Summary
Overview
Work History
Education
Skills
Languages
Certification
Accomplishments
Driving License
Status In Canada
Personal Information
References Documents
Timeline
Generic
Muhammad Aamar Waheed

Muhammad Aamar Waheed

Mississauga,ON

Summary

Determined ,professional and passionate Electrical Technologist with 16 years of experience in Power,Energy Transmission and Rail Transit industries.My field of expertise focuses on industrial power system management , Execution ,Testing & good Operational & Maintenance practices ,I am Currently seeking to continue contributing my diverse experience,skills and abilities in power industrial projects with an esteemed employer where I can utilize my perceptional technical skills and academic knowledge for project planning and execution to ensure successfully completion.

Overview

17
17
years of professional experience
1
1
Certification

Work History

SITE ENGINEER (ELECTRICAL)

FCC CONSTRUCTION (FCCEM)
AL-Riyadh, KSA
07.2016 - 12.2023

Riyadh Metro Project - Line -5 (5B3-5B2-5B1 UG Stations & 5KM Tunnel) RIYADH,KSA.

  • Planning and scheduling of construction works, supervise, execute, material inspection and workmanship.
  • Coordination of MEP services with Architecture, Civil/Structure Team.
  • Preparation of BOQ/MTO following Blueprints/SDRs.
  • MV& LV/LC cable Containment & Distribution Installations.
  • Earthing & Lightening Protection Installations & Commissioning.
  • Lighting and small power distribution Installation & Commissioning.
  • Fire Alarm System Interface with ICT & BMS Installations.
  • Public Address Installations.
  • GEN-SET, MDB, SMDB, MCC, PFC, LCP, LDP & PDP,NAE,DCP Installations.
  • TPS Transformers Installations.
  • UPS/CBS System Installation.
  • Capable to conduct Electrical relate Tests.
  • LOTO Implementation Procedure to ensure Safety Factor.
  • Maintain Quality Records.
  • Inspection Requests to QAQC team for successfully executed Installations.

PROJECT ENGINEER (L&T NATIONAL GRID)

SAUDI ELECTRIC COMPANY (SEC)
Eastern Region, KSA
08.2014 - 07.2016

115KV Sub-Station Half Moon Beach ,Dammam 132 KV GIS Sub-Station MODEN Industrial Estate (Dhahran) & Several UG 115KV Transmission Lines Execution.

  • Review engineering design for various SEC Projects of OH/UG Transmission Lines.
  • LV Schematic reviews with technical aspects for Distribution LV AC & DC System.
  • Project Coordination & Management using available resources.
  • Direct supervision for installation of Air Bus-Bar , Air Circuit Breakers ,Bus Support Insulators,Capacitor Bank,Circuit Switches,Lightning arresters ,CT ,PT & RMU Grounding .
  • Direct supervision of Power Transformer Installation & support to Commissioning team. (3X40MVA)
  • Installations of MV/LV Switchgears ,GCB,IBB & NGR (13.8KV).
  • Testing of LV/MV/HV Cables with partial discharge up to 115KV.
  • Involved in switchgears testing using different testing equipments of OMICRON (CMC356/CPC100).
  • 115KV/220KV system Augmentation for OH transmission Lines alongwith Substation up-gradation.

LINE SUPERINTENDENT GRADE-1

NATIONAL TRANSMISSION AND DISPATCH COMPANY (WAPDA,PAKISTAN)
LAHORE, PUNJAB
09.2006 - 07.2014

Multiple Projects of 132/220 KV T/Lines & Substations

  • Construction/Installation of new HT Lines... (11kv /132kv,220kv)
  • Preparation of proposals for augmentation/Rehabilitation of existing system..( 11kv /132kv,220kv)
  • Maintenance of the system including HT lines, transformers, circuit breakers, capacitors etc.
  • Preparation of estimates for new installations..( 11kv /132kv,220kv)
  • Good command in troubleshooting of faults occurred in the system.
  • Controlling & Supervise the system by using (SCADA) System.
  • Installation of Distribution & Power Transformers.
  • Installation of Single phase & three phase Energy meter.
  • Installation of CT,PT,KVARH,Power factor meters.
  • Experience of managing a system of more then 250 KMS of OHTL.

Education

B.TECH PASS - Electrical Power

Preston University
Lahore
09-2006

Skills

  • AUTO CAD
  • Microsoft Office
  • As Build Documentation
  • Single Line Diagrams
  • CEC & NEC
  • Team Leader & Player
  • Project Scheduling
  • Project management
  • Communicational Skills
  • Team Building & Training

Languages

English
Full Professional
Urdu
Native/ Bilingual
Arabic
Professional

Certification

  • LOTO
  • Sub-Staff Basic & Advance Course (SSBC-17 & SSAC 13) Participate in WAPDA Regional Training Center.Lahore
  • Fire Protection & Safety officer Course (FPSO-72) attended at national Instituite of Fire Technology Islamabad in 2007

Accomplishments

  • Multiple Safe Manhours Awards as Team Leader
  • Multiple Appreciation Certificates

Driving License

''G'' class Ontario Licence

Status In Canada

Inside Canada on TRV (Temporary Resident/Visitor Visa, Looking LMIA Based Job Offer that Leeds to PR)

Personal Information

  • Date of Birth: 01/04/85
  • Nationality: Pakistan
  • Marital Status: Married

References Documents

Any Required Reference or Document will be Delivered Upon Request.

Timeline

SITE ENGINEER (ELECTRICAL)

FCC CONSTRUCTION (FCCEM)
07.2016 - 12.2023

PROJECT ENGINEER (L&T NATIONAL GRID)

SAUDI ELECTRIC COMPANY (SEC)
08.2014 - 07.2016

LINE SUPERINTENDENT GRADE-1

NATIONAL TRANSMISSION AND DISPATCH COMPANY (WAPDA,PAKISTAN)
09.2006 - 07.2014

B.TECH PASS - Electrical Power

Preston University
  • LOTO
  • Sub-Staff Basic & Advance Course (SSBC-17 & SSAC 13) Participate in WAPDA Regional Training Center.Lahore
  • Fire Protection & Safety officer Course (FPSO-72) attended at national Instituite of Fire Technology Islamabad in 2007
Muhammad Aamar Waheed