Tan Cang Cai Mep International Terminal, 07/2010, 07/2012, Work with vendor to build the design for all part of IT system.
Survey the Container Yard to design the map for the Access Point of the Wireless system
Design the fiber cable system to connect the Wireless system to Datacenter
Design the topology of Server and Network equipment to operate the Terminal Operating System
Collect the requirement from user to build the special function in Terminal Operating System
Configure and arrange the frequency channel for Walkie-talkie system, Tasks/Achievements, Tasks/Achievements
Languages
English
Professional Working
Timeline
IT System Engineer
Tan Cang - Cai Mep International Terminal
07.2010 - 06.2023
IT Help Desk
Tan Cang IT Solution
10.2009 - 07.2010
Computer Science
Ho Chi Minh University of Technology
Computer Networking
Ho Chi Minh University of Foreign Language and Information Technology