Summary
Overview
Work History
Skills
Timeline
Generic

Michael Hall

Riverside

Summary

Highly-motivated employee with desire to take on new challenges. Strong worth ethic, adaptability and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Overview

7
7
years of professional experience

Work History

Installer/laborer

Grand Opening Doors and Windows
08.2022 - 02.2025
  • Laid out materials and system components to prepare for installation.
  • Operated tools, equipment, and machinery according to safety standards.
  • Installed complete systems at new residential and business construction sites.
  • Enhanced customer satisfaction by providing timely and accurate installations.
  • Implemented quality control measures during installations, ensuring that each project met or exceeded client expectations and regulatory standards.
  • Collaborated with team members to ensure smooth workflow and successful project completion.
  • Maintained a safe work environment by strictly adhering to safety protocols and guidelines.
  • Calculated materials and time needed for each job.
  • Conducted thorough pre-installation assessments to identify potential issues and develop solutions in advance.
  • Managed inventory effectively, ensuring all necessary supplies were on hand for each project without excess waste or stockpiling materials.
  • Ensured high-quality results by consistently following manufacturer specifications during installations.
  • Reduced callbacks by thoroughly testing installed equipment for proper functionality before leaving the job site.
  • Expedited installation times with efficient scheduling and coordination of resources.
  • Completed troubleshooting of malfunctions and diagnosed issues.
  • Trained new installers on best practices and company procedures, fostering a collaborative learning environment that strengthened overall team performance.
  • Communicated quickly and accurately with supervisors about problematic sites, missed installations or other issues.
  • Completed projects within budget constraints through careful planning and resource management.
  • Developed and maintained professional relationships with customers and vendors to promote loyalty and referrals.
  • Used appropriate PPE to reduce risks when working with electrical and communications systems.
  • Optimized workflow by effectively prioritizing installation tasks, resulting in timely project completion.
  • Maintained up-to-date knowledge of industry standards and technology advancements, applying them to installations for optimal results.

Pro Builder

CHEP North America Operations Center
08.2021 - 04.2022
  • Used hand tools and power tools to reinforce builds
  • Followed build procedures and work instructions to construct varied-size structures
  • Adhered to safety requirements by operating equipment and appropriately handling material
  • Constructed quality structures to meet prescribed time schedules and budgets
  • Complied with quality requirements to meet or exceed production service levels

Construction General Laborer

Redline Construction
06.2021 - 03.2022
  • Understood how to operate and maintain job site equipment safely and for maximum productivity
  • Displayed high standards for quality workmanship and routinely double-checked work
  • Gained independent working skills and guided and mentored less experienced team members
  • Met company and OSHA safety guidelines for work site operations to minimize worker risk

Commercial Plumber

Industrial Commercial Plumbing Inc
02.2018 - 05.2021
  • Located and repaired leaks in water supply lines
  • Tested plumbing systems to locate leaks, malfunctions and repair needs
  • Performed pipe fabrication, installation and fitting according to proper specifications
  • Followed relevant codes, regulations and safety techniques
  • Cut openings in walls and floors to accommodate pipe and pipe fittings

Skills

  • Large-Scale Measurement
  • Project Management
  • Heavy Machinery Operation
  • Physical Agility and Coordination
  • Superior Work Ethic

Timeline

Installer/laborer

Grand Opening Doors and Windows
08.2022 - 02.2025

Pro Builder

CHEP North America Operations Center
08.2021 - 04.2022

Construction General Laborer

Redline Construction
06.2021 - 03.2022

Commercial Plumber

Industrial Commercial Plumbing Inc
02.2018 - 05.2021
Michael Hall