Summary
Overview
Work History
Education
Skills
LANGUAGES
Timeline
Generic

ROMEL GARCIA

Edmonton,Canada

Summary

Detail-oriented individual with exceptional communication and project management skills. Proven ability to handle multiple tasks effectively and efficiently in fast-paced environments. Recognized for taking a proactive approach to identifying and addressing issues, with a focus on optimizing processes and supporting team objectives.

Overview

36
36
years of professional experience

Work History

Pipefitter General Foreman

DCM Group @ BHP Jansen Potash Project Sk
Leroy, Saskatchewan
08.2026 - Current
  • Directed piping crews on Bird Construction sites.
  • Coordinated daily work plans with Bird Construction supervisors.
  • Reviewed piping drawings and isometric layouts.
  • Enforced safety procedures and jobsite compliance.
  • Scheduled materials, tools, and equipment deliveries.
  • Trained journeypersons and apprentices on field tasks.

Piping Foreman

Bird Construction ADT Keyera
Edmonton, Alberta
05.2026 - 07.2026
  • Directed piping crews on Bird Construction sites.
  • Coordinated daily work plans with Bird Construction supervisors.
  • Reviewed piping drawings and isometric layouts.
  • Enforced safety procedures and jobsite compliance.
  • Trained journeypersons and apprentices on field tasks.
  • Communicated progress with Bird Construction project teams.
  • Directed fabrication of components needed for specific jobs.
  • Provided technical support to pipefitters during installations.

Piping Foreman

Bird Construction
Calgary
02.2026 - 05.2026
  • Supervised installation of new boiler, bio gas, and digester piping, ensuring adherence to safety regulations.
  • Coordinated daily crew activities to enhance workflow and streamline operations.
  • Mentored junior staff on pipe fabrication and assembly best practices, fostering skill development and knowledge sharing.
  • Conducted regular inspections to maintain quality standards and identify potential issues.
  • Collaborated with project managers to develop and implement work schedules effectively.
  • Resolved technical challenges in piping systems, contributing to successful project completion.
  • Calgary Compost Facility

Piping / Mechanical Foreman

SITE Resource Group
Suncor Firebag
11.2025 - 01.2026
  • Assembled and installed modules, ensuring compliance with specifications and project standards.
  • Prepared technical analysis documentation
  • Supervised mechanical crews for SITE Resource Group field projects
  • Coordinated daily work plans with Site Resource Group supervisors
  • Reviewed drawings, specifications, and installation details

Piping / Mechanical Foreman

SITE Resource Group
Cargill, Saskatchewan
08.2025 - 11.2025
  • Supervised daily operations of mechanical teams, ensuring adherence to project timelines and quality standards.
  • Coordinated maintenance schedules for machinery, reducing downtime and improving operational efficiency.
  • Coordinated maintenance schedules for machinery, minimizing downtime and supporting smoother operations.
  • Implemented process improvements that streamlined workflows, enhancing execution of mechanical tasks.

Piping/Mechanical Lead

Pitt Meadows Plumbing & Mechanical Systems
Oakridge District Energy Unit, BC
11.2023 - 05.2025
  • Oversaw equipment and piping installations, ensuring compliance with project specifications to facilitate successful project delivery. Managed fabrication operations, streamlining processes to enhance overall operational efficiency. Directed piping and equipment installations , hydro testing and flushing procedures to maintain safety standards. Supervised reinstatement activities to facilitate project completion. Led commissioning efforts to ensure operational readiness.
  • Completed day-to-day duties accurately and efficiently.
  • Contributed innovative ideas and solutions to enhance team performance and outcomes.
  • Worked successfully with diverse group of coworkers to accomplish goals and address issues related to our products and services.

Superintendent

Centurion Canada Infrastructure Inc.
Suncor FortHills
07.2023 - 10.2023
  • Oversaw daily operations, ensuring project compliance and upholding quality standards, resulting in consistent delivery of high-quality outcomes.
  • Oversaw daily operations to ensure project compliance and quality standards.
  • Reviewed plans and inspected ongoing construction to keep work in line with project goals.
  • Mentored junior staff, fostering skill development that contributed to enhanced team collaboration and overall project success.
  • Established effective quality control measures for consistent delivery of high-quality construction projects.
  • Implemented safety protocols for reduced workplace accidents and improved employee wellbeing.
  • Maintained safety onsite and upheld all OSHA regulations by Action.
  • Reviewed design specifications for accuracy, identifying and addressing potential issues early to prevent costly delays or rework.
  • Streamlined processes through continuous improvement initiatives, enhancing overall productivity.
  • Evaluated project progress, identifying areas for improvement and implementing corrective actions.
  • Analyzed project data to drive informed decision-making and strategic adjustments.
  • Resolved conflicts efficiently among team members, fostering a positive work environment that contributed to successful outcomes.
  • Supported project coordination and smooth workflow by coordinating materials, inspections, and contractor actions.
  • Mentored junior staff, leading to increased productivity and improved teamwork throughout the organization.
  • Scheduled and supervised maintenance and repair of equipment, buildings and grounds.
  • Analyzed reports to identify areas of improvement and implement corrective action.

Piping Foreman

Kiewit
Trans Mountain West Ridge Terminal, Bc
10.2022 - 05.2023
  • Supervised installation and maintenance of piping systems, ensuring compliance with safety standards.
  • Coordinated daily operations and workflow among crew members to enhance team efficiency.
  • Coordinated daily operations and workflow among crew members to optimize productivity.
  • Inspected installed systems, identifying areas for improvement and facilitating necessary repairs.
  • Enhanced team productivity by providing ongoing training on best practices, techniques, and safety procedures related to piping systems.
  • Conducted inspections of installed systems, identifying areas for improvement and necessary repairs.
  • Maintained comprehensive daily logs and progress reports to track project activities.
  • Created custom piping and parts based on specific project requirements and specifications.
  • Resolved technical issues during construction projects by applying extensive knowledge of industry standards, codes, and regulations.

Piping Foreman

Bird Construction-Nutrient
Lanigan, SK
08.2022 - 10.2022
  • Managed inventory of materials and tools for ongoing projects, reducing delays.
  • Implemented process improvements that enhanced efficiency in project execution timelines.
  • Developed training programs to enhance team skills and knowledge in advanced piping techniques.
  • Maintained cost-effective inventory of spare parts, supporting production goals.
  • Identified areas for improvement in material usage, reducing waste and optimizing processes for cost savings.
  • Ensured safety compliance through regular inspections of tools and equipment, conducting toolbox talks, and enforcing company policies.

Piping General Foreman

DCM Integrated Solutions Inc
Fort McMurray, AB
05.2022 - 07.2022
  • Supervised daily piping operations, ensuring compliance with safety regulations and project specifications.
  • Coordinated team activities to streamline workflow and ensure timely project completion.
  • Trained and mentored junior staff on installation techniques and quality control standards.
  • Implemented process improvements that increased efficiency in piping system installations.
  • Conducted regular inspections to ensure adherence to industry codes and client requirements.
  • Collaborated with engineering teams to resolve technical issues during project execution.
  • Developed training programs to promote best practices in piping installation and reinforce safety protocols.
  • Ensured safety compliance on worksites by enforcing strict adherence to safety policies and procedures.

Piping Foreman

Kiewit Construction Services ULC
Fort Saskatchewan, AB
06.2021 - 02.2022
  • Executed pre-commissioning activities, confirming system readiness for operations.
  • Supervised piping crews during Bird Construction ADT Keyera field installation work.
  • Coordinated daily tasks with Keyera operations and site supervision.
  • Reviewed isometric drawings and piping plans before work execution.

Piping Supervisor

DCM Group
Edmonton, AB
04.2021 - 06.2021
  • Coordinated response efforts during air products outage, maintaining operational continuity.
  • Assisted in removal and replacement of reformer tubes, supporting blinding and de-blinding of exchangers, and facilitating rigging and bolt-up activities, including torquing.
  • Supervised piping crews on DCM Group industrial work sites.
  • Reviewed isometric drawings and piping layouts for installation work.
  • Coordinated piping repairs with welders, fitters, and site teams.

Piping Foreman

Kiewit Construction Services ULC
Fort Saskatchewan, AB
07.2019 - 04.2021
  • Managed construction activities for propane dehydrogenation and polypropylene plant, following safety and quality standards at IPL Heartlands Petrochemical Complex.
  • Directed piping crews on Bird Construction ADT Keyera worksite
  • Coordinated daily work with Keyera operations and field supervision
  • Interpreted isometric drawings, blueprints, and piping specifications

Piping Foreman

Young EnergyServe Inc
Conoco Philips Fort McMurray
05.2019 - 07.2019
  • Executed flange breakage under air pressure and installed blinds following lockout/tagout (LOTO) procedures.
  • Executed installation of ventilation systems for jf20 air horn to enhance operational efficiency.
  • Executed installation of ventilation systems for jf20 air horn, improving air flow and operational efficiency.
  • Executed installation of robotic cannon, increasing operational capabilities and enhancing system performance.
  • Executed debulking operations to prepare tanks for maintenance work. for tank maintenance.
  • Facilitated re-instatement processes to ensure compliance with organizational policies.
  • Assisted teams in completing projects on schedule and within budget, facilitating project coordination and improving collaboration through effective problem-solving.

Piping Foreman

On Site
Kirby Lake
01.2019 - 02.2019
  • Oversaw Kirby North Phase 1 project execution and management.
  • Supported team in executing hydro-related tasks, maintaining equipment and tools to facilitate project completion and uphold safety protocols.
  • Implemented shutdown procedures to ensure safety and compliance during project operations. to ensure safety and compliance.

Piping/Mechanical Foreman

DCM Integrated Solutions Inc
CNRL Horizon Fort McMurray, Ab
12.2018 - 12.2018
  • Replaced conveyor roller frame and reject retaining wall for mining train #1 and #3, enhancing equipment reliability during upgrades. Collaborated with maintenance teams to ensure operational efficiency and timely project completion.
  • Tracked project timelines and milestones to ensure alignment with December 2018 deadlines.
  • Supervised mechanical crews on integrated solutions projects
  • Scheduled daily work for shop and field maintenance tasks
  • Inspected equipment and verified safe mechanical installation practices

Piping Foreman

DCM Integrated Solutions Inc
CNRL Horizon, AB
10.2018 - 11.2018
  • Replaced boiler tubes and performed membrane welding using orbital machine technology to enhance system functionality.
  • Led piping crew on Bird Construction ADT Keyera site work
  • Coordinated daily pipe installation with trades and site supervisors
  • Interpreted isometric drawings and piping specifications for field layout

Piping Foreman

DCM Integrated Solutions Inc
Fort McMurray, AB
09.2018 - 09.2018
  • Rebuilt furnace 32-F-1 cell A/B, installing replacement tubes and new skin thermocouples to enhance operational reliability. Coordinated installation of additional observation door panels to improve access for maintenance inspections. Led blinding and de-blinding bolt-up torquing activities, ensuring safety and compliance during operations.
  • Directed piping crews on Bird Construction ADT Keyera site
  • Interpreted isometric drawings and routing plans for field installation
  • Coordinated daily work with welders, pipefitters, and rigging crews

Piping Foreman

Bird Construction
Sparwood, CA
05.2018 - 08.2018
  • Oversaw installation of product storage tanks, modular buildings, pumps, sumps, and process piping, ensuring alignment with project specifications. Coordinated measurement and sketching for field operations to facilitate precise installations. Managed erection, rigging, and hydrotesting activities, ensuring compliance with safety and regulatory standards.
  • Directed piping crews on Bird Construction ADT Keyera site
  • Planned daily work with field supervisors and trades
  • Coordinated pipefitters, welders, and riggers in active work zones

Mechanical Foreman

DCM Integrated Solutions Inc
CNRL Horizon, Ab
09.2017 - 05.2018
  • Facilitated commissioning and startup processes at plants 44 and 45 at SUG 2, contributing to operational readiness. Supported repair efforts for mine shaker across trains 1 through 5, ensuring equipment reliability.
  • Coordinated project efforts to ensure timely completion within budget, enhancing team collaboration and communication. Contributed to problem-solving initiatives that improved overall project outcomes.
  • Supervised mechanical crews for DCM Integrated Solutions Inc site installations.
  • Coordinated piping, HVAC, and equipment work across active project areas.
  • Reviewed drawings, specifications, and permits for mechanical field tasks.

Piping Foreman

DCM Integrated Solutions Inc
CNRL Horizon, AB
08.2017 - 09.2017
  • Assisted in managing sulfur outage at plant 5152 53 54 55 & 56. Supported team efforts to minimize downtime and maintain operational efficiency. Collaborated with maintenance staff to address issues promptly.
  • Supervised piping crews on Bird Construction ADT Keyera project site.
  • Coordinated daily work plans with foremen, welders, and pipefitters.
  • Verified piping layouts against drawings, isometrics, and site specifications.

Piping Superintendent

DCM Integrated Solutions Inc
CNRL Horizon, Ab
03.2013 - 05.2017
  • Led project teams in constructing gas recovery unit plant 33, ensuring compliance with safety and quality standards. Oversaw development of hydrogen sulphate unit plant 31, coordinating resources and schedules to meet project milestones. Managed construction of bitumen upgrader-vacuum distillation unit and diluent recovery unit plants 31A and 32, directing cross-functional teams to achieve project objectives. Directed efforts for the new cogen plant 62.
  • Supervised piping crews across DCM Integrated Solutions industrial project sites.
  • Coordinated pipefitters, welders, and subcontractors during field installation work.
  • Reviewed isometric drawings and piping layouts for installation accuracy.

Journeyman Red Seal Steamfitter/Pipefitter

King Oilfield Contracting
Rocky Mountain House, CA
10.2012 - 11.2012
  • Directed initiatives to resolve seamcams K3 outages. Oversaw troubleshooting processes to minimize downtime and elevate service delivery standards.

Piping Foreman

Flint Transfield Services
Suncor Base Plant, AB
06.2012 - 07.2012
  • Coordinated maintenance activities during Suncor base plant outage, ensuring team adhered to safety protocols and operational procedures for effective task completion.
  • Supervised piping crews on Bird Construction ADT Keyera industrial projects.
  • Coordinated pipefitters, welders, and helpers across active work fronts.
  • Reviewed drawings, isometrics, and work packages for field installation.

Journeyman Red Seal Steamfitter/Pipefitter

PCL Industrial Constructors Inc
Kearl Lake, Ab
08.2011 - 05.2012
  • Managed operations at Kearl Lake Project

Journeyman Red Seal Steamfitter/Pipefitter

PCL Industrial Constructors Inc
Edmonton, CA
08.2009 - 10.2010
  • Shell Scottford Upgrader

Journeyman Red Seal Steamfitter/Pipefitter

LED COR
Nisku, Modyard
10.2007 - 01.2009
  • Managed module yard operations efficiently

Journeyman Red Seal Steamfitter/Pipefitter

LED COR
Edmonton, CA
05.2006 - 04.2007
  • Nexen Long Lake Project

Piping Supervisor

Keppel Shipyard Ltd
Singapore
06.2000 - 10.2003
  • Coordinated shipbuilding initiatives across departments to meet project milestones. Managed conversion operations for floating production storage and offloading units, improving operational efficiency. Directed repair efforts to ensure adherence to safety and quality standards.
  • Coordinated pipe installation with drawings, specifications, and field conditions.
  • Inspected piping work for alignment, fit-up, and code compliance.

Fabrication Foreman

Atlantic Gulf and Pacific
Manila
03.1991 - 10.1994
  • Oversaw fabrication processes for pressure vessels and piping systems, achieving compliance with industry standards. Coordinated with cross-functional teams to streamline operations, resulting in improved workflow. Managed project timelines to ensure on-time delivery of projects.
  • Supervised fabrication crews in Atlantic Gulf and Pacific yard operations.
  • Coordinated pipe and structural steel fabrication with production schedules.
  • Interpreted shop drawings, isometrics, and material specifications for field work.

Education

Industrial -

College of Industrial Technology
Manila, PH

Skills

  • Construction Professional
  • Project scheduling
  • Time management
  • Leadership skills
  • Team collaboration
  • Problem-solving
  • Multitasking Abilities
  • Time organization
  • Calm under pressure
  • Decision-making

LANGUAGES

English, Full Professional

Timeline

Pipefitter General Foreman

DCM Group @ BHP Jansen Potash Project Sk
08.2026 - Current

Piping Foreman

Bird Construction ADT Keyera
05.2026 - 07.2026

Piping Foreman

Bird Construction
02.2026 - 05.2026

Piping / Mechanical Foreman

SITE Resource Group
11.2025 - 01.2026

Piping / Mechanical Foreman

SITE Resource Group
08.2025 - 11.2025

Piping/Mechanical Lead

Pitt Meadows Plumbing & Mechanical Systems
11.2023 - 05.2025

Superintendent

Centurion Canada Infrastructure Inc.
07.2023 - 10.2023

Piping Foreman

Kiewit
10.2022 - 05.2023

Piping Foreman

Bird Construction-Nutrient
08.2022 - 10.2022

Piping General Foreman

DCM Integrated Solutions Inc
05.2022 - 07.2022

Piping Foreman

Kiewit Construction Services ULC
06.2021 - 02.2022

Piping Supervisor

DCM Group
04.2021 - 06.2021

Piping Foreman

Kiewit Construction Services ULC
07.2019 - 04.2021

Piping Foreman

Young EnergyServe Inc
05.2019 - 07.2019

Piping Foreman

On Site
01.2019 - 02.2019

Piping/Mechanical Foreman

DCM Integrated Solutions Inc
12.2018 - 12.2018

Piping Foreman

DCM Integrated Solutions Inc
10.2018 - 11.2018

Piping Foreman

DCM Integrated Solutions Inc
09.2018 - 09.2018

Piping Foreman

Bird Construction
05.2018 - 08.2018

Mechanical Foreman

DCM Integrated Solutions Inc
09.2017 - 05.2018

Piping Foreman

DCM Integrated Solutions Inc
08.2017 - 09.2017

Piping Superintendent

DCM Integrated Solutions Inc
03.2013 - 05.2017

Journeyman Red Seal Steamfitter/Pipefitter

King Oilfield Contracting
10.2012 - 11.2012

Piping Foreman

Flint Transfield Services
06.2012 - 07.2012

Journeyman Red Seal Steamfitter/Pipefitter

PCL Industrial Constructors Inc
08.2011 - 05.2012

Journeyman Red Seal Steamfitter/Pipefitter

PCL Industrial Constructors Inc
08.2009 - 10.2010

Journeyman Red Seal Steamfitter/Pipefitter

LED COR
10.2007 - 01.2009

Journeyman Red Seal Steamfitter/Pipefitter

LED COR
05.2006 - 04.2007

Piping Supervisor

Keppel Shipyard Ltd
06.2000 - 10.2003

Fabrication Foreman

Atlantic Gulf and Pacific
03.1991 - 10.1994

Industrial -

College of Industrial Technology
ROMEL GARCIA