Underground Electrician

Robert Patchett

Redpath Mining Canada
Kelligrews,NL
13
years of professional experience

To obtain an Electrical position with your company that will allow me to utilize my skills to help benefit your company.

Work History

Underground Electrician

1 Year 5 Months
Redpath Mining Canada | Chelmsford | 06.2025 - 11.2026
  • Installed electrical raceways using messenger and various sizes of cable tray to support safe and efficient power distribution.
  • Installation of electrical panels, transformers, motors, control devices and mcc switchgear
  • Glanding and termination of LV/MV/HV cables
  • Reading and interpreting electrical drawings
  • Glanding and terminations of cat 6 cables
  • Conducted QED walk downs to verify installation accuracy and adherence to safety protocols, enhancing compliance and safety standards.
  • Troubleshot electrical equipment to identify and resolve issues, ensuring reliable operation and minimizing downtime.
  • Trained in the use of various types of underground equipment.

Electrician

5 Months
Eco Contracting Ltd. | Stephenville, NL | 01.2025 - 06.2025
  • Reading and interpreting electrical drawings
  • Installed and terminated cables for branch circuits, panel feeders, and MCC switchgear to facilitate reliable power distribution.
  • Executed terminations for high voltage cables to ensure secure connections.
  • Installed fire alarm systems, lights, and plugs to enhance safety and functionality of electrical systems.
  • Fabricated supports for electrical raceways, panels, and other devices to ensure stability and compliance with safety standards.
  • Installing electrical raceways: EMT conduit

Underground Electrician

8 Months
Redpath Mining Canada | Voisey's Bay | 04.2024 - 12.2024
  • Installed electrical raceways using messenger cables and various sizes of cable tray, ensuring compliance with safety standards
  • Gland and terminate LV/MV/HV cables, facilitating reliable power distribution
  • Installation and terminations of electrical panels, transformers, motors, control devices and mcc switchgear
  • Glanding and terminations of SMS plugs
  • Glanding and terminations of cat 6 cables
  • Installation of electrical hardware and devices
  • Conducted QED walk downs to verify installation accuracy, enhancing project quality assurance
  • Reading and interpreting electrical drawings
  • Trained in the use of various types of underground equipment. Kes/getman scissor deck, mewp, manitou

Electrician

1 Year 1 Month
Talon Energy Services | Labrador Correctional Facilitie | 02.2023 - 03.2024
  • Installing electrical raceways: EMT, Rigid and FRE conduit
  • Installation and termination cable for branch circuits, panel feeders, MCC switchgear, disconnects and transformers
  • Executed high voltage cable terminations to ensure safe and reliable connections.
  • Removed old panels, switchgear, and disconnects, and installed new units within project timelines to enhance system reliability.
  • Installed fire alarm systems, lighting, and power outlets to ensure compliance with safety regulations and operational standards.
  • Reading and interpreting electrical drawings
  • Fabricated supports for electrical raceways, panels, and other electrical devices to ensure optimal installation.

Maintenance Electrician

4 Years 3 Months
Tata Steel | Schefferville, NL | 07.2019 - 10.2023
  • Install and maintain operations of generator for plant and camp
  • Performed installation and termination of electrical equipment to support reliable system performance
  • Conducted checks on instruments and devices to ensure proper functionality and safety
  • Troubleshooting and maintaining fire alarm system for camp accommodation and plant
  • Assisted other trades with various maintenance tasks to enhance operational efficiency. with preventive maintenance
  • Assisted in motor swaps to minimize downtime and maintain operational efficiency
  • Assisting other trades with preventive maintenance
  • Perform regular camp checks on a daily basis
  • Assisted with plumbing, carpentry, and other tasks to help keep camp running well

Electrician

5 Months
Kiewit At Saddle Hill West Project | 10.2018 - 03.2019
  • Installation of rigid and emt conduit, cable tray, MCC's switchgear control panels
  • Fabricated supports for electrical equipment and raceways to ensure secure installations.
  • Installed ridget and emt conduit, cable tray, MCC switchgear, and control panels to facilitate efficient electrical distribution.
  • Executed grounding procedures for electrical systems to ensure safety and compliance.
  • Troubleshooting electrical equipment for a flawless turnover
  • Gland and terminated LV, MV, and HV cables to ensure reliable electrical connectivity.
  • Troubleshooting electrical equipment for a flawless turnover

Electrician and Foreman

1 Year 5 Months
G.J. Cahill at Muskrat Falls Substation | , NL | 11.2016 - 04.2018
  • Coordinated and supervised crew of 15 for HV, MV, LV cable pulls and terminations
  • Executed glanding and terminations of LV, MV, HV cables for MCC, switchgear, control cabinets, and transformers
  • Analyzed electrical drawings to ensure accurate installation of systems
  • Troubleshooting electrical equipment for problems prior to turnover
  • Arranged and secured ROXTEC firestop blocks in transit to prevent damage
  • Reading and interpreting electrical drawings
  • Managed time card submissions and prepared daily progress reports to track project status
  • QA/QC walkdowns of electrical systems

Electrician/Commissioning

7 Months
Wood Group Cahill at Hebron Project | , NL | 04.2016 - 11.2016
  • Glanding and terminating HV, MV, LV cables
  • Executed high voltage tests to verify system reliability and safety
  • Performing pre-commissioning checks on systems, PT-PT, megger, etc.
  • Tested and installed heat trace systems to ensure optimal temperature maintenance
  • Performed load and no-load tests on motors to confirm operational performance
  • Installed stainless steel cable tray in compliance with safety standards.
  • Packing transits using RISE TRANSITS CSD SEALING SYSTEM

Commissioning

1 Year 5 Months
DFB Driver at Long Harbor Processing Plant | , NL | 03.2014 - 08.2015
  • Conducted pre-commissioning checks using PT-PT and megger to ensure system integrity
  • Executed high voltage operations safely on 13.8 kV systems on 13.8 kv
  • Gland and terminate control and power cables for operational readiness
  • Performing load/no load test on motors
  • Installing Mcc sections and doing bucket swaps

Education

Electrical Trainee

College of the North Atlantic | Seal Cove, NL

- Information Technology

Keyin College | Carbonear, NL

Skills

MCC switchgear
Switchgear installation
Electrical terminations
High voltage testing and commissioning
Electrical raceways
Conduit installation
Electrical drawings

Extras:

  • Common Core: Modules 0000, 0001, 0002, 0012
  • Fall arrest
  • Training on Manitou, KES Scissor deck, JLG, Minecat, Toyota, Boom truck, scissor deck, Getman
  • First aid

Timeline

Underground Electrician

Redpath Mining Canada
06.2025 - 11.2026Read More

Electrician

Eco Contracting Ltd.
01.2025 - 06.2025Read More

Underground Electrician

Redpath Mining Canada
04.2024 - 12.2024Read More

Electrician

Talon Energy Services
02.2023 - 03.2024Read More

Maintenance Electrician

Tata Steel
07.2019 - 10.2023Read More

Electrician

Kiewit At Saddle Hill West Project
10.2018 - 03.2019Read More

Electrician and Foreman

G.J. Cahill at Muskrat Falls Substation
11.2016 - 04.2018Read More

Electrician/Commissioning

Wood Group Cahill at Hebron Project
04.2016 - 11.2016Read More

Commissioning

DFB Driver at Long Harbor Processing Plant
03.2014 - 08.2015Read More

College of the North Atlantic

Electrical Trainee
01.2011Read More

Keyin College

from Information Technology
01.1997Read More