Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Todd Scheffler

Kelowna,BC

Summary

Reliable worker offering expertise gained over 25 years career in diverse roles. Versed in completing mentally and physically-challenging jobs and working long hours under all types of conditions. Have a history of quickly learning new techniques and equipment operation. Born and raised on a farm in Kelowna with work strong work ethic.

Overview

22
22
years of professional experience

Work History

Sign Technician

Prosign
07.2023 - 06.2024
  • Implemented quality control measures throughout the production process, resulting in consistently high-quality finished products.
  • Contributed to team success by sharing knowledge, skills, and expertise with peers fostering a positive work environment.
  • Collaborated with design team to create custom sign layouts for clients, resulting in visually appealing displays.
  • Worked with CNC router, building LED illuminated channel letters and installation.

Water Treatment Technician

Advance Water
03.2015 - 06.2023


  • Consistently met and exceeded performance expectations through diligent work ethic and commitment to quality service.
  • Improved water quality by conducting regular tests and adjusting treatment processes accordingly.
  • Enhanced team performance through effective communication, collaboration, and problem-solving skills.
  • Collected water samples to test alkalinity, hardness, and residual levels.

Professional Framer

CTN Construction
04.2014 - 06.2015
  • Ensured accurate measurements and cuts, resulting in a high level of precision in the final product.
  • Contributed to increased sales revenue by consistently delivering top-notch framed products that exceeded customer expectations.
  • Collaborated with team members to complete large-scale framing projects within tight deadlines.
  • Achieved faster turnaround times on projects through effective time management skills and efficient work habits.

Framer

Volk Construction
03.2002 - 02.2011
  • Accurately and safely installed wall, roof and floor structures according to blueprints, customer requests, and available inventories.
  • Enhanced overall project efficiency by accurately measuring and cutting materials for framing projects.
  • Cut and joined wood, using precise measurements and proper techniques to create frames of different sizes
  • Demonstrated versatility in framing skills by adapting to various project requirements, including residential homes, commercial buildings, and custom projects from foundation to roofing, pool installations to everything inbetween.

Education

Aircraft Structures Technician - Aviation

British Columbia Institute of Technology (BCIT)
Kelowna
06.2002

Skills

Detail Orientated

Team Player

  • Mechanical understanding
  • Flexible and Adaptable
  • Measurements and Calculations
  • Decision Making and Prioritization
  • Blueprint Interpretation

Languages

English

Timeline

Sign Technician

Prosign
07.2023 - 06.2024

Water Treatment Technician

Advance Water
03.2015 - 06.2023

Professional Framer

CTN Construction
04.2014 - 06.2015

Framer

Volk Construction
03.2002 - 02.2011

Aircraft Structures Technician - Aviation

British Columbia Institute of Technology (BCIT)
Todd Scheffler