Summary
Overview
Work History
Education
Skills
Timeline
Hi, I’m

MINH TUAN KIEU

VANCOUVER,British Columbia

Summary

Dedicated to quality and always professional. Experienced Installation Technician is familiar with molding. Dedicated to always getting the job done correctly and efficiently. Looking for a new position within the fiber-crown sector. A highly-motivated employee with a desire to take on new challenges. Strong worth ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills. Willingness to take on added responsibilities to meet team goals.

Overview

7
years of professional experience

Work History

Consol Construction Solution
VANCOUVER, British Columbia

Installation Fiber-crown
01.2020 - Current

Job overview

  • Maintained high level of safety when using hand and power equipment for hoisting, measuring, testing, and drilling of various types of installations.
  • Evaluated equipment to determine if it needed to be repaired or replaced.
  • Used hand and power equipment for hoisting, measuring, testing, and drilling of various types of installations.
  • Collaborated with internal teams for operational continuity and optimal performance.
  • Installed and configured new equipment and systems according to company standards.
  • Worked with diverse types of weather and ground conditions.
  • Passionate about learning and committed to continual improvement.
  • Demonstrated respect, friendliness and willingness to help wherever needed.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Paid attention to detail while completing assignments.

Consol Construction solution
VANCOUVER, British Columbia

Installation Helper
10.2017 - 12.2019

Job overview

  • Passed tools and supplies to senior installation professionals.
  • Maintained site safety by removing hazards and reporting unsafe conditions.
  • Disassembled broken, defective, and worn-out equipment to aid with repairs.
  • Measured and cut pieces to maintain work efficiency.
  • Performed skilled and semi-skilled install work under supervision of senior technician.
  • Carried materials to site locations and arranged for ease of use.
  • Kept work areas clean and organized.
  • Prepared new construction sites by digging, moving dirt, or compacting space.
  • Lubricated and cleaned machines and work tools to maintain optimum performance.
  • Set up ladders and other access equipment.
  • Followed safety protocols and best practices for installation, maintenance, or repair work.

Peter King Painting Ltd
VANCOUVER, British Columbia

Painter's Helper
05.2017 - 10.2017

Job overview

  • Worked with water and oil-based paints and trained in removal of unwanted or splattered paints.
  • Primed surfaces evenly prior to painting allowing paint to be applied evenly.
  • Cleaned brushes, rollers, and tray equipment prior to use.
  • Completed finish coats on low-visibility surfaces.
  • Prepared different paintable surfaces prior to product application.
  • Helped remove damaged materials and surfaces in preparation for repairs.
  • Filled cracks and breaks in surfaces of plaster articles with putty and epoxy compounds.
  • Applied various protective coatings such as primers and preservatives to protect against rust and corrosion.
  • Painted walls and other large areas using brushes, rollers, and spray guns.
  • Covered floors before prepping, priming, and painting walls and ceilings to protect them from chemicals and paint.
  • Protected surfaces with masking tape and plastic sheeting to prevent damage.
  • Prepared surfaces by stripping existing coatings, filling holes, and sanding.
  • Filled cracks and breaks in plaster surfaces with putty or epoxy compounds..
  • Organized and cleaned work area and tools.
  • Set up painting job spaces by unloading trucks, placing ladders, and laying out protective tarp draping sheets.
  • Operated equipment with strong focus on safety and ground communication.
  • Operated hand tools, saws, routers, and sanding equipment to prepare materials and finish project surfaces.
  • Climbed ladders and scaffolds to reach work areas up to 40 feet high.
  • Removed existing wallpaper by applying solution, scraping and peeling paper off walls.
  • Removed damaged materials and prepared surfaces for optimal installations.
  • Erected scaffolding and safely worked at heights to complete projects.
  • Cleaned job site after project completion, removing the tape, and tarps and inspecting for drips or inconsistencies in paint application.

Education

British Columbia Institute of Technology
Burnaby, BC

High School Diploma
04.2018

Skills

  • Installations expertise
  • Installation and configuration
  • Teamwork and Collaboration
  • Flexible Schedule
  • Friendly, Positive Attitude
  • Reliable & Trustworthy
  • Safety awareness

Timeline

Installation Fiber-crown

Consol Construction Solution
01.2020 - Current

Installation Helper

Consol Construction solution
10.2017 - 12.2019

Painter's Helper

Peter King Painting Ltd
05.2017 - 10.2017

British Columbia Institute of Technology

High School Diploma
MINH TUAN KIEU