Summary
Overview
Work History
Education
Skills
Current Position
Contacts
History Experience
Personal Information
Languages
Affiliations
Certification
Timeline
Generic

Roberto Santander Borges

Toronto,Canada

Summary

Mechanical engineer, with an extensive career of approximately 30 years in leadership positions in engineering projects having worked in all project phases: design, construction, commissioning, start-up and handover mainly in the oil & gas industry and the construction sector. In addition, 12 years in operations, & maintenance, supervising personnel and plant management for the oil industry complemented and strengthened these management skills. Experienced in the management tasks: budget, planning, follow-up, tracking, directing, handing over, leading and supervising personnel, control projects, develop strategies, and procedures.

Overview

15
15
years of professional experience
1
1
Certification

Work History

Contract Administrator

HH Angus & Associates
06.2023 - 11.2023
  • Worked, managing mechanical scope for renovation contract of 7 projects inside Sunny Brook Hospital
  • Monitored construction of Mechanical Systems: Ductwork, Fire Protection, Medical Gases, Plumbing, HVAC
  • Monthly report generated including progress, found deficiencies and correction actions.
  • All RFI's processed and responded
  • CCNs, reviewed and recommended monthly payments according to progress.

Cx Specialist

HH ANGUS & Associates
11.2022 - 06.2023
  • Developed some mechanical scripts (Commissioning Procedures) for a Project in Spain (Data Centres) HVAC – chillers, compressors, pumps, heat exchangers, temperature control systems, Water Supply Systems, Power generators, etc
  • 3 renovation building projects were completed and successfully commissioned.

Cx Process Leader

ACTEMIUM/SAMSUNG/INPEX
06.2013 - 01.2019
  • Mega-Project called "Ichthys Gas Platform" I worked during construction in South Korea as part of the team that did the preparation and organized the CX of process and utilities facilities; once the platform was installed I led the team that performed the Cx and start-up of process facilities
  • Commissioned three (3) gas treatment separation trains and four (4) HP compressors on time and with zero accidents
  • Executed the Cx process procedures, and coordinated with operations to start up the process facilities and gas production
  • Leading the development of the Operational Test Procedures (150 process & utilities OTPs)
  • Created detailed documentation of processes, allowing for easy replication across various teams within the organization.

Cx Unit Leader

MPH/SATORP
05.2012 - 04.2013
  • Mega-Project: Jubail Refinery – Distillation & Hydro Treatment Units Managed.
  • EPCC contract to execute Commissioning of Distillation unit and Hydro Treating unit of Jubail refinery which were prepared and executed successfully.
  • Established a positive work environment by promoting collaboration, fostering open dialogue, and addressing conflicts proactively.
  • Established a positive work environment by promoting collaboration, fostering open dialogue, and addressing conflicts proactively.

Cx Supervisor

BRUNEL/ QATARGAS
08.2010 - 08.2011
  • Mega-Project: RALF – Loading Diesel Truck Facilities in Qatar Refinery The technical assistance of the construction’s contractor to ensures the quality of work and the proper execution of commissioning activities
  • Supervision of safety for working/isolation practices during commissioning phases
  • The development of Operational Test Procedures (OTPs) of defined sub-systems
  • Preparation, planning and execution of Mechanical commissioning activities, and punch lists.
  • Maintained a safe and organized work environment by enforcing safety protocols and inventory management systems.

Pre-Commissioning Supervisor

ECOPETROL
01.2010 - 03.2010
  • Project: Expansion Barranca B. Refinery
  • Responsible for the development of Pre-commissioning and commissioning procedures
  • Pre-commissioning activities like Flushing, chemical cleaning of pipes, air blowing, steam blowing and leak test.
  • Conducted thorough inspections of installed systems to guarantee proper functioning before handover to clients.

Pre-Commissioning Supervisor

PPMS/ TECHNIP
04.2009 - 07.2009
  • Project: Olefin Chemical Plant Responsible for: Supervising Pre-commissioning and Commissioning activities
  • Supervising the subcontracted activities such as the installation of labels on the entire plant, including equipment, utilities, pipelines, chemical packages, and safety signs.
  • Identified and resolved potential problems to achieve and maintain high-quality standards.
  • Streamlined reporting processes, enabling accurate tracking of commissioning progress throughout each project lifecycle.

Education

Bachellor Equivalency - Mechanical Engineering

WES - World Education Service
Canada
12.2020

Master of Science - Mechanical Engineering

University of Michigan
Ann Arbor, MI. USA
12.1984

Bachelor of Science - Mechanical Engineering

Polytecnical Institute LCM
Caracas, Venezuela
03.1981

Skills

  • Project Management
  • Strong Leadership
  • Team management
  • Organizational skill
  • Risk and time management
  • Compromised with safety
  • Cost Control
  • Problem-solving
  • Project Management methodologies
  • Good listening skill
  • Strategic planning
  • Proficiency in the use of Microsoft Word, Excel, Power Point, Outlook, Project
  • Leadership skill and ability to work either independently and or in team environment
  • Multitasking environment
  • Experience working with consultants and contractors
  • Great experience in commissioning process

Current Position

Project Manager

Contacts

2308 - 600 Fleet Street, Toronto, ON, M5V 1B7, +1 (647)671 5102, rsantander6655@hotmail.com

History Experience

  • 06/2023-11/2023, Contract Administrator, HH Angus & Associates, Toronto, Managed 7 projects of renovation inside Sunnybrook Hospital, Systems: Ductwork, Fire Protection, Medical Gases, Plumbing, HVAC, Generated a monthly report, including progress, deficiencies, etc., Processed and responded RFI’s, CCN’s, Reviewed and recommended monthly payments
  • 11/2022-06/2023, Cx Specialist, HH ANGUS & Associates, Toronto, Developed some mechanical scripts (Commissioning Procedures) for a Project in Spain (# building data Centres), HVAC – chillers, compressors, pumps, heat exchanger, temperature control system, etc. Water Supply system, Power generators, etc., Completed the commissioning of 3 building renovation projects. Systems: VAV’s, Electromagnetic Lock Device (Maglock), and Fire Protection
  • 06/2023-01/2019, Cx Process Leader, ACTEMIUM/SAMSUNG/INPEX, S. Korea - Australia, Mega-Project: Ichthys Gas Platform, I worked during construction in S. Korea as part of the team that did the preparation and organize the CX of process and utilities facilities; and once the platform was installed leaded the team that perform the Cx and start-up of process facilities, Commissioned three (3) gas treatment separation trains and four (4) HP compressors on time and with zero accidents, Executed the Cx process procedures, and the coordination with operations to start-up the process facilities and gas production, Leading the development of the Operational Test Procedures (150 process & utilities OTPs)
  • 05/2012-04/2013, Cx Unit Leader, MPH/SATORP, Jubail, Mega-Project: Jubail Refinery – Distillation & Hydro Treatment Units, Managed the EPCC contract to execute the Commissioning of the Distillation unit and Hydro Treating unit of the Jubail refinery which were prepared and executed successfully
  • 08/2010-08/2011, Cx Supervisor, BRUNEL/QATARGAS, Ras Laffan, Mega-Project: RALF – Loading Diesel Truck Facilities in Qatar Refinery, The technical assistance of the construction’s contractor to ensures the quality of work and the proper execution of commissioning activities, The Supervision of safety for working / isolation practices during commissioning phases, The development of Operational Test Procedures (OTP´s) of defined sub-systems, Preparation, planning and execution of Mechanical commissioning activities, punch lists
  • 01/2010-03/2010, Pre-Commissioning Supervisor, ECOPETROL, Barrancas, Project: Expansion Barranca Bermejas Refinery, Responsible for the development of the Pre-commissioning and commissioning procedures, Supervision of the Pre-commissioning activities in pipelines, like hydraulic pressure flushing, acid chemical cleaning, air blowing, steam blowing and leak test
  • 04/2009-07/2009, Pre-Commissioning Supervisor, PPMS/TECHNIP, Ras Laffan, Project: Olefin Chemical Plant, Supervising Pre-commissioning and Commissioning activities, Supervising the subcontracted activities such as: installation of labels on the entire plant, included equipment, utilities, pipelines, chemical packages, safety signs
  • 03/2005-10/2007, Commissioning Site Leader, VEPICA-TOTAL Austral, Argentina, Mega-Project: Gas Plants Expansion, Leading the engineer and technicians on site for the commissioning of project “MP compression system in Gas Plants: Loma Las Yeguas Plant, Canadon Alpha, Aguada Pichana and Aguada San Roque, Co-leading all the commissioning process starting from organization, preparation, until the start-up of the new facilities: Turbo compressors, drums, scrubbers, seal and fuel gas system, utilities, etc., Use of OPERCOM total specifications for commissioning process, Writing the commissioning procedures to Leak test and inertization of pipes and recipients, Writing the Operational test procedures (OTP), Control, review, follow up and assurance of the completion of commissioning dossiers
  • 01/2001-03/2003, Operations Superintendent, PDVSA, Venezuela, Facility: Crude Oil Terminal Jose, Operational control of inventories, vessel schedule and operational performance, To prepare and manage the yearly plans in a monthly base for the usage of tanks capacity depending on the demand and Marketing forecasts for each product, Operation, supervision of receiving crude process, storage, Optimization of operational times, demurrage calculation, analysis of demurrage claims, time charter control, Crude accountability, loss control of hydrocarbon volumes, Coordination of maintenance programs, supervision of jobs executed in the operational areas, Liaises with Production, Marketing and Maintenance to coordinate any major maintenance works in the Terminal which might impact the crude export plans, Responsible for the compliment of HSE norms and procedures
  • 01/1998-12/2000, Commissioning Superintendent, PDVSA, Venezuela, Mega-Project: Crude Oil Terminal Jose, Leader of commissioning and start-up process of new facilities for the movement of crude oil, such as: Pipelines, Maritime Terminals, Pumping Stations, storage tanks, utilities, Among other activities the main executed are conformation of commissioning, Start-up and operational organization, elaboration and follow up of punch list, elaboration of commissioning / Start up and operational manual and procedures, operational risk analysis (HAZOP), contingency plan manual, control of project execution.
  • 03/1995-12/1997, Operations Supervisor, PDVSA, Venezuela, Facility: Orimulsion Terminal Jose, Inventory control and vessel loading, Terminal scheduling of loading vessel, prepare and manage the one year and monthly plans of different grades of crude to be exported by the Terminal according to projections given by Production and Nominations from marketing department, To prepare and manage the yearly plans in a monthly base for the usage of tanks capacity depending on the demand and Marketing forecasts for each product
  • 03/1993-12/1994, Commissioning Supervisor, PDVSA, Venezuela, Mega-Project: Terminal de Orimulsion Jose, In this project I was in charge of the commissioning of the operational facilities, but additionally the did the commissioning of the following buildings: Control Centre, Lab, Offices and Maintenance warehouse, which included: LV electrical power supply, water supply, plumbing, HVAC, telecommunications, gas pipes, fire detection and protection systems, etc.
  • 01/1991-12/1991, Chief Ayacucho Plant, PDVSA, Venezuela, Facility: Storage and Distribution Plant for refined oils, Responsible for the operation and administration of the plant (Gasolines 2 grades, Diesel Oil and Jet A-1)
  • 01-1988-12/1990, Commissioning and Start-Up Supervisor, SISOR, PDVSA, Responsible for the supervision of the team in charge of commissioning & Start-Up of pipelines and pumping system of Mega-Project: SISOR, which consist of 6 refined products Storage & Distribution Plants (Gasolines 2 grades, Diesel, and Jet A-1) connected and feeded from the PLC refinery by a Pipeline of 600 Km long., and different diameters

Personal Information

Title: Mechanical Engineer

Languages

English
Professional Working
Spanish
Native or Bilingual

Affiliations

  • Lisening music I like to download video music and edit them in one

Certification

Driver License # S0481-65805-50606



Timeline

Contract Administrator

HH Angus & Associates
06.2023 - 11.2023

Cx Specialist

HH ANGUS & Associates
11.2022 - 06.2023

Cx Process Leader

ACTEMIUM/SAMSUNG/INPEX
06.2013 - 01.2019

Cx Unit Leader

MPH/SATORP
05.2012 - 04.2013

Cx Supervisor

BRUNEL/ QATARGAS
08.2010 - 08.2011

Pre-Commissioning Supervisor

ECOPETROL
01.2010 - 03.2010

Pre-Commissioning Supervisor

PPMS/ TECHNIP
04.2009 - 07.2009

Bachellor Equivalency - Mechanical Engineering

WES - World Education Service

Master of Science - Mechanical Engineering

University of Michigan

Bachelor of Science - Mechanical Engineering

Polytecnical Institute LCM
Roberto Santander Borges