Summary
Overview
Work History
Skills
Languages
Timeline
Generic

Sheldon Rogers

Gambo ,Nl

Summary

Dynamic and self-motivated professional with a proven track record at Park Derochie Coatings. Adept at sandblasting and coatings, I excel in teamwork and possess a keen attention to detail. Recognized for improving operational efficiency and maintaining a positive attitude in fast-paced environments. Committed to quality and safety in all projects.

Overview

10
10
years of professional experience

Work History

Sandblasting, Coatings

Park Derochie Coatings
07.2024 - 03.2025
  • Self-motivated, with a strong sense of personal responsibility.
  • Worked effectively in fast-paced environments.
  • Skilled at working independently and collaboratively in a team environment.
  • Proven ability to learn quickly and adapt to new situations.

Drywall Installer

Nahanni Construction
02.2022 - 07.2024
  • Completed installation of drywall sheets on commercial and residential properties.
  • Prepared work area, tools and equipment for job site.
  • Installed drywall for residential and commercial projects with consistent attention to quality and safety.
  • Performed accurate cuts around electrical outlets, plumbing fixtures, and windows for seamless integration of drywall panels into existing structures.

Drywall Installer

Emmanuel Construction Limited
01.2021 - 12.2022

Forklift Operator

Barry Group Incorporate
06.2015 - 03.2021
  • Safely loaded and unloaded trucks using appropriate forklift attachments, reducing the risk of accidents or injuries.
  • Kept warehouse clean and organized by removing debris and returning unused pallets to designated areas.
  • Improved warehouse efficiency by skillfully operating forklifts to move, locate, and stack materials.
  • Wrapped pallets in plastic wrap and attached merchandise tags to prepare for shipping.

Skills

  • Friendly, positive attitude
  • Teamwork and collaboration
  • Customer service
  • Problem-solving
  • Attention to detail
  • Dependable and responsible
  • Multitasking

Languages

English
Elementary

Timeline

Sandblasting, Coatings

Park Derochie Coatings
07.2024 - 03.2025

Drywall Installer

Nahanni Construction
02.2022 - 07.2024

Drywall Installer

Emmanuel Construction Limited
01.2021 - 12.2022

Forklift Operator

Barry Group Incorporate
06.2015 - 03.2021
Sheldon Rogers