ENGINEERING COMPUTER GRAPHICS
Term Project
- Collaborated with a team of six to design a residential structure, utilizing advanced topographical and architectural modeling techniques across three iterative design phases.
- Reduced excavation costs by 25% (over $7,000 in savings) by optimizing foundation designs to minimize interaction with dense rock formations while maintaining structural integrity.
- Delivered a fully integrated BIM model, ensuring seamless alignment between Civil 3D's topographical data and Revit's structural designs, enabling precise cost analysis and construction readiness.
CEES(Civil and Environmental Engineering Students' Society)
Popsicle Stick Bridge Competition October2024
- Applied engineering principles, including structural analysis, load distribution, and optimization for strength-to-weight ratio.
- Collaborated in a team environment to conceptualize, plan, and execute the bridge design, leveraging effective communication and teamwork.