Overview
Work History
Timeline
Generic

Mohamed Hassan

Edmonton,AB

Overview

1
1
year of professional experience

Work History

Solar Installer

Cbi Solar
07.2022 - 08.2023
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Assisted team members with tasks that require group effort.
  • Performed general housekeeping and cleaning tasks.
  • Collaborated with team members to carry out efficient work with optimal safety and achieve timetables.
  • Installed panels using hand and power tools.
  • Ran wires and set up support structures for panels.
  • Read and interpreted blueprints and job plans, verified measurements and checked site conditions before installing any panels.
  • Operated equipment such as forklifts to move panels into staging positions.
  • Performed minor carpentry work before, during and after panel installations.
  • Assembled, wired and connected solar panels to existing components and systems.
  • Installed solar panels on multiple residential and commercial properties to meet customer requirements.
  • Checked electrical installation for proper wiring, polarity, grounding, and integrity of terminations.
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction.
  • Developed efficient installation techniques to decrease labor time.
  • Verified completion of inspections prior to installation processes to reduce delays.
  • Troubleshot electrical issues related to solar panel installation and implemented swift resolutions.
  • Devised comprehensive maintenance and repair plans for existing solar panel systems.
  • Determined appropriate sizes, ratings and locations for system overcurrent devices, disconnect devices, and grounding equipment.
  • Conducted site visits, assessing solar panel placement and accurately measuring installation areas.
  • Isolated and addressed problems with electrical or environmental factors negatively impacting system operations.
  • Met and exceeded customer preferences with high-quality solar photovoltaic installations matching designs parameters.
  • Examined blueprints, technical documentation and customer facilities to determine appropriate locations for installations.
  • Inventoried supplies and materials for installations and repairs, documented changes and requested new inventory to meet expected demand.

Timeline

Solar Installer

Cbi Solar
07.2022 - 08.2023
Mohamed Hassan