 450000 sqft.
Site supervisor of residential projects and landscaping-road construction in Zeitoon projects 527 units,620000sqm-Saba 256 units,350000sqm - Sepahanshahr ring road in up to 2100km and its structures.
certifications :
Grede1- supervision, calculation and Execration from ministry of roads and urban development in iran
participated in the training corse of :
excavation and execution of retaining structures-steel and concrete buildings construction- method of construction,Modern technology in building execution and executive details-executive points in faced and finishing works in building-methods techniques of HSE system execution-HSE regulations and technical supports-project control and planing system-shop drawing and As built Concrete laboratory
skills: