Proactive demolition specialist recognized for strong attention to detail and time management skills. Experience in site assessments and safety compliance contributes to successful project completions under budget and ahead of schedule.
Overview
2
2
years of professional experience
Work History
Demolition Specialist
QM Environmental
Edmonton, Alberta
02.2025 - 11.2025
Conducted site assessments for safety and compliance before demolition activities.
Operated heavy machinery to safely dismantle structures and remove debris.
Collaborated with team members to ensure efficient workflow during projects.
Assisted with diverse construction challenges to help team and customer.
Measured, marked or recorded openings or distances to construction layout areas.
Controlled traffic passing near, in or around work zones.
Installed sewer, water or storm drain pipes using pipe-laying machinery or laser guidance equipment.
Positioned, aligned or sealed concrete wall sections or pipes.
Loaded or unloaded building materials to distribute machinery or tools.
Demonstrated best safety practices working at heights and lifting various objects.
Worked productively as lead or helping team member to drive customer satisfaction.
Displayed high standards for quality workmanship and routinely double-checked work.
Cleaned or prepared construction sites to eliminate hazards.
Kept crew actions in line with safety standards to protect personnel, equipment and other structures.
Completed demo project under budget and ahead of schedule with no punch list items.
Identified safety hazards and risk to employees and corrected deficiencies before major problems occurred.
Apprentice
Priestly Demolition
Edmonton, AB
04.2024 - 10.2024
Followed safety protocols to maintain a safe work environment.
Cleared debris and hazardous materials from demolition sites.
Collaborated with team members to complete tasks effectively.
Prepared sites for demolition by securing necessary permits and inspections.
Maintained tools and equipment to ensure optimal performance.
Operated various hand and power tools including jackhammers, saws, drills, wrenches.
Removed debris from job sites to designated areas for disposal or recycling.
Assisted in the demolition of buildings and other structures using hammers, crowbars, and other tools.
Worked with supervisors to determine best methods of demolishing structures.
Communicated with team members about progress on projects and any challenges encountered.