Utilized AutoCAD and Revit to create accurate HVAC system designs, ensuring precision and attention to detail
Collaborated on numerous projects, resulting in a 15% improvement in project efficiency by minimizing the risk of errors and avoiding any interference that could potentially slow the construction process
Contributed to the design of sustainable, energy-efficient HVAC systems for diverse facilities, including long-term care homes, schools, and fire stations, integrating advanced technologies and practices aimed at optimizing energy use and promoting long-term environmental sustainability
Visited construction sites to monitor the progress of HVAC system installations, ensuring alignment with design specifications
Proactively identified and reported any discrepancies or issues, facilitating prompt resolution and maintaining project timelines
Junior Manufacturing Engineer
SureCure
Milton, Canada
06.2021 - 04.2023
Proficiently generated tool paths, set tool axes, and optimized G-codes for CNC machines to produce aligners, achieving 30% reduction in quality errors
Developed weekly reports on automated tool paths errors and presented solutions to higher management, leading to a 15% decrease in manufacturing defects
Monitored and tracked quality control metrics throughout the production process, ensuring the safety and compliance of the product with industry standards resulting in a 10% reduction in safety-related issues and improved overall customer satisfaction
Supply Chain Coordinator
PwC Consultant Company
Toronto, Canada
05.2022 - 09.2022
Researched and analyzed the automotive industry's supply chain challenges, identifying key issues and their impacts on operations
Presented strategic recommendations to PwC's management board for enhancing supply chain resiliency in the automotive sector
Crafted a comprehensive report and presentation for PwC partners, outlining a clear, data-driven short-term and long-term plan to assist OEM clients in improving supply chain efficiency, resulting in a 15% reduction in operational costs
Blue Roof Designer
City Studio London
London, Canada
09.2020 - 04.2021
Collaborated with a team of three to design an innovative blue roof system for Earl Nicholas Hockey Arena, aimed at managing stormwater runoff and preventing municipal sewer overflow
Developed the roof design using SolidWorks and conducted comprehensive CFD analysis to ensure compliance with Ontario Building Codes
Integrated HVAC analysis and utilized the HAP software to optimize the design, achieving a projected $5,500 in energy savings during the summer months
Project Manager at SONITUS Engineering Consulting Inc. / ADVENS Engineering Inc.Project Manager at SONITUS Engineering Consulting Inc. / ADVENS Engineering Inc.