I am a dedicated certified 2nd generation Coating Foremen, with a passion for the Pipeline. I have 12 years of experience and a proven track record of efficiently, effectively, safely and confidently directing the crew to the successful completion of the job. I am continuously improving and impacting the success of the team.
Currently Lead Hand and Straw Boss of coating crew
CGL Installation of 150 kms of 42" Steel Pipeline
Smokey Creek Trans Canada Installation of 72 kms of 24" Steel pipeline
Installation of 192 kms of 36" Steel Pipeline
Enbridge Line 3 Spread 8 Installation of 92 kms of 36" Steel Pipeline
Atco Pemina Keep Hills Transmission Project Installation of 59 kms of 30" Steel Pipeline
Enbridge Installation of 19 kms of 24" Steel Pipeline
Trans Canada Installation of 26 kms of 20" Steel Pipeline
Atco Pipelines Urban Pipeline Replacement Installation of 44 kms of 20" Steel Pipeline including 15 valve assemblies
Trans Canada Installation of 21kms of 20" Steel Pipeline
Atco South West Connector Installment of 80kms of 24" Steel Pipeline
Trans Canada Installment of 27kms of 20" Steel Pipeline
Interior Pipeline Polaris Pipeline Installation of 300 plus kms of 36" Steel Pipeline
Trans Canada Dig Packages varying in sizes of exposed pipe from 2meters to 54meters from 36-48 inch Steel Pipeline replacement Spraying SPC 288
Front end loader operator for the warehouse
Review construction drawings, specifications, conditions, commitments, work plans and procedures
conducting Daily Safety Tailgate meetings including daily job hazard assessments
Complete daily report on construction activities, progress, and issues
Ensure that the project construction activities are working to approved inspection and test plans, coating application procedures, and quality control inspection procedures
Ensure that the Coating Inspectors or third-party contractors are performing coating quality control inspections
Validation of coating applicator and coating inspector qualifications
Verification of coating product storage, control, and expiration dates
Ensure that environmental conditions are suitable for coating application
Verification of substrate cleanliness and surface profile preparation
Ensuring consistent verification of
coating product batch number, temperature, and mixing practices
Verification of coating application technique and wet film thickness
Verification of dry film thickness, coating cure, and coating hardness
Verification of holiday detection equipment and activities
Review of project coating quality control reports