Determined Scaffolder taking on challenges and working at extreme heights. Willing to step up and help out when needed in various capacities. Offering decision making and organizational skills.
Overview
1
1
year of post-secondary education
22
22
years of professional experience
Work History
3rd year scaffolder
Falcons scaffolding
Edmonton, AB
06.2025 - 08.2026
Constructed scaffolding structures according to safety regulations and project specifications.
Inspected materials and equipment for quality and safety before use.
Collaborated with team members to ensure efficient workflow and task completion.
Constructed and dismantled scaffolding structures for various construction projects.
Ensured compliance with safety regulations during scaffold installation and use.
Assisted in training new scaffolders on best practices and safety protocols.
Collaborated with project managers to assess scaffolding requirements on-site.
Maintained clear communication with team members to ensure efficient workflow.
Organized tools and materials for easy access during scaffold assembly tasks.
Followed blueprints and specifications to deliver precise scaffold setups efficiently.
Loaded and unloaded scaffold components from vehicles safely.
Followed safe working practices at all times while erecting and dismantling scaffolds.
Conducted regular inspections to check stability of erected structures.
Ensured that the correct type of scaffolding was used for each job.
Set up access platforms, ladders and hoists to enable safe movement around site.
Assembled, erected and dismantled scaffolding for construction projects.
Unloaded equipment and materials and moved supplies around on job sites in various weather conditions.
Analyzed base surfaces to identify potential obstructions or safety hazards.
Utilised a range of hand tools and power tools during assembly.
Trained junior staff members in the safe operation of equipment used in scaffolding works.
Identified hazards associated with activities related to the installation process.
Checked delivered materials against order specifications prior to use onsite.
Safely and accurately built scaffolding in confined spaces like cooling towers.
Worked collaboratively with other tradespeople onsite as part of a team.
Cut down boards and plywood panels to meet appropriate size requirements.
Broke down structures following project completion.
Repaired and replaced faulty or damaged scaffold materials.
Operated machinery in busy environments and maintained safety around equipment, people and other projects.
Constructed scaffolds in appropriate positions and secured completed structures in place.
3 year scaffolder
Colron construction
Edmonton, AB
01.2025 - 06.2025
Inspected scaffolding setups to ensure compliance with safety standards.
Collaborated with team members to coordinate efficient workflow on job sites.
Maintained scaffolding equipment and tools in clean, functional condition.
Assisted in training new scaffolders on safety procedures and best practices.
Followed blueprints to accurately set up scaffolding as per project specifications.
Communicated with site supervisors regarding project progress and safety concerns.
Demonstrated proper lifting techniques to ensure safe handling of materials.
Loaded and unloaded scaffold components from vehicles safely.
Followed safe working practices at all times while erecting and dismantling scaffolds.
Conducted regular inspections to check stability of erected structures.
Assembled, erected and dismantled scaffolding for construction projects.
Unloaded equipment and materials and moved supplies around on job sites in various weather conditions.
Utilised a range of hand tools and power tools during assembly.
Identified hazards associated with activities related to the installation process.
Checked delivered materials against order specifications prior to use onsite.
Worked collaboratively with other tradespeople onsite as part of a team.
3year scaffolder
Falcon scaffolding
Edmonton
04.2024 - 01.2025
Constructed safe and stable scaffolding structures for various construction projects.
Inspected scaffolding materials for quality and compliance with safety standards.
Collaborated with team members to ensure efficient workflow on job sites.
Assisted in training new scaffolders on safety procedures and best practices.
Maintained tools and equipment to ensure readiness for daily tasks.
Monitored work environment to identify potential hazards and mitigate risks.
Communicated effectively with site managers to coordinate project requirements.
Loaded and unloaded scaffold components from vehicles safely.
Followed safe working practices at all times while erecting and dismantling scaffolds.
Conducted regular inspections to check stability of erected structures.
Assembled, erected and dismantled scaffolding for construction projects.
Unloaded equipment and materials and moved supplies around on job sites in various weather conditions.
Analyzed base surfaces to identify potential obstructions or safety hazards.
Utilised a range of hand tools and power tools during assembly.
Trained junior staff members in the safe operation of equipment used in scaffolding works.
Royal Marines
British armed forces
Taunton England , Devon
07.2006 - 04.2024
I was stationed at 40 commando Royal Marines for 8 years, where I served in a number of countries around the world. I served in a heavy weapons troop and I was also trained as a driver and a signaller , reached the rank of corporal
Skilled Laborer
Delnor construction
Edmonton, AB
10.2018 - 04.2024
Operated heavy machinery for efficient site preparation and material handling.
Assisted in the installation of structural frameworks and building components.
Collaborated with team members to maintain a safe work environment on-site.
Managed tools and equipment to ensure proper maintenance and functionality.
Followed blueprints and specifications to complete tasks accurately.
Conducted routine inspections of materials for quality assurance on-site.
Trained new laborers on safety protocols and operational procedures effectively.
Operated power tools and equipment to complete assigned tasks.
Conducted regular inspections of work areas to ensure safety standards were met.
Assisted in loading and unloading trucks with necessary materials for projects.
Cleaned up debris from construction sites after work was completed each day.
Set up equipment to maintain worksite productivity.
Constructed concrete forms for pouring foundations or walls.
Operated trucks to transport items to and from specified destinations.
Filled trenches and holes using shovels and compactors to job site specifications.
Performed basic maintenance on machines and tools.
Signaled construction equipment operators to facilitate alignment, movement and adjustment of machinery.
Controlled traffic to protect work site integrity, crew safety, and general public welfare.
Assisted distribution of tools, materials, and equipment to skilled workers.
Transported materials between locations in order to complete projects on time.
Ensured that all tools were stored properly after use.
Communicated effectively with supervisors regarding progress updates.
Performed demanding physical work over extended periods and modeled positive attitude.
Understood how to operate and maintain job site equipment safely and for maximum productivity.
3year scaffolder
Falcon scaffolding
Edmonton, AB
10.2007 - 10.2018
Constructed safe and stable scaffolding structures for various construction projects.
Inspected scaffolding materials for quality and compliance with safety standards.
Collaborated with team members to ensure efficient workflow on job sites.
Assisted in training new scaffolders on safety procedures and best practices.
Maintained tools and equipment to ensure readiness for daily tasks.
Loaded and unloaded scaffold components from vehicles safely.
Conducted regular inspections to check stability of erected structures.
Followed safe working practices at all times while erecting and dismantling scaffolds.
Ensured that the correct type of scaffolding was used for each job.
Assembled, erected and dismantled scaffolding for construction projects.
Unloaded equipment and materials and moved supplies around on job sites in various weather conditions.
Utilised a range of hand tools and power tools during assembly.
Identified hazards associated with activities related to the installation process.
Checked delivered materials against order specifications prior to use onsite.
Worked collaboratively with other tradespeople onsite as part of a team.
Cut down boards and plywood panels to meet appropriate size requirements.
Broke down structures following project completion.
Repaired and replaced faulty or damaged scaffold materials.
Consistently constructed square and level projects.
Maintained clean and organized workplace to optimize performance, efficiency and safety.
Scaffolding aprentice
LTC scaffolding
Plymouth, Nova Scotia
09.2004 - 10.2007
Assisted in assembling scaffolding structures for construction projects.
Maintained tools and equipment to ensure safe operation on job sites.
Followed safety protocols to protect team members and site visitors.
Collaborated with team members to complete scaffold installations efficiently.
Reported equipment issues to supervisors for timely repairs and maintenance.
Worked closely with mentors to understand project objectives.
Completed semi-skilled and skilled work under supervision of fully qualified professionals.
Observed experienced professionals performing their duties in order to gain practical knowledge of industry standards.
Developed and maintained effective working relationships with other apprentices, colleagues, customers and suppliers.
Transported items and tools from truck to work locations.
Assisted in the preparation of project plans and schedules.
Completed workshops and off-the-job training to achieve job competencies.
Completed daily administrative tasks such as filing documents, recording data and processing paperwork.
Shadowed craft experts and supervisors to learn wide range of simple and complex techniques.
Helped operators align, move and adjust equipment and materials.
Utilised problem solving skills to identify and resolve issues relating to apprenticeship programs.
Moved and held materials for senior professionals to complete work.
Assisted in the preparation and clean-up of work areas to maintain a safe environment.
Observed and documented project progress for learning purposes.
Performed routine tasks such as measuring, cutting, and assembling materials.
Followed safety protocols and guidelines to prevent workplace accidents.