Led civil scope of work for solar power facility in Texas to issue 90% civil drawings and stormwater calculations
Coordinated site layout with electrical subconsultant, structural engineers and client during weekly meetings
Designed gravel roadway, detention basin and drainage system; produced Stormwater Pollution Prevention Plans (SWPP) and documents for construction permitting.
Project Coordinator
Roadways Utilities Enabling (RUE) Works
01.2021 - Current
Manage 5 subconsultants as project coordinator for design services of construction phase to issue RFIs and submittals
Lead contractor and client meetings to coordinate design submissions for civil, roadways and utilities scope
Spent 6 months on-site to coordinate Terminal 1.5 water and hydronic piping to construction documents with contractor
Familiar with LAWA AEGIS As-Built system.
Civil Engineer Level 3
Arup
02.2019 - Current
Consulted Los Angeles World Airport (LAWA) on redevelopment of existing United and FedEx Hangar for future apron
Provided civil risk matrix for apron, runway pavement, drainage, and future utility connections and presented to client
Created schematic Paving and Striping plans with aircraft configuration per FAA and LAWA regulations.
Additional Project Experience
02.2019 - Current
Produced roadway pavement, drainage system and firewater pump station for Guggenheim Museum (Abu Dhabi)
Procured technical documents as owner representative for government building in Sacramento and UCI Health Center
Submitted LABOE B-Permit Grading, Drainage, Sewer plans for Wrapper Tower and LAWA RUE
Create multiple grading sketches and coordinate masterplan for confidential data centers in Canada and Berlin.
Lead Civil Engineer
West Campus
09.2023 - 10.2023
Receiving Station (RS-X)
01.2021 - 08.2023
Developed construction documents for 34.5kV duct bank and electrical Receiving Station per LAWA and DWP standards
Designed electrical duct bank, substation, cable trenches and pavement
Submitted RFIs and submittals; coordinated changes with contractor and electrical subconsultant during construction phase.
John Wayne Airport
07.2019 - 07.2020
Developed schematic design and design development civil plans for new BESS electrical equipment
Modeled site grading and pavement per airport specifications and County of Orange
Designed electrical and storm drain system for connections to airport central utility plant.
Delta Terminal 2 and 3
02.2019 - 02.2020
Provided responses for RFIs and submittals for apron drainage and pavement
Resolved utility conflicts with contractor by reviewing Delta terminals 2 and 3 As-Builts and issuing pothole exhibits
Modeled sanitary sewer lines to service redeveloped terminal 3.
Field/ Office Engineer Intern
Hensel Phelps- LAX Airport Terminal 7 United Redevelopment Program
05.2017 - 08.2017
Created RFI’s, submittals, and change orders for various disciplines
Organized concrete pour for United apron and staked out site for asphalt demolition
Created evacuation map signage for three different turnover locations at United Terminal 7.
Education
Bachelor of Science in Civil Engineering -
New York University School of Engineering
12.2018
Skills
Experience in AutoCAD, Civil 3D, Revit, Revit, Bluebeam, Microsoft office suite programs and familiar with AutoTURN, ArcGIS Pro, and SAP
Hydraulic Modeling and Design: WSPG, Hydrocalc
Fluent in Spanish
Community Service
Los Angeles Team Mentoring (LATM), Mentor, 09/2021, 05/2022, Mentored 20 students at Richard Merkin Middle School, provided guidance on team building and communication skills
Viva Arup Employee Resource Group, Professional Development Chair, 04/2023, Present, Organizes office-wide social events to celebrate Latin employees and engage Arup employees
Certification
ENV SP
Timeline
Lead Civil Engineer
West Campus
09.2023 - 10.2023
Lead Civil Engineer
Energy Vault Snyder
09.2022 - Current
Project Coordinator
Roadways Utilities Enabling (RUE) Works
01.2021 - Current
Receiving Station (RS-X)
01.2021 - 08.2023
John Wayne Airport
07.2019 - 07.2020
Civil Engineer Level 3
Arup
02.2019 - Current
Additional Project Experience
02.2019 - Current
Delta Terminal 2 and 3
02.2019 - 02.2020
Field/ Office Engineer Intern
Hensel Phelps- LAX Airport Terminal 7 United Redevelopment Program