Managed a team of electricians, ensuring proper scheduling, training, and adherence to safety protocols.
Coordinated shutdown maintenance activities to minimize disruption while maximizing equipment availability upon completion.
Provided mentorship to junior technicians, fostering professional growth within the department.
Reviewed blueprints and schematics to efficiently troubleshoot various equipment throughout the mill
Responded to fault and wiring issues, identifying hazards and problems.
Installed new equipment and modified existing equipment.
Conducted preventive maintenance on equipment.
Created and maintained daily and weekly reports for upper management.
Scheduled and oversaw maintenance, repair and installation activities.
Maintenance Electrician
San Gold Mine
01.2009 - 11.2009
Worked effectively with operations in the mill as well as underground to provide quick analysis of electrical issues pertaining to equipment on both surface and underground.
Worked a 2x2 week rotating schedule
On call duties on a rotating schedule shared with other crew members to respond during night shift to any and all electrical issues throughout the mine.
safely operate underground scissor deck and transport myself and other workers to jobs within portal in Toyota truck.
extension of ventilation fans, installation of refuge stations, expansion of underground substations, installation of sump pumps and controls, trouble shoot blasting issues
trouble shoot multiple surface mill issues pertaining to the cone crusher, ball mill, smelter, conveyors, VFD's, cyanide gas sensors, etc.
Industrial Maintenance Electrician
AV Terrace Bay
02.2008 - 02.2018
Worked a 3x2x2 rotating days to nights schedule responding to calls throughout the mill
Supported plant operations by performing emergency repairs on malfunctioning electrical systems during peak production hours.
Enhanced overall plant performance through the installation, maintenance, and repair of electrical systems across various process lines.
trouble shoot PLC and DCS related issues, Allen Bradley and Toshiba VFD's, safely install 120V to 2300V motors and quickly determine issues with motor control cct's when responding to trouble calls, installation and repairs of 13.8KV transformers and systems, medium voltage starter installation and maintenace, small building power repairs and installs as well as 600V lighting systems
Construction Electrician
Trotter & Morton
10.1999 - 01.2008
during the last 4yrs with the company I secured a subformen position and directed a number of small crews where I delegated tasks and saw that all installs were safely and efficiently executed while striving to meet time lines and stay within budget.
Installed ground grids and duct systems for main incoming building power
layout and construct electrical rooms while following detailed structural, mechanical and electrical drawings
install EMT, PVC, and rack systems
rough in rooms and follow detailed millwork drawings
wire and terminate electrical panels and distribution systems.