Hi, I’m

Maziar Sharifi

Toronto ,Ontario
Maziar Sharifi

Summary

  • To learn more about my expertise and work history and the important tasks that I have performed and undertaken as a project manager in various projects, I will briefly describe them below:
  • All projects include basic parts: engineering, supply of goods, construction, installation and repairs, testing and commissioning in construction projects: crude oil storage tanks, petrochemical product storage tanks and diesel and fuel oil storage tanks (in accordance with the standards) API: 620-650-653) Crude oil and petrochemical products input and output piping to tanks, as well as heating coil systems inside diesel and fuel oil tanks, fire extinguishing system, various types of crude oil pump stations, firefighting water systems and extinguishing foam (according to ASME series standards: B31.1-B31.3-B36- 10.... & API: 5L-6D-....) as well as fixed equipment (types of boilers - heat exchangers) - drums - valve manual and control instruments and other plumbing supplies - dosing chemical packages - water purification plants - rail cranes inside the halls - filters - acid scrubbers, etc.) and various rotating equipment such as include: turbine, generator (maximum capacity 10 MW), pump-fan-compressor, as well as all kinds of steel structures for buildings - docks and marine platforms for unloading and loading tanker ships in the southern islands of Iran - steel support for the piping system and the electrical sector, as well as ladders, steel platforms for Access to the equipment installed in the project, electrical systems, instruments and control equipment, SCADA systems, DCS systems, earthing systems, cathodic protection systems, closed circuit remote control systems, all types of electrical panels (low voltage, medium voltage, high voltage), panels Local electricity and dry and wet transformers, rust removal and painting of all metal equipment as well as thermal insulation of all equipment that must be protected from heat transfer with the environment and waste separation equipment including transfer conveyors, sieves, hubs, dryers...
  • experiences in the construction sector include the supply of all kinds of construction materials, equipment and tools, and machines related to the construction part of the project - full implementation of all construction operations including topography, mapping, excavation or embankment operations, leveling, bed strength, and concrete foundation implementation Piling (if needed), concrete or metal skeleton and construction of steel pipe rock and construction of access roads - construction of concrete channels - concrete trenches - concrete gang walls - concrete dike walls - fuel loading and unloading stations in the power plant Combined cycles - also sleeving with the pipe jack method - landscaping - implementation of lighting beams - construction of pit valves - concrete oil separator - leachate treatment plant and sedimentation pools in waste incineration plants, etc.

Overview

26
years of professional experience
1
Certification

Work History

Own

Chief Executive Officer
06.2023 - Current

Job overview

  • Built productive relationships with industry partners and competitors to support strategic business objectives.
  • Made large-scale financial decisions and supervised company spending to reduce material losses and maximize profits.
  • Reviewed individual department performance and worked with leadership to improve processes, procedures, and practices.
  • Established clear and competitive goals, growth roadmaps, and strategic business plans.
  • Anticipated and tracked operational and tactical risks to provide strategic solutions.
  • We intend to provide engineering and consulting services in the field of construction, repairs, reconstruction, and installation of equipment for waste incineration plants and engineering services and installation of equipment for industrial and piping projects, steel structures, fuel storage tanks, etc.
  • Established foundational processes for business operations

TTS Group Company (Renewable Energy & Waste)

Executive Vice President Construction
11.2018 - 05.2023

Job overview

  • I oversaw the Management of three project managers for the construction and installation of waste incineration power plants with an electricity generation capacityof3-megawatt /hours 6-megawatt/ hours and8-megawatt /hours, as well as reviewing the implementation process of projects and regular visits to power plants under construction in three northern cities on the shores of the Caspian Sea in Iran. Also, reviewing and monitoring the process of producing the required engineering documents for the purchase-implementation-construction and installation and commissioning of power plant equipment, following up on the construction and completion of all necessary infrastructure for the operation of power plants, and participating in decision-making sessions on issues and problems Technical in the sites - solving financial problems and supplying goods, as well as preparing reports for the board of directors and the company's stakeholders
  • Skilled at working independently and collaboratively in a team environment.
  • Self-motivated, with a strong sense of personal responsibility.
  • Organized and detail-oriented with a strong work ethic.
  • Worked flexible hours across night, weekend and holiday shifts.
  • Paid attention to detail while completing assignments.
  • Identified issues, analyzed information and provided solutions to problems.
  • Participated in team projects, demonstrating an ability to work collaboratively and effectively.

International Petro Asmari Co. (IPAC)

Head of Project Supervisors
06.2017 - 09.2018

Job overview

  • The management of the supervision team of all the construction operations of oil facilities and the reconstruction and renovation of crude oil storage tanks, pipelines, crude oil pumping stations, and fire fighting water - as well as the reconstruction, renovation, and repair of the structure and painting and coating of the loading docks of oil tankers in Kharg Island, (Kharg Island is Iran's largest oil export terminal). Also, management and supervision of bagging operations under the crude oil pipelines under the sea (supporting) between Ganaveh port and Kharg Island of IRAN.
  • Skilled at working independently and collaboratively in a team environment.
  • Self-motivated, with a strong sense of personal responsibility.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Organized and detail-oriented with a strong work ethic.
  • Worked flexible hours across night, weekend and holiday shifts.
  • Paid attention to detail while completing assignments.
  • Participated in team projects, demonstrating an ability to work collaboratively and effectively.
  • Cultivated interpersonal skills by building positive relationships with others.

Oil And Energy Industries Development Co. (OEID)

Head of Project Supervisors
07.2016 - 06.2017

Job overview

  • The management of the supervision team of all the construction operations of oil facilities and the reconstruction and renovation of crude oil storage tanks, pipelines, crude oil pumping stations, and fire fighting water - as well as the reconstruction, renovation, and repair of the structure and painting and coating of the loading docks of oil tankers in Kharg Island, (Kharg Island is Iran's largest oil export terminal). Also, management and supervision of bagging operations under the crude oil pipelines under the sea (supporting) between Ganaveh port and Kharg Island of IRAN.
  • Skilled at working independently and collaboratively in a team environment.
  • Self-motivated, with a strong sense of personal responsibility.
  • Managed time efficiently in order to complete all tasks within deadlines.
  • Proved successful working within tight deadlines and a fast-paced environment.
  • Organized and detail-oriented with a strong work ethic.
  • Worked flexible hours across night, weekend and holiday shifts.
  • Paid attention to detail while completing assignments.
  • Participated in team projects, demonstrating an ability to work collaboratively and effectively.
  • Cultivated interpersonal skills by building positive relationships with others.

Owners

Builder
08.2014 - 07.2016

Job overview

  • Used personal expertise and craftsmanship to complete residential and commercial renovations.
  • Worked closely with owners throughout process to keep projects in line with individual visions.
  • Achieved multiple large-scale projects on time, within budget, and to high-quality standards through meticulous planning.
  • Interpreted blueprints accurately, building structures to exact specifications.
  • Completed accurate material and labour estimates for jobs ranging from small to large budgets.
  • Coordinated subcontractors to complete work within quality and timeframe targets.
  • Met with designers and engineers to address conflicts and reach appropriate solutions.
  • Developed detailed construction plans and organized required materials to maintain productivity.
  • Used a variety of hand and power tools to complete tasks.
  • Followed instructions and safety protocols to prevent accidents and injuries.

Ezam Construction Investment Company.

Senior Construction Project Manager
02.2013 - 08.2014

Job overview

  • Management of the complete construction of foundation and steel structure and curtain wall facade and interior architecture and installation of all mechanical and electrical installations and HVAC systems of the showroom building and construction of access roads.
  • Identified and resolved construction issues promptly to prevent delays.
  • Collaborated with contractors, architects, engineers, and public agencies to complete projects within timeline limitations and budget constraints.
  • Negotiated contracts with suppliers and subcontractors to confirm fair pricing and quality service.
  • Kept sites compliant with OSHA, state, and local regulations to prevent unnecessary risks.
  • Developed and implemented quality control plan to guarantee the highest standards of workmanship.
  • Prepared and managed project budgets to accurately track costs and expenses.
  • Performed regular job site observations to provide direction for general contractor personnel and subcontractor labourers.
  • Monitored construction sites for compliance with safety regulations and adherence to standards.

Petropart Company.

Senior Construction Project Manager
01.2006 - 09.2013

Job overview

  • Coordinating and participating with the engineering department to prepare mechanical drawings, review and approve the schedule, organize the project team, prepare project implementation requirements, review and approve contracts for the purchase and manufacture of goods and equipment, closely monitor the purchased goods, and select contractors. Component, cooperation with the project price estimation team, preparation of organizational chart, selection of key personnel of the project according to the organizational chart, review of technical documents produced by the engineering unit, review and approval of the status of component contractors and review of the project execution process, determination of critical paths for correction of deviations Project, executive management in the construction projects of crude oil and diesel storage tanks and firefighting water storage tanks, along with the construction and installation of piping systems, construction of diesel unloading and loading stations, construction of firefighting water pump station, firefighting foam injection system , F&G systems, construction of electrical equipment installation rooms, batteries room, UPS, transformer installation and installation and testing of low pressure, medium pressure, high pressure switchboards and installation of instrumentation equipment and fuel metering systems. Blasting and painting and coating, construction of office and utility buildings, fencing, creating concrete strip walls around crude oil and diesel storage tanks, fencing around the project area, and construction of surface water collection channels and roads. Access and perform all tests. Pre-commissioning and commissioning of the complex built in four major projects of Qazvin thermal cycle power plant with a capacity of 2000 megawatts, Yazd city with a capacity of 450 megawatts, the transfer of crude oil from the countries north of the Caspian Sea basin to Tehran province (crude oil - swap plan) from Sari oil depot to Mughank oil depot in Tehran province and construction of seven crude oil pumping stations between Sari and Tehran city. I worked closely with the engineering department to prepare mechanical drawings, review and approve schedules, organize the project team, and ensure I met the project implementation requirements. Also reviewed and approved contracts for the purchase and manufacture of goods and equipment, closely monitored the purchased goods, and selected contractors. We cooperated with the project price estimation team, prepared an organizational chart, and selected key personnel for the project. I reviewed technical documents produced by the engineering unit and monitored the project execution process, determining critical paths for the correction of deviations. We also provided executive management in the construction projects of crude oil and diesel storage tanks, firefighting water storage tanks, and piping systems. I oversaw the construction of diesel unloading and loading stations, firefighting water pump stations, firefighting foam injection systems, F&G systems, electrical equipment installation rooms, batteries room, UPS, transformer installation, and installation and testing of low-voltage, medium-voltage, high-voltage switchboards, instrumentation equipment, and fuel metering systems. I also oversaw blasting and painting and coating, construction of office and utility buildings, fencing, creating concrete strip walls around crude oil and diesel storage tanks, fencing around the project area, and construction of surface water collection channels and roads. I had access to and performed all tests. Furthermore, I oversaw the pre-commissioning and commissioning of four major projects, including the Qazvin thermal cycle power plant with a capacity of 2000 megawatts, Yazd city with a capacity of 450 megawatts, the transfer of crude oil from the countries north of the Caspian Sea basin to Tehran province (crude oil - swap plan) from Sari oil depot to Mughank oil depot in Tehran province, and construction of seven crude oil pumping stations between Sari and Tehran cities.
  • Identified and resolved construction issues promptly to prevent delays.
  • Collaborated with contractors, architects, engineers, and public agencies to complete projects within timeline limitations and budget constraints.
  • Negotiated contracts with suppliers and subcontractors to confirm fair pricing and quality service.
  • Reduced costs by streamlining contract bidding and procurement processes to assure best prices for materials and services.
  • Scheduled utility service providers according to project timelines.
  • Conducted critical pre-installation conferences with general contractors, subcontractors, consultants, and manufacturer's representatives.

Petroleum Engineering & Development Co.(PEDEC)

Supervisor, Contract Management
10.2003 - 02.2006

Job overview

  • As the employer's representative, I had responsible for the full supervision of all construction, installation, testing, and commissioning operations in the civil, mechanical, and electrical departments, as well as monitoring the performance of the project supervision team and the main contractors in the construction of 10 crude oil storage tanks. with a capacity of 500,000 barrels (double-deck external floating roof ) and construction and installation of crude oil and fire water pumping stations and foam systems as well as the construction of office buildings, ancillary facilities, landscaping, and installation of various measuring systems, electrical equipment, precision instruments, Cathodic protection, UPS, battery room, painting and etc. In addition, simultaneously I visited from 4 sites in ahwaz during the week and I had been holding a meeting regarding the necessary decisions on technical matters on the site. Also, I was responsible for the review and final approval of the status of executive operations performed by the main contractors, as well as the preparation of daily and monthly reports for the senior management of the project.
  • Applied strong leadership talents and problem-solving skills to maintain team efficiency and organize workflows.
  • Handled customer complaints, resolved issues, and adjusted policies to meet changing needs.
  • Monitored workflow to improve employee time management and increase productivity.
  • Achieved results by working with staff to meet established targets.
  • Conducted routine inspections to check quality and compliance with established specifications.
  • Generated reports detailing findings and recommendations.

Industrial Buildings Company.(IBC)

Senior Mechanical Construction Engineer
10.2002 - 10.2003

Job overview

  • Senior mechanical engineer and head of the manufacturing and installation unit, testing and commissioning of 19 storage tanks (daily tanks) for aromatic products with internal floating roofs and self-supporting dome roofs with different capacities. My main task in this project is executive planning according to the schedule and coordination between the executive teams of construction, installation, welding and checking the performance status of the component contractors, as well as the responsibility of the necessary coordination of the mechanical unit of tank installation with other units such as civil engineering, electricity, piping. In addition, I was responsible for planning inspection and quality control tests of the tanks, as well as writing installation instructions, checking the plans, solving subcontractors' problems, preparing daily and monthly reports, and preparing performance status reports for the contractors who are part of the tank installation unit at the end of each month.
  • Attended project planning meetings to coordinate mechanical system designs with structural and architecture teams, mitigate design conflicts, and coordinate delivery timelines.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Communicated project requirements and areas for improvement in design review meetings.
  • Identified deficiencies in mechanical processes to develop improvements.
  • Altered and modified designs to meet requirements and eliminate malfunctions.
  • Conducted research to test and analyze feasibility, design, operation and performance of equipment, components, and systems.
  • Conducted tolerance analysis at system and subsystem levels.
  • Applied mechanical problem solving skills to develop creative solutions for quality products.
  • Tested newly installed systems, closely monitoring functionality and adherence to operating specifications.
  • Drafted assemblies, models, and other technical drawings.

Radiator IRAN

Senior Mechanical Engineer
07.2001 - 08.2002

Job overview

  • As a senior expert in the production line, I had responsible for handling the production of parts of all types of heat exchangers and radiators, such as the construction of inlet & outlet pipes and fins, tanks, and shells of heat exchangers and radiators, as well as supervising the operations of electroplating parts, soldering, leakage testing, packaging of products And I was responsible for preparing daily reports, participating in technical meetings and strategic committees, teaching and training soldering methods for workers, and preparing educational pamphlets.
  • Assisted drafters in developing structural design of products using drafting tools or computer-assisted design (CAD) or drafting equipment and software.
  • Created parts for machining, sheet metal fabrication and injection molding.
  • Brainstormed with product designers to implement and refine new manufacturing processes.
  • Reviewed technical drawings developed by CAD technicians and drafters.
  • Interfaced with development engineers, scientists and suppliers to resolve quality issues.

Sazeh Sazan Khavar

Mechanical Engineering Technician
05.1997 - 07.2001

Job overview

  • Senior expert in mechanical engineering of technical office in the project of construction, installation, testing, commissioning of storage tanks for petrochemical products, construction and installation of steel structures, piping installation, installation of rotary and mechanical fix equipment in Asalouyeh petrochemical projects, Bandar Abbas refinery and Tabriz petrochemical in Iran.
  • Organized data archive of engineering specifications, drawings, and specifications and maintained traceability of documents by proper filing and indexing.
  • Investigated equipment functions to diagnose faults and make recommendations to provide solutions.

Education

Islamic Azad University
TEHRAN -IRAN

Master of Science from Mechanical Engineering
05.2001

University Overview

Islamic Azad University
TEHRAN -IRAN

Bachelor of Science from Mechanical Engineering
07.1996

University Overview

Skills

  • With more than 25 years of work experience in mechanical engineering, has held various positions, including executive vice president of projects, project manager, site supervisor, and senior expert in implementation unit of various projects in oil and petrochemical industries with goals of development, renovation, and repairs M Also, have valuable work experience in projects of increasing storage capacity of fuel tanks of steam combined cycle power plants (increasing storage of diesel and fuel oil) as well as construction, installation, and commissioning of waste incineration power plant equipment

Certification

  • Advanced Project Manager

Institute Of Management Research & Education (2008)

  • Pressure Vessel ASME, Sec 8

The Iranian Society of Mechanical Engineers(2008)

  • Storage Tank Design and Construction Base on API 650 Ver2008

Faragostaran Eduction(2009)

  • Advanced Product Quality Planning Programmed On QS 9000/2000

Quality Growth Services PVT.LTD(2001)

  • Awareness Training Programmed On QS 9000/2000

Quality Growth Services PVT.LTD(2001)

  • Auto Cad (1999)
  • Theory Of B - JAC Standard (2001)
  • Mechanical Desktop (2001)
  • Microsoft office

Additional Information

Additional Information

Additional Skills

 Project manager and assistant senior project manager and project team leader
 Workshop supervisor and chief executive expert of the construction and installation unit
 Project supervision and coordinator and follow-up of the affairs of the engineering unit, supply of goods, construction
 Estimating the purchase price and executive operations in the mechanical and civil and electrical sectors
 Macro planning and work breakdown structure ( WBS ) and cost breakdown structure (CBS)
 Preparation of cash flow
 Preparing an organizational chart and defining the duties of each staff member
 Selection & Providing of machines and equipment needed for the project
 Preparation of daily reports and preparation of management reports
 Holding technical meetings and making decisions (workshop engineering)
 Selection of sub-contractors and review of their performance status with the work done and preparing the financial report of the performance of the subcontractors.

Timeline

Chief Executive Officer
Own
06.2023 - Current
Executive Vice President Construction
TTS Group Company (Renewable Energy & Waste)
11.2018 - 05.2023
Head of Project Supervisors
International Petro Asmari Co. (IPAC)
06.2017 - 09.2018
Head of Project Supervisors
Oil And Energy Industries Development Co. (OEID)
07.2016 - 06.2017
Builder
Owners
08.2014 - 07.2016
Senior Construction Project Manager
Ezam Construction Investment Company.
02.2013 - 08.2014
Senior Construction Project Manager
Petropart Company.
01.2006 - 09.2013
Supervisor, Contract Management
Petroleum Engineering & Development Co.(PEDEC)
10.2003 - 02.2006
Senior Mechanical Construction Engineer
Industrial Buildings Company.(IBC)
10.2002 - 10.2003
Senior Mechanical Engineer
Radiator IRAN
07.2001 - 08.2002
Mechanical Engineering Technician
Sazeh Sazan Khavar
05.1997 - 07.2001
Islamic Azad University
Master of Science from Mechanical Engineering
Islamic Azad University
Bachelor of Science from Mechanical Engineering
Maziar Sharifi