Evaluated Material Modification Assessments (MMAs) as part of the Generator Interconnection Process (GIP) to determine the grid reliability impact of proposed project changes.
Conducted technical analysis forGIP Queue Cluster Studies and Reassessments, utilizing scenario assessment tools to model system impacts and evaluate project integration.
Performed power flow and transient stability analyses to evaluate the impact of large-scale renewable generation integration on the SCE transmission grid.
Interfaced with CAISO representatives and generation developers to communicate technical requirements and study results during the interconnection lifecycle.
Coordinated cross-functional teams to align project objectives and enhance collaboration.
Prepared comprehensive reports for senior management review, ensuring thorough analysis.
Collaborated with stakeholders to define project requirements, timelines, deliverables, resources, and cost estimates.
Supported planning staff to streamline workflows and improve project execution.
Developed strategic plans for long-term initiatives while managing short-term tasks concurrently.
Utilized planning strategies and tools for data manipulation and scenario assessment to inform project decisions.
Provided technical advice and support regarding ISO requirements during project planning stages.
Data Entry Clerk/Operations Assistant
FORENSISGROUP INC.
Pasadena
06.2016 - 03.2020
Optimized webpage to lower advertisement click costs through strategic updates.
Worked with team on various office projects to drive improvements.
Maintained and updated main database for data integrity and accessibility.
Maintained organized files to ensure easy access to information.
Worked with team on various office projects to drive improvements.Maintained and updated main database for data integrity and accessibility.
Summer Intern
IDEALAB/EDISUN HELIOSTATS
06.2015 - 08.2015
Led layout and setup of heliostat field, optimizing configuration for enhanced energy capture.
Coordinated layout and setup of solar heliostat field, ensuring optimal performance configuration.
Planned and installed layout of solar heliostat field, identifying cost-effective materials and pricing for project.
Education
Master of Science - Engineering Management
California State Polytechnic University, Pomona
Pomona, CA
Bachelor of Science - Electrical Engineering
California State Polytechnic University, Pomona
Pomona, CA
Areas of Experience
Software: PSLF, PowerWorld, Visio, Microsoft Office
Transmission & Substations Group Work Project Planner and Coordinator at PECO EnergyTransmission & Substations Group Work Project Planner and Coordinator at PECO Energy