Underground Electrician
1 Year 5 MonthsRedpath Mining Canada | Chelmsford | 06.2025 - 11.2026
- Installed electrical raceways using messenger and various sizes of cable tray to support safe and efficient power distribution.
- Installation of electrical panels, transformers, motors, control devices and mcc switchgear
- Glanding and termination of LV/MV/HV cables
- Reading and interpreting electrical drawings
- Glanding and terminations of cat 6 cables
- Conducted QED walk downs to verify installation accuracy and adherence to safety protocols, enhancing compliance and safety standards.
- Troubleshot electrical equipment to identify and resolve issues, ensuring reliable operation and minimizing downtime.
- Trained in the use of various types of underground equipment.
Electrician
5 MonthsEco Contracting Ltd. | Stephenville, NL | 01.2025 - 06.2025
- Reading and interpreting electrical drawings
- Installed and terminated cables for branch circuits, panel feeders, and MCC switchgear to facilitate reliable power distribution.
- Executed terminations for high voltage cables to ensure secure connections.
- Installed fire alarm systems, lights, and plugs to enhance safety and functionality of electrical systems.
- Fabricated supports for electrical raceways, panels, and other devices to ensure stability and compliance with safety standards.
- Installing electrical raceways: EMT conduit
Underground Electrician
8 MonthsRedpath Mining Canada | Voisey's Bay | 04.2024 - 12.2024
- Installed electrical raceways using messenger cables and various sizes of cable tray, ensuring compliance with safety standards
- Gland and terminate LV/MV/HV cables, facilitating reliable power distribution
- Installation and terminations of electrical panels, transformers, motors, control devices and mcc switchgear
- Glanding and terminations of SMS plugs
- Glanding and terminations of cat 6 cables
- Installation of electrical hardware and devices
- Conducted QED walk downs to verify installation accuracy, enhancing project quality assurance
- Reading and interpreting electrical drawings
- Trained in the use of various types of underground equipment. Kes/getman scissor deck, mewp, manitou
Electrician
1 Year 1 MonthTalon Energy Services | Labrador Correctional Facilitie | 02.2023 - 03.2024
- Installing electrical raceways: EMT, Rigid and FRE conduit
- Installation and termination cable for branch circuits, panel feeders, MCC switchgear, disconnects and transformers
- Executed high voltage cable terminations to ensure safe and reliable connections.
- Removed old panels, switchgear, and disconnects, and installed new units within project timelines to enhance system reliability.
- Installed fire alarm systems, lighting, and power outlets to ensure compliance with safety regulations and operational standards.
- Reading and interpreting electrical drawings
- Fabricated supports for electrical raceways, panels, and other electrical devices to ensure optimal installation.
Maintenance Electrician
4 Years 3 MonthsTata Steel | Schefferville, NL | 07.2019 - 10.2023
- Install and maintain operations of generator for plant and camp
- Performed installation and termination of electrical equipment to support reliable system performance
- Conducted checks on instruments and devices to ensure proper functionality and safety
- Troubleshooting and maintaining fire alarm system for camp accommodation and plant
- Assisted other trades with various maintenance tasks to enhance operational efficiency. with preventive maintenance
- Assisted in motor swaps to minimize downtime and maintain operational efficiency
- Assisting other trades with preventive maintenance
- Perform regular camp checks on a daily basis
- Assisted with plumbing, carpentry, and other tasks to help keep camp running well
Electrician
5 MonthsKiewit At Saddle Hill West Project | 10.2018 - 03.2019
- Installation of rigid and emt conduit, cable tray, MCC's switchgear control panels
- Fabricated supports for electrical equipment and raceways to ensure secure installations.
- Installed ridget and emt conduit, cable tray, MCC switchgear, and control panels to facilitate efficient electrical distribution.
- Executed grounding procedures for electrical systems to ensure safety and compliance.
- Troubleshooting electrical equipment for a flawless turnover
- Gland and terminated LV, MV, and HV cables to ensure reliable electrical connectivity.
- Troubleshooting electrical equipment for a flawless turnover
Electrician and Foreman
1 Year 5 MonthsG.J. Cahill at Muskrat Falls Substation | , NL | 11.2016 - 04.2018
- Coordinated and supervised crew of 15 for HV, MV, LV cable pulls and terminations
- Executed glanding and terminations of LV, MV, HV cables for MCC, switchgear, control cabinets, and transformers
- Analyzed electrical drawings to ensure accurate installation of systems
- Troubleshooting electrical equipment for problems prior to turnover
- Arranged and secured ROXTEC firestop blocks in transit to prevent damage
- Reading and interpreting electrical drawings
- Managed time card submissions and prepared daily progress reports to track project status
- QA/QC walkdowns of electrical systems
Electrician/Commissioning
7 MonthsWood Group Cahill at Hebron Project | , NL | 04.2016 - 11.2016
- Glanding and terminating HV, MV, LV cables
- Executed high voltage tests to verify system reliability and safety
- Performing pre-commissioning checks on systems, PT-PT, megger, etc.
- Tested and installed heat trace systems to ensure optimal temperature maintenance
- Performed load and no-load tests on motors to confirm operational performance
- Installed stainless steel cable tray in compliance with safety standards.
- Packing transits using RISE TRANSITS CSD SEALING SYSTEM
Commissioning
1 Year 5 MonthsDFB Driver at Long Harbor Processing Plant | , NL | 03.2014 - 08.2015
- Conducted pre-commissioning checks using PT-PT and megger to ensure system integrity
- Executed high voltage operations safely on 13.8 kV systems on 13.8 kv
- Gland and terminate control and power cables for operational readiness
- Performing load/no load test on motors
- Installing Mcc sections and doing bucket swaps