Overview
Work History
Education
Skills
Languages
Additional Information
Timeline
Generic

Nathan Zinn

Wakaw,Saskatchewan

Overview

28
28
years of professional experience

Work History

Heavy Equipment Operator

Venture Construction
05.2020 - 06.2024
  • Operated range of heavy equipment on regular basis with advanced skill.
  • Operated excavators, bulldozers and dump trucks to transport heavy materials, practicing safety measures.
  • Adapted quickly to changing project requirements or unexpected obstacles encountered during the course of work assignments.
  • Demonstrated versatility in skillset by operating multiple types of heavy machinery to accommodate project needs.
  • Trained in diverse pieces of equipment and useful attachments to handle team needs.
  • Adhered to heavy equipment safety and operation protocols, resulting in minimal complaints or incidents.
  • Optimized machine performance with regular cleaning, lubrication, and maintenance checks in accordance with manufacturer guidelines.
  • Increased productivity by operating heavy machinery such as backhoes, bulldozers, and excavators for various construction projects.
  • Performed thorough pre-shift and post-shift inspections and accurately completed equipment logs and reports.
  • Operated machining equipment safely with team of operators.
  • Remove debris and leveled ground to prepare job sites for construction projects.
  • Moved equipment between job locations using truck and trailer.
  • Demonstrated commitment to safety by consistently wearing appropriate personal protective equipment and following all established protocols.
  • Maintained accurate logs of equipment operation hours, maintenance activities, and project progress for streamlined record-keeping purposes.

Drywall Laborer

Craigs Drywall
04.2016 - 02.2020
  • Enhanced job site safety by maintaining clean and organized work areas and properly disposing of debris.
  • Boosted team morale by fostering a positive work environment that encouraged open communication and collaboration among crew members.
  • Optimized workflow processes with effective time management skills to ensure all daily tasks were completed within allotted hours while maintaining attention to detail in every aspect of the job.
  • Maximized client satisfaction by addressing questions, concerns, or requests promptly and professionally throughout the construction process.
  • Increased overall project quality through precise application of joint compound for seamless wall surfaces.
  • Demonstrated versatility on job sites by assisting with tasks outside of drywall installation, such as framing or insulation work, when required.
  • Maintained open lines of communication between team members and supervisors for seamless coordination throughout each phase of the drywall installation process.
  • Ensured proper installation by adhering to building codes and industry standards for drywall construction techniques.

Sandblaster

Walls Sandblasting
08.1996 - 01.2016
  • Assisted in training new employees on proper sandblasting procedures, ensuring adherence to safety regulations and company policies.
  • Maintained abrasive blasting equipment and performed minor repairs.
  • Enhanced surface quality by skillfully operating sandblasting equipment on various materials.
  • Ensured optimal equipment performance with regular maintenance, cleaning, and timely repairs.
  • Maintained a safe and efficient work environment by adhering to safety protocols and proper handling of hazardous materials.
  • Increased customer satisfaction by consistently delivering high-quality results in a timely manner on all assigned projects.
  • Collaborated with team members to complete large-scale projects, streamlining processes for increased productivity.
  • Supported overall company success with a strong commitment to quality workmanship, teamwork, and adaptability in meeting changing demands.
  • Selected surfaces for blasting and masked specific parts.
  • Conducted regular inspections of completed work for quality assurance purposes, identifying areas needing improvement or rework if necessary.
  • Optimized workflow efficiency by setting up job sites with necessary equipment, tools, and protective gear prior to commencing work.
  • Improved overall project efficiency with thorough preparation of surfaces before the sandblasting process began.
  • Set up portable sandblasters and maintained clean and safe work zone.
  • Determined accurate mixtures and times for sandblasting to meet desired finish.
  • Reduced downtime by quickly troubleshooting issues with equipment malfunctions or unexpected challenges during the sandblasting process.
  • Upheld strict quality standards while completing intricate designs or patterns using masking techniques during the sandblasting process.

Education

Marcelin High
Macklin, SK

Skills

  • Heavy Equipment Operation
  • Safe Equipment Operation
  • Loader Operation
  • Construction background
  • Skid Steer Proficiency
  • Daily vehicle inspections
  • Bulldozer Operation
  • Front end loader operations
  • Safety Compliance
  • Earthmoving Operations
  • Preventive Maintenance
  • Off-Road Vehicle Operation
  • Following Directions
  • Moving and Leveling Dirt
  • Good Judgement
  • Construction Equipment Operation
  • Repair and Maintenance
  • Backhoe Operation
  • Backhoe Handling
  • First Aid Training
  • Bulldozer Maneuvering
  • Debris Removal
  • Front End Loader Handling
  • Equipment operation
  • Equipment Logs
  • Excavator Attachment Usage
  • Safety program understanding
  • Safety Procedures
  • Excavation Expertise
  • Grading Techniques
  • Parts Lubrication
  • Wheel Loader Operation
  • Road Construction
  • Teamwork and Collaboration
  • Site Preparation Techniques
  • Loader controls
  • Rock Crushing Techniques
  • Communicating Job Status
  • Site Prep
  • Commercial construction experience
  • Residential construction
  • Roadway Grading
  • Land Clearing Techniques
  • Hydraulic Lifts
  • Asphalt Paving
  • Paving Equipment Operation
  • Scraper Operation Expertise
  • Construction and mining tractors
  • Excavation and Backfilling
  • Dependable and Punctual
  • Adaptable and Flexible
  • Worksite Safety and Maintenance
  • Mechanical Maintenance
  • Grease and Lubricant Application

Languages

English

Additional Information

References

Ken Prince (306)327-8635

Supervisor


Dustin Dunbar (306)291-3318

Supervisor


Timeline

Heavy Equipment Operator

Venture Construction
05.2020 - 06.2024

Drywall Laborer

Craigs Drywall
04.2016 - 02.2020

Sandblaster

Walls Sandblasting
08.1996 - 01.2016

Marcelin High
Nathan Zinn