Summary
Overview
Work History
Education
Skills
Timeline
Generic
NOORDEEP SINGH

NOORDEEP SINGH

Brampton,ON

Summary

Detail-oriented roofer with expertise in roof installation and weatherproofing. Proven ability to uphold safety compliance while coordinating projects and collaborating with teams to ensure high-quality outcomes.

* Installed approximately 80000 square feet roof of TORCHDOWN ROOF at QBD Group in Brampton Location and 120,000 square feet of roof of same group in T. P. O membrane material

* Installed 30000 square feet roof of TORCHDOWN at RAJDHANI Restaurants Mississauga.

* Installed 30000 Square feet of BUR roof in Elliot lake, Ontario.

*Installed 100000 square feet of T.P.O at Holtby Avenue, Brampton, ON.

*Installed TORCHDOWN roof of approximately 300000 square feet of roofs.

Overview

4
4
years of professional experience

Work History

Roofer

A1 Roofing & Renovation Inc.
Brampton, Ontario
04.2021 - 06.2025
  • Installed roofing materials on residential and commercial properties to ensure weather resistance and durability. Inspected roofs for damage, identifying repair needs to maintain structural integrity.
  • Collaborated with team members to uphold safety protocols, contributing to a secure work environment. Operated roofing tools and equipment, including nail guns and scaffolding. Removed old roofing materials in preparation for new installations.
  • Communicated with clients to explain services and address concerns.
  • Operated power tools such as nail guns safely in order to complete tasks quickly and efficiently. Removed old roof coverings in preparation for new installations.
  • Climbed ladders and scaffolding to reach roofs for inspection, repair, or installation. Installed underlayment, shingles, metal roofing systems, and other materials to construct roofs.
  • Repaired and replaced roof membrane, sub roofing, sheathing and base materials. Worked safely and effectively under difficult conditions and completed projects under various kinds of weather.
  • Measured and cut materials according to specifications with hand tools such as hammers, saws, chisels. Followed manufacturer specifications to remove old roofing materials and install new roofs.
  • Maintained and repaired roofing tools and equipment. Inspected existing roofs for damage or leaks and applied sealants.
  • Repaired and maintained surface materials to make building exteriors weatherproof and waterproof. Attended safety meetings to ensure compliance with all safety regulations.
  • Cut roofing paper to size and nailed and stapled paper to roof in overlapping strips to form base for roofing materials. Participated in all phases and types of commercial roofing.
  • Overlapped successive layers of roofing material, determining distance of overlap using chalk line, gauge on shingling hatchet and lines on shingles. Diagnosed and identified sources of leaks, developing plans for repairs from total tear-offs to patchwork.
  • Cemented and nailed flashing strips of over joints to achieve watertight seals. Repaired damaged areas of the roof using tar and other waterproofing materials.
  • Communicated effectively with customers regarding progress updates throughout project duration. Collaborated with team members on large scale projects requiring multiple workers.
  • Performed preventive maintenance on tools and equipment used in job activities. Applied plastic coatings and membranes, fiberglass or felt over sloped roofs to prepare for shingle installation.
  • Resolved customer complaints by providing appropriate solutions within a timely manner. Selected necessary materials and calculated dimensions to develop plan appropriate to specifications.
  • Followed company policy regarding hazardous waste disposal procedures. Maintained accurate records of completed jobs including measurements and material used.
  • Covered roofs and exterior walls of structures with slate, asphalt, and aluminum with brushes and knives. Performed demanding physical work over extended periods and modeled positive attitude. Operated equipment with strong focus on safety and ground communication.
  • Loaded materials and tools into vehicles and unloaded upon arrival at jobsites. Added vapor barriers or insulating materials on flat roofs. Kept production team moving forward for progress in daily site operations.
  • Mopped and poured hot asphalt and tar onto roof base while applying asphalt and tar and gravel to roof. Reviewed project blueprints and specifications to determine number of workers needed to complete jobs. Allocated material and labor resources to promote on-time and under-budget project completion.

Education

2 Year Diploma - Business Management

College Avalon
Montreal, QC
01-2023

High School

Meeri-Peeri Senior Secondary School
Batala, Punjab, India
03-2019

Secondary Education

St. Francis Convent School
Dera Baba Nanak, Punjab India
03-2017

Skills

  • Roof installation
  • Weatherproofing techniques
  • Safety compliance
  • Quality assurance
  • Project coordination
  • Team collaboration
  • Equipment operation
  • Effective communication
  • Problem solving
  • Time management
  • Attention to detail
  • Teamwork and collaboration

Timeline

Roofer

A1 Roofing & Renovation Inc.
04.2021 - 06.2025

2 Year Diploma - Business Management

College Avalon

High School

Meeri-Peeri Senior Secondary School

Secondary Education

St. Francis Convent School
NOORDEEP SINGH