Highly skilled Pipe Layer with experience in laying and joining pipe for water, sewer, and storm drain systems. Strengths include ability to read blueprints, operate heavy machinery, and adhere to safety protocols. Demonstrated history of successfully completing projects on time while maintaining high quality standards. Significant contributions made towards improving efficiency in previous roles.
Overview
20
20
years of professional experience
Work History
Pipelayer
M.A.P
Edmonton, Alberta
04.2024 - 10.2024
Used measuring instruments like levels, transits and laser devices for accurate positioning of pipes.
Maintained records related to work performed on pipelines and other associated systems.
Measured distances between points to determine the length of pipe needed for a job.
Repaired leaking joints in pipelines using welding equipment.
Laid out and marked underground pipe routes to ensure accuracy of installation.
Analyzed blueprints and technical documents prior to starting construction projects.
Put in new fire hydrants, gate valves and fire lines to support city requirements.
Assessed pipes to ensure zero leakage and proper functionality.
Operated rollers, front-end loaders and backhoes for site work.
Verified that all safety protocols were followed while performing duties.
Assisted in the excavation of trenches for pipe laying.
Located existing pipes requiring repair or replacement using magnetic and radio indicators.
Handled assembly and installation of underground piping, fittings and valves for storm drains and water mains.
Filled pipes with sand or resin to prevent distortion for proper installation.
Assembled prefabricated parts such as chambers, manholes, catch basins.
Followed written instructions, schematics and blueprints to lay out pipe in correct arrangements.
Underground Foreman
Golderado contracting Corp. P.M.E
Edmonton, Alberta
04.2022 - 12.2023
Managed inventory levels of supplies necessary for successful completion of jobsites.
Conducted regular performance reviews of employees under my supervision.
Developed and implemented safety protocols for underground workers.
Inspected equipment to identify any potential hazards or maintenance needs.
Ensured compliance with all applicable regulations, policies, and procedures.
Investigated accidents or incidents that occurred within the underground environment.
Defined and monitored personnel and project schedules to ensure on-time project completion.
Established and enforced procedures and work standards, promoting team performance and safety.
Organized emergency response drills for underground personnel, ensuring everyone was prepared for any potential incidents.
Kept production team moving forward for progress in daily site operations.
Communicated with suppliers and coordinated delivery of supplies to job sites.
Managed workers at various experience levels in construction and restoration projects.
Coordinated with other supervisors on job sites to ensure efficient workflow.
Trained and monitored employees to teach daily tasks and improve performance.
Learned about new equipment and related attachments while maintaining knowledge of items used daily to meet job requirements.
Maintained detailed records of hours worked, materials used, and completed jobs.
Operated excavators and other construction equipment to properly grade land.
Maintained equipment on-site with regular maintenance and repairs.
Operated equipment to move and position raw materials or finished components.
Pipe Layer
M.A.P
Edmonton, Alberta
04.2021 - 11.2021
Inspected existing pipeline systems for defects and malfunctions.
Assembled prefabricated parts such as chambers, manholes, catch basins.
Followed written instructions, schematics and blueprints to lay out pipe in correct arrangements.
Connected pipes with fittings such as elbows, tees, couplings, valves and clamps.
Located existing pipes requiring repair or replacement using magnetic and radio indicators.
Operated rollers, front-end loaders and backhoes for site work.
Cleaned debris from worksites following completion of tasks.
Operated backhoe to dig trenches for water and sewer pipe.
Graded and leveled trench bases using tamping machines and hand tools.
Installed pipes using hand tools, power tools and heavy machinery.
Used measuring instruments like levels, transits and laser devices for accurate positioning of pipes.
Located underground utilities in preparation for digging and marked locations to prevent damage.
Handled assembly and installation of underground piping, fittings and valves for storm drains and water mains.
Directed equipment operators and alerted to hazards by using effective hand signals.
Lead Hand
GS Construction
Edmonton, Alberta
04.2020 - 11.2020
Ensured that all safety protocols were followed at all times.
Trained employees on company procedures and worksite safety.
Offered training and support to keep team members motivated and working toward objectives.
Managed inventory levels to ensure sufficient stock availability while minimizing costs.
Promoted to leadership position in recognition of strong work ethic and provided exceptional customer service.
Trained, mentored and supervised junior staff members.
Allocated resources effectively to ensure project completion within deadlines and budget.
Managed conflict resolution within the team to maintain a positive work environment.
Developed strategies for improving efficiency in the workplace.
Demonstrated strong problem-solving skills, resolving issues efficiently and effectively.
Operated equipment and machinery according to safety guidelines.
Installed sewer, water or storm drain pipes using pipe-laying machinery or laser guidance equipment.
Blue print reading and grades with transit eye level.
Lead Hand
Golderado contracting Corp. P.M.E
Edmonton, Alberta
05.2019 - 10.2019
Ensured that all safety protocols were followed at all times.
Identified areas for improvement in workflow processes.
Collaborated with other movers when loading large equipment to prevent potential accidents.
Trained employees on company procedures and worksite safety.
Established clear team goals aligned with company objectives, tracking progress regularly.
Mentored newly hired employees on machine operations and implemented training on safety procedures to prevent injuries.
Completed daily quality assurance duties to provide feedback for improvements.
Provided guidance to team members on best practices for their tasks and duties.
Coordinated daily operations, ensuring team adherence to company policies and procedures.
Carried necessary tools and supplies to transportation vehicles and returned to proper storage areas after use.
Facilitated team meetings to discuss targets, strategies, and address any issues.
Used laser measuring tools to calculate lengths, widths, and heights.
Determined grades and shots with transit eye level.
Pipe Layer
Streamline Construction
Edmonton, Alberta
03.2016 - 10.2019
Collaborated with team members in order to ensure successful completion of tasks.
Performed backfilling operations after completing piping installations.
Assembled prefabricated parts such as chambers, manholes, catch basins.
Followed written instructions, schematics and blueprints to lay out pipe in correct arrangements.
Connected pipes with fittings such as elbows, tees, couplings, valves and clamps.
Located existing pipes requiring repair or replacement using magnetic and radio indicators.
Operated rollers, front-end loaders and backhoes for site work.
Graded and leveled trench bases using tamping machines and hand tools.
Used measuring instruments like levels, transits and laser devices for accurate positioning of pipes.
Located underground utilities in preparation for digging and marked locations to prevent damage.
Handled assembly and installation of underground piping, fittings and valves for storm drains and water mains.
Directed equipment operators and alerted to hazards by using effective hand signals.
Operated heavy machinery including tractors, bulldozers and loaders safely at worksites.
Repaired sanitary and storm water sewer structures and pipe systems.
Assisted in the excavation of trenches for pipe laying.
Pipe Layer Helper
Eng-Con Holdings Ltd
Edmonton, Alberta
04.2009 - 09.2015
Inspected installations to repair leaks and make adjustments to pipes.
Assisted pipe layer with the installation of underground pipes and conduits.
Identified and located required tools prior to starting each project.
Reported any issues encountered during work shifts promptly to supervisors for proper resolution.
Assembled and secured pipes, tubes and fittings according to specifications and welded, soldered and threaded joints.
Maintained clean worksites throughout the duration of projects by removing debris and disposing it appropriately.
Set alignment and grade using laser.
Collaborated with team members in order to complete tasks efficiently within set deadlines.
Operated backhoe to dig trenches for water and sewer pipe.
Verified and gathered measurements to determine proper piping sizes.
Cut and beveled piping using cutting torches, saws and threading machines.
Assisted in the excavation process for trenching activities.
Provided support to pipe layers as needed during installation or maintenance operations.
Operated power equipment such as trenchers, saws, drills and other related machinery when necessary.
Laborer/Pipe Layer Helper
Sureway Construction
Edmonton, Alberta
05.2004 - 10.2008
Mixed, poured, and spread concrete, asphalt gravel, and other materials.
Learned and mastered skilled trade specialties under guidance of expert mentors.
Dug ditches or trenches, backfilled excavations or compacted and leveled earth to grade specifications.
Loaded materials and tools into vehicles and unloaded upon arrival at jobsites.
Tended pumps, compressors or generators to provide power or heat or move materials.
Maintained clean, safe working environment by removing debris from job site prior to shift completion.
Demonstrated best safety practices working at heights and lifting various objects.
Cleaned work area after job completion ensuring all debris is properly disposed of.
Operated various power tools such as drills and saws safely while following manufacturer's instructions.
Met company and OSHA safety guidelines for work site operations to minimize worker risk.
Positioned, aligned or sealed concrete wall sections or pipes.
Measured and marked pipes for cutting and threading and demonstrated knowledge and skills in safe rigging practices.
Education
High School Diploma -
M.E Lazerte High School
Edmonton, AB
06-2004
Skills
Company policy support
Soil compaction
Trench safety
Drainage systems
Valve installation
Excavation techniques
Effective communication
Pipe cutting
Equipment and tools
Storm drain piping
Backfilling procedures
Safety procedures
Pipe installation
Pipe alignment
Pipe grading
Water main installation
Safety meetings
Pressure testing
Timeline
Pipelayer
M.A.P
04.2024 - 10.2024
Underground Foreman
Golderado contracting Corp. P.M.E
04.2022 - 12.2023
Pipe Layer
M.A.P
04.2021 - 11.2021
Lead Hand
GS Construction
04.2020 - 11.2020
Lead Hand
Golderado contracting Corp. P.M.E
05.2019 - 10.2019
Pipe Layer
Streamline Construction
03.2016 - 10.2019
Pipe Layer Helper
Eng-Con Holdings Ltd
04.2009 - 09.2015
Laborer/Pipe Layer Helper
Sureway Construction
05.2004 - 10.2008
High School Diploma -
M.E Lazerte High School
Similar Profiles
Derek PetersonDerek Peterson
Heavy Equipment Operator at M.A.P EarthworksHeavy Equipment Operator at M.A.P Earthworks