
Dynamic Solid Control Technician with Precision Drilling, skilled in optimizing drilling efficiency through advanced fluid testing and data analysis. Proven leader in crew coordination and safety compliance, ensuring operational excellence and environmental standards. Adept at equipment maintenance and problem-solving, driving successful outcomes in high-pressure situations. Some projects I have been part of are the Seven Generations upper and lower Montney wells south of Grand Prairie from 2016 to 2019. High-pressure Duvernay wells in Fox Creek from 2019 to 2021 for Crescent Point. From 2022 to 2025, I was on the ConocoPhillips Montney project in Won O Won, BC. On this project, I was in charge of solid control in the Floc water and brine sections. After displacing to Invert, I would run the barite recovery system to best regulate low-gravity solids, adjusting settings accordingly. I am currently working in Surmont on the Sag D project on a polymer mud system, while assisting and training new Derrickhands.