Managed project budgets, cost controls, and resource allocation to support efficient execution.
Directed underground service projects from planning through closeout, aligning crews, schedules, and deliverables.
Coordinated subcontractors, suppliers, and site teams to maintain workflow and resolve field issues quickly.
Oversaw health and safety requirements, ensuring compliance with site regulations and risk controls.
Reviewed drawings, specifications, and permits to confirm scope accuracy before work began.
Monitored progress and adjusted schedules to keep multiple projects moving without delays.
Prepared status reports and client updates, maintaining clear communication across stakeholders.
Implemented process improvements that strengthened coordination, productivity, and project consistency.
Successfully managed multiple projects simultaneously by prioritizing tasks according to urgency, resource availability, and alignment with organizational goals.
Planned, designed, and scheduled phases for large projects.
Met project deadlines without sacrificing build quality or workplace safety.
Managed projects from procurement to commission.
Usually worked on our largest site and placed a site office for all the administrative staff, coordinators, assistants, foreman and superintendents.
Managed up to 6 projects at one time and visited every site every week or every two weeks depending on how far away they were
Did estimating for other projects that may fit our schedule using the HCSS Heavy Bid System estimating software
Monitored project performance to identify areas of improvement and make adjustments.
While Project Managing and Estimating in Ontario, We started a small office in Amherst, New York (Buffalo Area)
We had a few public tender jobs with did for NY State DOT doing bridges
We had contacts with some private customers where we were requested to price some work and were then able to negotiate with the the owner to do the work. We did silo and tank linings usually on the inside of the structure, and sometimes on the outside with wet shotcrete, reinforcing steel. Some of the silos were concrete and some were steel tanks that needed to be reinforced.
We did projects in Glen Falls New York, Baltimore Maryland, Washington DC, Portsmouth Virginia, Lewiston NY (bridge), and Buffalo NY (parking garage). After 9/11, insurance and other various costs went up significantly and we decided to focus on Ontario as work was booming.
Directed daily concrete operations, aligning crews, schedules, and site priorities.
Coordinated project timelines with clients, subcontractors, and field teams.
Enforced safety procedures and compliance across active work sites.
Supervised labor assignments, training, and performance expectations for crew members.
Superintendent
9 Years 5 Months
Concreate USL Ltd. | 06.1990 - 11.1999
Moved from our Ontario office in Bolton to our Quebec office in St. Laurent (suburb of Montreal) as I was asked if i wanted to be part of the team heading up this new office.
Supervised concrete demolition and dry shotcreting (gunite) as outlined above as a subcontractor
Responsible for coordinating with general contractor on scheduling and staging of the work
Did publicly tendered work as a general contractor doing bridge rehabilitations from removal of bridge deck asphalt, removal of concrete barrier walls and reconstruction of new ones concrete deck repairs, concrete deck overlay, substructure repairs, access, waterproofing of bridge deck, subcontracting out of asphalt paving and any electrical work for roadway illumination, and any other specialized work requiring a subcontractor.
scheduling of the work with our own site crews and maintaining scheduling with subcontractors.
Communicated daily with foremen, subcontractors, and project teams to align priorities and resolve field issues.
Enforced safe work practices around heavy equipment, utilities, and confined work areas.
Coordinated underground utility and concrete construction activities to maintain safe, organized jobsite operations.
Directed crews through excavation, trenching, backfilling, and site restoration requirements.
Monitored work quality to ensure compliance with project specifications, codes, and safety standards.
Scheduled labor, equipment, and materials to support efficient field execution and minimize delays.
Supervised concrete crews to maintain safe, efficient daily site operations.
Directed equipment use and material staging to support uninterrupted jobsite workflow.
Worked as a subcontractor doing dry shotcrete (gunite) with MTO certified nozzleman (applicators) and certified dry shotcrete crew
Supervised concrete demolition work on overhead (bridge soffit / underside), vertical (walls, piers, abutments) and horizontal (bridge deck surfaces) surfaces as a sub-contractor.
Supervised sandblasting of existing exposed reinforcing steel from the above demolition work before placing of concrete
Was responsible for making sure equipment was maintained and serviced to ensure that the progress of the work was efficient and uninterrupted.
Was responsible for making sure we had proper materials and proper quantities on site to make sure crews would not run out.
Making sure we had the proper mix of skilled workers within the crew for the work that was being executed.