Summary
Work History
Education
Skills
Languages
Timeline
Generic

MD NURUL HAQUE SHARDAR

Toronto,ON

Summary

Adept at site preparation and material logistics, I significantly enhanced worker productivity at Abdul Monem Construction Ltd. With a knack for power tool operation and a strong foundation in safety protocols, my self-motivation and team-building skills have consistently led to the successful completion of projects, exceeding quality expectations.

Work History

Construction Assistant

Abdul Monem Construction Ltd
  • Studied plans for each job to gain understanding of materials, tools and work required.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Gathered and disposed of worksite debris to remove safety hazards.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Worked flexible hours across night, weekend, and holiday shifts.
  • Maintained organized job sites, contributing to enhanced worker productivity and faster completion times.
  • Cleared work sites of hazardous items.
  • Dismantled constructing scaffolding, bracing and other temporary structures for construction sites.
  • Maintained tools and equipment in good working condition.
  • Removed debris and waste from job sites.
  • Performed demolition work on existing structures.
  • Unloaded and stored construction materials.

Electrician Helper

Km Nobely Garments Industry
  • Enhanced electrical system safety by assisting in the installation and maintenance of wiring, conduits, and fixtures.
  • Handled installation of electrical components by splicing, joining, and connecting wire.
  • Learned and followed latest electrical codes and regulations to deliver compliant electrical systems.
  • Pulled wire through conduits and through holes in walls and floors.

Construction Electrician

M/S Aysha Construction
  • Studied plans for each job to gain understanding of materials, tools and work required.
  • Loaded, unloaded, and moved material to and from storage and production areas.
  • Gathered and disposed of worksite debris to remove safety hazards.
  • Worked independently in fast-paced environment while meeting productivity and quality expectations.
  • Worked flexible hours across night, weekend, and holiday shifts.
  • Maintained organized job sites, contributing to enhanced worker productivity and faster completion times.
  • Cleared work sites of hazardous items.
  • Dismantled constructing scaffolding, bracing and other temporary structures for construction sites.
  • Maintained tools and equipment in good working condition.
  • Removed debris and waste from job sites.
  • Performed demolition work on existing structures.
  • Unloaded and stored construction materials.

Education

Bachelor Of Business Administration And Management - Business Studies

Sonargaon University
Dhaka, Bangladesh
03.2018

Skills

  • Site preparation
  • Hand tool proficiency
  • Power tool operation
  • Painting
  • Materials preparation
  • Material logistics
  • First aid training
  • Scaffolding setup
  • Blueprint reading
  • Finishing work
  • Electrical
  • Tile work
  • Welding techniques
  • Safety protocols
  • Team building
  • Self motivation

Languages

English
Bengali

Timeline

Construction Assistant

Abdul Monem Construction Ltd

Electrician Helper

Km Nobely Garments Industry

Construction Electrician

M/S Aysha Construction

Bachelor Of Business Administration And Management - Business Studies

Sonargaon University
MD NURUL HAQUE SHARDAR