Dynamic and detail-oriented Forklift Operator with a proven track record at A-Train Staffing WCD Trader Joe’s. Expert in inventory control and safety compliance, enhancing warehouse efficiency and reducing incidents. A reliable team player, skilled in heavy equipment operation and problem-solving, committed to maintaining high-quality standards in fast-paced environments.
Overview
7
7
years of professional experience
Work History
Forklift Operator
A-Train Staffing WCD Trader Joe’s
01.2015 - 03.2020
Operated forklifts to transport materials throughout warehouse efficiently.
Conducted routine safety checks on equipment to ensure compliance with regulations.
Loaded and unloaded goods from trucks, maintaining organization and inventory accuracy.
Assisted in training new staff on safe forklift operation and warehouse procedures.
Monitored stock levels, reporting discrepancies to management for timely resolution.
Maintained cleanliness of work area, ensuring compliance with health and safety standards.
Safely loaded and unloaded trucks using appropriate forklift attachments, reducing the risk of accidents or injuries.
Kept warehouse clean and organized by removing debris and returning unused pallets to designated areas.
Improved warehouse efficiency by skillfully operating forklifts to move, locate, and stack materials.
Wrapped pallets in plastic wrap and attached merchandise tags to prepare for shipping.
Implemented safety protocols to reduce incidents and improve workplace environment.
Industrial Painter
Industry Coatings
01.2013 - 01.2015
Operated spray guns and paint systems for industrial applications.
Prepared surfaces by sanding, cleaning, and masking prior to painting.
Ensured compliance with safety regulations during painting processes.
Applied protective coatings to various materials using diverse techniques.
Assisted in training new hires on painting procedures and safety protocols.
Maintained inventory of painting supplies and equipment for seamless operations.
Prepared surfaces for painting by cleaning, sanding, and masking to achieve optimal results.
Demonstrated attention to detail in every aspect of the painting process, resulting in consistent high-quality workmanship.
Painted surfaces using brushes, spray guns, and paint rollers.
Worked holidays and weekends depending on shifting needs of project.
Maintained painting equipment in excellent condition, ensuring optimal performance and minimal downtime.
Operated power sprayers and hand tools to prepare and paint large areas.
Ensured a safe working environment through proper use of protective equipment and adherence to safety protocols.
Reduced material wastage by optimizing paint usage through accurate measurements and application techniques.
Primed, painted, varnished and lacquered walls and surfaces.
Conducted thorough assessments of project specifications before beginning work to ensure all requirements were understood and achievable within given timelines.
Provided supervisor with daily status report on all job tasks and workers' duties.
Performed regular inspections of completed work to ensure quality standards were met or exceeded consistently throughout the project duration.
Streamlined workflow processes by organizing tools, materials, and workspace efficiently.
Inspected completed work for adherence to very strict guidelines and highest quality standards.
Enhanced productivity by developing and implementing efficient painting techniques for industrial projects.
Increased customer satisfaction by delivering high-quality finishes within budget and on time.
Prepared surfaces and surrounding areas for painting using sandpaper, tape, and other materials.
Contributed to team success by offering valuable input during planning sessions for new projects or improvements to existing processes.
Executed work orders for painting team as part of larger project schedule.
Climbed scaffolding, staging, ladders, and planks to reach work area surfaces and observed safety protocols to prevent falls.
Protected surfaces from damage and spills by using drop cloths prior to and during painting.
Painted indoor areas such as hallways, bathrooms, and lobbies.
Prepared trim, walls and ceilings for painting by cleaning, smoothing, and priming.
Applied putty, wood filler, spackling, and caulks to prep uneven surfaces and fill in holes.
Removed surface imperfections, applied special undercoats, and sealed seams to ready surfaces for paint application.