Summary
Overview
Work History
Skills
Languages
Timeline
Generic

Pedro Diaz Bojorquez

Summary

Hardworking professional with several years of experience completing high-quality concrete projects. Practiced at preparing site, building forms and pouring concrete.

Overview

15
15
years of professional experience

Work History

Concrete Finisher

Roc modular
Calgary, Alberta
06.2021 - 11.2022
  • Finished concrete surfaces to meet project specifications and quality standards.
  • Operated tools like trowels, floats, and screeds for precise finishing work.
  • Collaborated with team members to streamline workflow, ensuring on-time project completion.
  • Inspected finished work for quality and consistency, contributing to successful project handover.
  • Maintained tools and equipment in optimal working condition for daily tasks.
  • Implemented safety practices to minimize hazards during concrete pouring and finishing tasks.
  • Leveled and smoothed freshly placed concrete with a straight edge or float.
  • Finished surfaces by hand-troweling or machine-troweling for a smooth finish.
  • Assisted in setting up formwork prior to pouring concrete.
  • Operated power vibrators to compact concrete into place.
  • Poured concrete into forms using pump hose and leveled.
  • Positioned wire mesh and rebar to reinforce concrete.
  • Dismantled forms using basic and advanced tools.
  • Followed instructions given by supervisors regarding job requirements such as depth and width measurements.
  • Maintained safety of work areas by adhering to strict regulations.
  • Removed debris and waste to clean site after completing work.
  • Constructed forms to create various concrete structures.
  • Measured and cut reinforcing steel bars in order to reinforce the structure.
  • Molded expansion joints and edges using edging tools, jointers, and straightedge.
  • Ensured that proper grades were maintained throughout the project for drainage purposes.
  • Laid and repaired concrete to make level and long-lasting surfaces.
  • Repaired damaged areas of existing concrete structures using appropriate materials.
  • Worked with teammates to move steel forms.
  • Installed expansion joints, sealants, coatings, and other protective treatments according to specifications.
  • Loaded and unloaded necessary tools, materials, and machines from trucks and trailers.
  • Calculated concrete quantities needed for jobs.
  • Sprayed curing compound on newly finished surfaces to ensure proper curing.
  • Compacted grade using jumping jack or plate compactor equipment.
  • Provided assistance in completing projects within deadlines set by supervisor and client.
  • Monitored conditions of the job site to prevent damage or accidents due to wet cement or other hazardous materials.
  • Set up scaffolding, braces, and other temporary structures to support crew during work.
  • Prepared mixtures of sand, gravel, cement and water according to specified proportions.
  • Troubleshot equipment issues and determined best courses of action for repairs.
  • Inspected completed projects for quality assurance purposes.
  • Produced rough concrete surface using brooms.
  • Observed weather conditions, including wind and temperature, during concrete curing to ensure optimal results.

Spray Foam Applicator

Western urethanen
Saskatoon, Saskatchewan
07.2007 - 07.2019
  • Applied spray foam insulation to various surfaces for optimal energy efficiency.
  • Prepared job sites by ensuring cleanliness and safety compliance standards.
  • Operated spray equipment and tools to deliver precise application of materials.
  • Coordinated with team members to achieve project deadlines and uphold quality standards.
  • Led training for new employees on safe handling of materials and equipment usage.
  • Inspected finished work for adherence to specifications and customer requirements.
  • Assisted in inventory management to ensure availability of supplies and materials.
  • Inspected equipment to ensure proper functioning prior to use.
  • Applied foam insulation with spray gun or other applicator according to customer specifications.
  • Ensured that all safety protocols were followed during application process.
  • Prepared surfaces for spray foam application by sanding, cleaning and priming surfaces.
  • Read and interpreted technical plans and blueprints for each job site.
  • Attended training sessions regularly in order to stay current on best practices and industry standards.
  • Reported any issues encountered during application process immediately to supervisor and manager.
  • Sorted and arranged supplies and equipment systematically before leaving job sites each day.
  • Followed manufacturer instructions closely when mixing chemicals for spray foam applications.
  • Measured areas accurately prior to beginning installation process in order to determine amount of product required.
  • Adhered strictly to company policies regarding safety procedures when operating machinery or using hazardous materials.
  • Maintained a safe working environment at all times while applying foam insulation.
  • Provided assistance to other team members when needed throughout the duration of each job site visit.
  • Performed routine maintenance on tools, equipment, and vehicles used on the job site.
  • Monitored temperature of the heated material as it was being applied to ensure accuracy.
  • Repaired, removed or applied insulation on industrial and mechanical equipment including heat exchangers, tanks and pumps.
  • Installed loose or foam insulation in tight spaces to meet building code requirements.
  • Protected insulated pipes from damage or decay by installing and securing sheet metal.
  • Maintained equipment, making repairs and modifications to extend life of such tools.
  • Utilized fabricating equipment to cut, bend and straighten sheet metal for insulation projects.
  • Determined appropriate amounts and types of insulation needed and installation methods required to satisfy project demands.
  • Demonstrated thorough understanding of and skill for insulation preparation and installations.
  • Applied adhesives and other compounds to ready surfaces for insulation.
  • Identified specific heat retaining or excluding properties required and selected corresponding insulation materials.
  • Removed and sealed off old asbestos insulation following strict remediation protocols.
  • Trained team members in proper installation methods to meet project quality and efficiency standards.

Skills

  • Concrete finishing
  • Concrete pouring
  • Concrete repair
  • Concrete curing
  • Concrete polishing
  • Broom finishing
  • Float finishing
  • Finishing techniques
  • Formwork construction
  • Form setting
  • Screed usage
  • Jointers and edgers
  • Trowel machinery
  • Stamped concrete
  • Surface curing methods
  • Rebar installation
  • Truck chute operation
  • Quality inspection
  • Safety compliance
  • Worksite safety
  • Team collaboration
  • Time management
  • Attention to detail
  • Problem solving
  • Effective communication
  • Commercial construction experience
  • Site preparation
  • Driveway installation
  • Sidewalk construction
  • Hand tool operation
  • Hand tools operation
  • Tool operation
  • Power tool operation
  • Power saws
  • Power trowel operation
  • Slab construction
  • Retaining walls
  • Power trowel operation
  • Slab construction
  • Retaining walls

Languages

Spanish
First Language
English
Beginner (A1)
A1

Timeline

Concrete Finisher

Roc modular
06.2021 - 11.2022

Spray Foam Applicator

Western urethanen
07.2007 - 07.2019
Pedro Diaz Bojorquez