Experienced crane superintendent,supervisor,and operator with over 34 years of experience in the crane and rigging industry. Excellent reputation for resolving problems and improving customer satisfaction.
Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Inspect and operate Tower cranes on the construction of the Concrete Gravity Structure for Husky Energy.Ensure crane is inspected,documented and operated with the highest regard to safety while meeting all performance goals.
Operate Crawler cranes,RT Cranes for all required lifting and configuration changes
Operated a 560 Potain tower crane on the Site C project.Overlapping crane layout.Operated crane as required to safely and efficiently move materials for project requirements.
Daily coordination of crane and rigging for construction requirements.
Ensure Crane and rigging operations were carried out with highest level of safety while maintaining efficiency and budgets.
Conduct safety safety and toolbox meetings on a daily basis
Ensure crane and rigging requirements are done as per site procedures and policy’s.
Perform and document competency checks on all new department employees.
Ensure cranes are inspected,maintained and operated as per CSA codes Z-248 and Z 150
Plan and coordinate Heavy lifts operations on site.
Plans and coordinate the assembly,climbing,configuration changes of Tower and mobile cranes on site.
Coordinate the inspection of all rigging on site and maintain rig loft.
Assemble and coordinate daily elevator (Fraco)operations on site
Coordinate all daily crane and rigging operations for the construction of the Hebron Gravity Base structure
Ensure crane and rigging operations are carried out with the highest level of safety.
Meet or exceed all project production and budget expectations .
Coordinate lifts at Deepwater site using marine heavy lift vessel Taklift.
Plan and coordinate crane climbing and configuration changes.
Ensure all required maintenance and inspections are completed on time and documentation is made readily available
Complete all crane and rigging competency
Checks on all new departmental employees
Ensure all tower crane procedures are carried out as per site and CSA requirements.
Coordinate daily crane and rigging operations for Heavy lift contract at Long Harbour processing plant construction.
Liaison with lead lift superintendent in the heavy lift transport and heavy lift crane contract
Conduct JSA reviews and toolbox talks for crane and rigging operations
Plan ground preps for crane lifts and transport operations
Oversee crane configuration changes assembly and dismantling.
Ensure crane and rigging operations were carried out with the highest level of safety
Work with engineering in planning and execution of multiple crane lifts and heavy lifts.
Plan and assemble tower cranes on site with Morrow crane
Coordinate daily Tower crane,mobile crane operations on the construction of Froth treatment plant for Shell at Albian sands
Ensure crane and rigging operations were carried out with highest level of safety while meeting project production,budget requirements on site.
Complete competency checks on all new departmental employees.
Mentor crane apprentices and apprentice ironworkers.
Conduct safety meetings and create JSAsfor construction requirements.
Perform daily crane operations on Sea rose FPSO on Grand Banks Nl
Offloading and backloading of supplies and materials from supply vessels
Perform all preventative maintenance on LIEBHERR pedestal cranes.
Troubleshoot and complete repairs on cranes with maintenance department as required.
Helicopter Land Officer on board for helicopter personnel and fuelling operations.
Work with marine department deck crews for rig loft management
Complete tool box talks and JSA as required
Ensure crane operations were carried out with highest regard to safety and in keeping with all CNLOPB and company procedures and policies.
Conducted daily toolbox,JSA meetings with crane crews.
Supervised daily crane ,heavy equipment and elevator operations for topsides install many of Husky Energy’s Sea Rose FPSO
Supervised all heavy lift,multiple crane lifting operations on site.
Ensured all lifting,heavy equipment operations were carried out with the highest level of safety while keeping or exceeding productivity goals within budget requirements.
Interprovincial Mobile crane ticket (1998)
Provincial Tower crane Ticket (1996)
Sparrows 3 offshore crane ticket (2005)
Advanced rigging certified
All safety courses required
Liebherr maintenance training Nenzing Austria 2005
10 years plus Crane and rigging superintendent experience
34 years experience in crane and rigging industry
References and certificates can be supplied upon request.