Formwork Carpenter with 12+ years of experience, including a background in steel fixing, layout, precast. Expertise in working with leading systems such as Peri, Doka, and Ulma, Aluma as well as traditional wood formwork. Demonstrates a strong commitment to safety regulations and possesses all basic safety certifications. Fluent in multiple languages including Dutch, Russian, Polish, French, and Ukrainian. Skilled in crew management, problem-solving, and technical troubleshooting, making a reliable and versatile addition to any construction team.
Overview
13
13
years of professional experience
Work History
Scaffold Builder, Formwork Carpenter
Ironstone
Toronto, ON
11.2022 - 10.2023
Unloaded equipment and materials and moved supplies around on job sites in various weather conditions.
Safely and accurately built scaffolding in confined spaces like cooling towers.
Cleaned and organized work areas to prevent accidents and dangerous situations.
Constructed scaffolds in appropriate positions and secured completed structures in place.
Safely constructed hung, tube and clip and modular scaffolding systems.
Repaired and replaced faulty or damaged scaffold materials.
Analyzed base surfaces to identify potential obstructions or safety hazards.
Read and utilized blueprints for correct scaffolding construction.
Broke down structures following project completion.
Checked material inventories and ordered new items as needed to prevent shortages.
Operated machinery in busy environments and maintained safety around equipment, people and other projects.
Inspected structures to locate potential weak points or safety hazards.
Cut down boards and plywood panels to meet appropriate size requirements.
Designed new employee training program to share best methods for assembling and disassembling scaffolding.
Formwork Foreman
OYABS
Rotterdam, ON
11.2016 - 12.2022
Developed and implemented safety protocols for the team.
Maintained daily logs of labor and equipment used on-site.
Ensured all workers adhered to company policies and procedures.
Conducted regular performance reviews with crew members.
Provided guidance, direction, and technical assistance to crew members.
Monitored job progress and ensured completion within budget constraints.
Resolved conflicts between workers in a timely manner.
Coordinated with other departments to ensure project deadlines were met.
Identified areas of improvement for increased efficiency and productivity.
Created detailed reports on job progress and submitted them to management on time.
Inspected tools, materials, and equipment to ensure quality standards were met.
Scheduled staff shifts based on project needs and availability.
Trained new employees in safety regulations, operational procedures, and company policies.
Assessed work area conditions for potential hazards or risks.
Prepared budgets for projects based on labor costs, materials needed.
Managed inventory levels of supplies necessary for job completion.
Negotiated contracts with vendors for materials needed at construction sites.
Communicated regularly with subcontractors regarding project timelines.
Supervised activities of personnel assigned to various tasks during construction jobs.
Organized meetings with clients to discuss project specifications.
Organized meetings with clients to discuss project specifications and expectations.
Managed sites by focusing on safety, operations and productivity.
Supervised projects to uphold schedule requirements and quality demands.
Established expectations and motivated crews to consistently meet or beat goals.
Communicated with employees to demonstrate high standards and mitigate issues.
Planned and managed manpower and resource requirements to support project activities.
Monitored job site parts and equipment.
Managed workers at various experience levels in construction and restoration projects.
Checked project details to verify job site materials and equipment.
Viewed and checked job equipment to determine maintenance requirements.
Conferred with senior management, owners, contractors and design professionals to discuss project goals and problem solve.
Tracked and reported units and labor hours prior to submission of timecards.
Complied with federal and company regulations to maintain high level of job site safety.
Increased productivity by improving employee morale and cross-functional communications.
Monitored processes for continuous improvement and implemented changes to promote quicker task completion.
Supported project quality assurance and quality control planning for assigned tasks.
Communicated with suppliers and coordinated delivery of supplies to job sites.
Planned material and equipment needs to drive on-time delivery in concert with project schedule.
Inspected rigging and scaffolding for safety and reliability.
Monitored inventory to support budget and project goals.
Assigned rotating work schedules to maximize coverage and maintain productivity.
Rolled out new processes to achieve operational excellence.
Recorded inspection and work order results in software system with attention to conditions found and remediation taken.
Implemented budgets to support equipment and workforce requirements and successfully complete projects.
Formwork Carpenter
Bogdan Kaczan monolit construction
Gdansk, PL
11.2015 - 11.2016
Positioned wire mesh and rebar to reinforce concrete.
Poured concrete into forms using pump hose and leveled.
Constructed forms to create various concrete structures.
Removed debris and waste to clean site after completing work.
Finished surfaces by troweling, floating and brushing following project requirements and specifications.
Loaded and unloaded necessary tools, materials and machines from trucks and trailers.
Inspected and maintained tools and equipment.
Prepared and cleaned surfaces for finishing to reduce holes and cracks.
Calculated concrete quantities needed for jobs.
Worked with teammates to move steel forms.
Dismantled forms using basic and advanced tools.
Set up scaffolding, braces and other temporary structures to support crew during work.
Compacted grade using jumping jack or plate compactor equipment.
Set up and reinforced forms to accurately pour concrete for walkways and other structures.
Prepared concrete by hand mixing sand and cement.
Reviewed blueprints and other drawings to identify correct grades.
Planned work based on verbal instructions, blueprints and written specifications.
Operated excavators and loaders to prepare site.
Placed steel pins using sledgehammer.
Mixed cement and mortar in preparation for pouring.
Concrete Form Carpenter
Grażyna Kocielowicz
Wroclaw, BC
11.2014 - 11.2016
Removed debris and waste to clean site after completing work.
Finished surfaces by troweling, floating and brushing following project requirements and specifications.
Loaded and unloaded necessary tools, materials and machines from trucks and trailers.
Poured concrete into forms using pump hose and leveled.
Inspected and maintained tools and equipment.
Positioned wire mesh and rebar to reinforce concrete.
Constructed forms to create various concrete structures.
Placed steel pins using sledgehammer.
Calculated concrete quantities needed for jobs.
Planned work based on verbal instructions, blueprints and written specifications.
Prepared and cleaned surfaces for finishing to reduce holes and cracks.
Mixed cement and mortar in preparation for pouring
Set up and reinforced forms to accurately pour concrete for walkways and other structures.
Compacted grade using jumping jack or plate compactor equipment.
Worked with teammates to move steel forms.
Reviewed blueprints and other drawings to identify correct grades.
Set up scaffolding, braces and other temporary structures to support crew during work.
Dismantled forms using basic and advanced tools.
Steel Fixer
Grazyna Kocielowicz
, ON
12.2010 - 12.2014
Connected prefabricated units to form large sections and prepared for concrete pours.
Used signal hoisting equipment and cranes to hoist steel beams, girders and columns into place.
Used various measuring devices and pneumatic tools to assemble and repair production molds.
Positioned and cut steel bars to bolt bars down for reinforcement.
Lined up pieces by using spacers and supports.
Used bolt cutters and power saws to cut rebar into correct lengths.
Worked on assembly line to stock final products in appropriate shipping docks.
Reviewed work schematics and interpreted plans to determine correct steps for each project.
Prepared wire mesh rebar arrangements by welding, wiring or clipping pieces together.
Read specifications and blueprints to determine locations, quantities and sizes of material required.
Drove drift pins through rivet holes to align rivet holes in structural-steel members.
Received structural steel and moved it to modular locations.
Encouraged workers to take precautions to prevent mishaps and injuries on job sites.
Collaborated with construction foreman to establish and confirm task sequences and reinforcing requirements.
Worked closely with structural ironworkers, ornamental Ironworkers, riggers and machinery movers, enabling clear and safe cross-functional operations.
Studied and understood blueprints and specifications before beginning work on projects.
Led and mentored less-experienced ironworkers and assisted foremen in assigning work activities.
Signaled crane operators in safe and accurate lifting and placing of reinforcing iron members and moved rebars manually into specific positions.
Assessed blueprints and specifications to determine aspects of project before work started.
Education
High School Diploma -
Lycee Taras Schevchenko
Kiyiv
05.2006
Skills
Form Systems Knowledge Peri Trio, Peri Maxima, Ulma, Doka Aluma
Concrete Form Construction: slabs, walls,colons,elevators
Montage of precast concrete elements (walls, colons, floors)
Scaffolding Setup
Steel Component Alignments
Rebar Ties
Erection Drawing Assessments
Project Estimations
Materials Selection
Defect Correction
Forklift Operation
Forming and Pouring
Concrete Casting
Surface Roughing
Surface Leveling and Smoothing
Concrete Finishing Brushes
Initiate control of the work site from Legal Survey and maintain survey points for optimal accuracy
Layout Planning
Calculate coordinates meticulously from drawings and specifications
Proficiently lay out all vertical elements and horizontal slab edges
Stake heights with precision on vertical elements such as columns, walls, and cores
Establish clear grid lines for trades and formwork assembly
Scrutinize structural and architectural drawings, promptly addressing any discrepancies and providing effective solutions
Verify and scrutinize shop drawings for elevators and steel structures
Execute the installation of anchors, beams, and embed plates for structural steel as per detailed drawings, covering elevators, windows, and roof slabs
Set up CAD drawings for layout purposes, ensuring accuracy and efficiency
Utilize laser-level equipment for horizontal formwork precision
Montage of precast concrete elements (walls, colons, floors)
Strong Analytical and Communication Skills
Hazardous Materials Removal
Safety Compliance
Job Site Organization
Crew Management
Problem Solving
Work Crew Coordination
Time Management
Technical Troubleshooting
Interpreting Blueprints
Decision Making and Prioritization
Project Estimations
Materials Selection
Site Maintenance
Power Tool Maintenance and Care
Problem-Solving
Fluent in Polish, Russian, Ukrainian, Dutch, French
Drone Contracting at Ironstone Property Group and Field Survey for CSH Bore LoggingDrone Contracting at Ironstone Property Group and Field Survey for CSH Bore Logging