
Dynamic and results-driven professional with extensive experience in construction and mining, notably with Redpath Mining. Excelled in erecting complex conveyor systems and steel structures, showcasing expertise in rigging techniques and construction safety. Proven ability to lead and innovate in challenging environments, significantly enhancing operational efficiency.
Installation of underground conveyor system and steel structures on a 2 weeks on 2 weeks off rotation. Task include
Piloting and reaming holes for ventilation and escape ways underground using rd-7 and rd-3 raise bore drills. Task include
Apprentice Ironworker at west white rose project building a fixed drilling platform. Task include
Installation and removal of telephone poles and anchors using heavy equipment. Task include
Was a member of a logistics crew that did all rigging/hoisting at the Muskrat falls hydroelectric generating station.
- 2 day fall protection
- First aid
- Power line hazards
-L.o.t.o training
-Raise bore level 1 operator’s course
- Basic common core