Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
Threaded pipes using piping machines.
Followed safe work practices, which included fall protection and personal protective equipment.
Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
Leadhand
Canaco Energry
05.2023 - 11.2023
Completed four back to back turnarounds, Removal and Installation of automated valves, replacment of tank top, tank repairs, exchanger bundle pulls
Instalations Superviser
Andritz Hydro
08.2022 - 04.2023
Start to finish completion of intake gates refurbishment
Replacement of gates , sills guides and motors
This was a union supervisory position
Coordinated concrete sub contractors, scaffolders, electricians, and iron workers for this project
Site Manager
Corral Inn Dam / Lower Bonnington
03.2021 - 12.2021
Supervised and coordinated the removal and installation of hydro dam gates
Supervised sand blasting and coating, concrete demo and installation, welding and iron worker scope, scaffolders electricians and under water divers to complete daily tasks
Held coordination meetings with client, safety meetings, site coordination meetings, purchasing, union agreements and transportation of supplies from third party fabrication shops
Enhanced project efficiency by implementing streamlined processes and procedures for site management tasks
Reduced safety incidents by conducting regular site inspections and enforcing strict adherence to safety protocols
Managed subcontractors, ensuring quality workmanship and adherence to project timelines and specifications
Improved client satisfaction with timely project completion through effective communication and coordination among team members
Led cross-functional teams in the execution of complex construction projects, fostering a collaborative work environment that drove optimal results
General Foreman
Ipac services
04.2020 - 12.2020
Complete construction of expansion of existing plant, installation of prebuilt building towers and mod rack piping, Field measure and install all connecting piping form rack to buildings
Structural supports and commissioning of plant
Superintendent
Arnett & Burgess Pipelines
10.2017 - 12.2019
TC multiply locations for installation of receiver and launcher barrels varying from 36" down to 4"
Shot in bends and constructed risers for valve stations and pig launchers and receivers, Lay out ditch lines and supervised hydro and directional drilling for line crossings
Fabrication and testing of piping spools and structural supports in shop for field installation
Site Superintendent
Clear Stream Energy
07.2016 - 02.2017
Supervised maintenance crews of 20 at three SAGD locations
Accurately read ISO's and repair manuals to identify mechanical problems and ix them
Competed all repairs and maintenance work to company standards
Ensured customer satisfaction by providing highest quality of work by ensuring all equipment as properly installed and working correctly
Planned work orders and prioritized jobs
Assisted in management f business operations by maintaining records and files
Prepare cost and inventory reports and ordering supplies
Construction Labourer at CGE Oilfield Services Fort Mucmurry, Oilfield Services LtdConstruction Labourer at CGE Oilfield Services Fort Mucmurry, Oilfield Services Ltd