Summary
Overview
Work History
Skills
Accomplishments
Timeline
Generic

Paul Jager

Paramount

Summary

Developed extensive skills in fast-paced fabrication environment, specializing in precision metal work and complex assembly tasks. Strong background in interpreting technical drawings and executing intricate welding techniques. Seeking to transition into new field where these skills can be effectively utilized and further developed.

Overview

2005
2005
years of professional experience

Work History

Chassis Fabrication

Various Companies
2001 - 2025
  • Reduced material waste by implementing precise measurements and cutting techniques during the fabrication process.
  • Facilitated smooth communication between cross-functional teams involved in the design, fabrication, installation, operation, maintenance of manifolds systems.
  • Enhanced team productivity by providing support in various tasks such as ductwork fabrication, wiring, and piping insulation.
  • Minimized material waste through precise measurements and skilled cutting techniques during the fabrication process.

T/F FC Liason

NHRA
01.1990 - 12.2004
  • Supported communication between departments to enhance project coordination
  • Assisted in gathering data for stakeholder reports and presentations
  • Learned operational processes to facilitate efficient information flow
  • Coordinated meetings and agendas to streamline discussions and decision-making

Fabricate Assembly

Shelby Industries
01.2000 - 12.2000
  • Self-motivated, with a strong sense of personal responsibility.
  • Worked effectively in fast-paced environments.
  • Skilled at working independently and collaboratively in a team environment.
  • Proven ability to learn quickly and adapt to new situations.

Fabrication Welder

Hansen Racecars
11.1989 - 12.1999
  • Operated MIG and TIG welding equipment to fabricate high-performance components.
  • Interpreted technical drawings and blueprints to ensure precision in fabrication.
  • Assembled racecar chassis utilizing advanced welding techniques and tools.
  • Collaborated with engineering team to optimize design for manufacturability.

Tech Worker

IHRA
1998 - 1999
  • Operated and maintained advanced diagnostic tools to troubleshoot technical issues.
  • Collaborated with cross-functional teams to enhance service delivery and operational efficiency.
  • Trained junior technicians on equipment handling and safety protocols, fostering knowledge transfer.
  • Streamlined workflow processes to reduce downtime and improve response times for service requests.

Skills

  • Chassis fabrication

Accomplishments

    Worked for NHRA/IHRA as a chassis certifier.

    Nhra chassis committee for 14 years.

    Cover of 1997 Nhra rulebook.

    Worked with Ford/JFR to build new Mustang FC body.

    Built only supplier for PST legal templates plus supplied both NHRA/IHRA with body chambers and general templates for body use in most classes.

    Worked with GM in wind tunnel with both PS and FC bodies.

Timeline

Fabricate Assembly

Shelby Industries
01.2000 - 12.2000

T/F FC Liason

NHRA
01.1990 - 12.2004

Fabrication Welder

Hansen Racecars
11.1989 - 12.1999

Chassis Fabrication

Various Companies
2001 - 2025

Tech Worker

IHRA
1998 - 1999
Paul Jager