Managed end-to-end delivery of projects by coordinating, leading, and overseeing all aspects of the project life cycle. Collaborated with Business unit on development activities adhering to corporate Asset Development and Execution Model (ADEM) methodology. Spearheaded successful execution of projects through final completion.
KEY PROJECT INTEGRATION ACTIVITIES HIGHLIGHTS
Asset and Project Development: Assist the business unit in developing new opportunities, selecting concepts, conducting economic evaluations and IRR calculations, creating high-level estimates, developing schedules, and implementing the asset development model.
Front End Execution: Leading coordination efforts to advance through execution gates and front-end engineering design, utilizing both internal and external interfaces such as EP houses. Participating in design reviews, detailed estimates and schedule assessments, scope and estimate optimization activities, constructability evaluations, model reviews, and more.
Leadership, Integration and Project Management: Lead the project deliverables with accountability, establish trust, and build relationships both within the team and with external stakeholders. Create a positive and cohesive team environment, motivating team members to take ownership and celebrate the project's success and key milestones. Communicate effectively with individuals and groups to align on action plans.
Key activities include:
Contactor Management: Compile the Scope of Work for contracts with input from all relevant project stakeholders, manage contractor/supplier performance, ensure stewardship against contract requirements, and collaborate with Supply Chain Management for ongoing contract change management.
Skills applicable: Possessing independent problem-solving abilities is crucial for analyzing and resolving complex situations with minimal assistance. It involves applying knowledge and established methodologies to intricate problems and being capable of identifying and dismantling barriers to ensure successful execution.
Projects At Suncor: Fort Hills Secondary Extraction, P300 Booster Pump House, P86 Booster Pump House, Fort Hills Common Infrastructure, Voyageur Upgrader.
Projects at Horton CBI: Imperial Oil Kearl Oil Sands, Suncor Coker Delta Valve replacement, Suncor
Fractionation tower replacement, Syncrude tank maintenance
Develop and manage a Project Controls plan for the project, supporting the development gate processes, requests for project funding, and approval of control baselines for cost and schedule. This includes the management of cost and control, MESR, benchmarking, and project closeout.
Cost Management:
Schedule Management:
Develop a detailed schedule in Primavera, encompassing all project stages, establishing a schedule basis, and creating a resource-loaded baseline schedule. Collaborate with team members to regularly update and maintain an integrated schedule, perform variance analysis against baselines, devise recovery scenarios, conduct critical path analysis, and establish a system-based schedule for turnover and commissioning.
Progress & Performance Management:
Develop, manage, and oversee the project progress baseline (work packages), actively track installation/construction progress through the development and implementation of rules of credit and earned value management. Conduct progress variance analysis and collaborate with contractors to formulate a recovery plan. Report progress to stakeholders and senior management, highlighting key achievements and early risk indicators.
Title: SR. PROJECT ENGINEER/ PROJECT CONTROLS SPECIALIST/LEAD