Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

PAUL WILSON

Kamloops,BC

Summary

Attentive General Foreman with expertise in coordinating supplies, understanding project requirements and training new team members. Hardworking and reliable problem-solver with good organizational and communication abilities. Productive individual well-versed in all areas of construction start to finish. Enthusiastic individual experienced in resolving conflicts and issues with exceptional skill and poise. Offering engaging and pleasant personality with expertise ensuring projects meet safety regulations, policies and procedures.

Overview

16
16
years of professional experience

Work History

General Foreman

ARPA INVESTMENTS
05.2019 - 10.2023
  • Worked alongside team to accomplish work goals according to schedule.
  • Kept teams properly supplied with materials, tools, plans and supplementary assistance to meet project deadlines.
  • Completed final walk throughs at job sites to close out projects.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Directed projects according to schedule and quality demands.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Reviewed blueprints, specifications and drawings to fully understand project scope ahead of time.
  • Delivered project updates to superintendent and detailed issues that could halt work progress.
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Installed all finishes doors, trim, flooring, door handles window covering, tack tile and life safety component's including fire alarm system.
  • Mixed and poured concrete in various projects.
  • Worked closely with plumbers, electricians, mechanical and sub trades on what they needed next to complete their tasks.

Finisher/Laborer

COMPLETE HOME RENOVATIONS
10.2013 - 09.2018
  • Reviewed final aspects of finishing for compliance with established standards related to color, textures, metals, exotic woods and aged finishes.
  • Repaired damaged items using different chemicals and tools.
  • Maintained organized work area by cleaning and removing hazards.
  • Collaborated with other departments to optimize production workflows.
  • Completely remodeled bathrooms and kitchens moving wall adding space and finished complete with tile and paint.
  • Removed and reinstalled all types of flooring including laminate, vinyl, tile, carpet and hardwood.
  • re and re windows and doors including exterior envelope and finish to existing siding.
  • moved and shuffled electrical, h-vac and plumbing to work with new design.
  • all aspects of residential renovations interior and exterior.

Siding Installer

Nu-Vue Exteriors
01.2008 - 10.2013
  • Used variety of hand and power tools to complete tasks.
  • Loaded and unloaded materials and equipment onto and off construction sites.
  • Followed instructions and safety protocols to prevent accidents and injuries.
  • Moved and cleared debris from work sites to dispose of in designated areas.
  • Erecting scaffolding and ladders safely with appropriate PPE.
  • Tear down and removal of old existing siding including vinyl, cedar. aluminum, Hardie plank and stucco.
  • Cut and install smart trim to all areas windows, doors, fascia fill and paint to chosen color.
  • Envelop, flash and paper all penetrations to code and make sure it is sealed.
  • Assisted in landscape and with other trades as needed.

Education

High School Diploma -

Westsyde Secondary School
Kamloops, BC
06.2003

Certificates -

Nutech Safety Ltd And Leavitt Training
2023

Skills

  • Safely operate all power tools for all scopes of work
  • Safely work all hand tools including knifes, hammers, drills
  • Patch, fix, clean, refurbish, redo all construction materials from concrete foundation up to roof system Able to follow current building codes including BC housing codes
  • Project planning and execution
  • Communication and being able to relate first hand
  • Machine Operator (bobcat, forklift, zoom boom, mini ex, JLG up to 80ft, MRT)
  • Being able to find the right answer quickly and deliver it in real time
  • Perform first aid and do follow up paper work and documentation
  • Great understanding of life safety and accessibility requirements, codes and placement
  • Construction Processes start to finish with safety as first concern along the way
  • Good attitude, generally easy going and pleasant everyday I work well with others and don't have much to prove, my glass is half full

Languages

English
Professional Working

Timeline

General Foreman

ARPA INVESTMENTS
05.2019 - 10.2023

Finisher/Laborer

COMPLETE HOME RENOVATIONS
10.2013 - 09.2018

Siding Installer

Nu-Vue Exteriors
01.2008 - 10.2013

High School Diploma -

Westsyde Secondary School

Certificates -

Nutech Safety Ltd And Leavitt Training
PAUL WILSON