With 17 years of experience in the UA Pipefitting Trade, I have honed my skills in various complex industrial environments across Canada and the United States. My background includes extensive work with rigging crews, fitting crews, and testing processes, emphasizing meticulousness, professionalism, and teamwork. I am eager to bring my extensive knowledge of piping systems at FortisBC.
Field Installation:
- Analyzed system packages, gathered spools, supports, guides, anchors, etc.
- Installed components according to isometric prints.
- Prepared for welding.
- Addressed punch list deficiencies.
Steamfitter | Various Outage Projects: Shell Albian Sands, Shell Scotford, Syncrude, CNRL, Suncor
Performed maintenance on boilers and reactors during scheduled outages of Units 2, 4, and 7.
Pneumatic and Hydro Testing Procedures:
- Located test boundaries with test package and isolated test limits.
- Installed high point vents and fill points.
- Executed test procedures.
- Reinstated the integrity of the system, ensuring it was moisture-free.
Bore Scope:
- Navigated camera through systems to locate Foreign Material Exclusion (FME) issues.
- Retrieved all foreign material.
- Recorded results before turnover to Shell.
Outage on the Cokers:
- Remachined flange faces of the Delta Valve and coker nozzle.
- Utilized a hydraulic nut splitter.
- Performed cold cutting and welding preparation with hydraulic clamshell.
- Used hydraulic Hytorc/tensioning pump.
Special Project Crew:
- Modified and refurbished heating systems in city infrastructure, steam distribution tunnels, and power plants.
- Worked on modifications and refurbishments in OPG hydroelectric central.
Highrise Construction of Mechanical Rooms:
- Field-designed heating systems.
- Ordered material lists.
- Prepared for welding.
- Conducted hydrotesting, cleaned systems, and prepared for start-up.
Field Installation:
- Analyzed system packages, gathered spools, supports, guides, anchors, etc.
- Installed components according to isometric prints.
- Prepared for welding.
- Addressed punch list deficiencies.
Fab Shop Prefabrication of Pipe Spools and Heating System Components:
- Fabricated pipe spools with a welder for various job sites according to priority levels.
- Drew and gathered TSSA documentation such as weld mapping, mill test reports, statutory declarations, etc.
- Conducted hydrotesting.
Pneumatic and Hydro Testing Procedures:
- Located test boundaries with test package and isolated test limits.
- Installed high point vents and fill points.
- Executed test procedures.
- Reinstated the integrity of the system, ensuring it was moisture-free.
Refurbishment of Infrastructure Heating System:
- Field-designed heating systems.
- Ordered material lists.
- Prepared for welding.
- Conducted hydrotesting, cleaned systems, and prepared for start-up.
Boiler installation
Pressure testing
Effective Communication
Safety Procedures
System Maintenance
Blueprint Reading
Rigging and setting
Piping layout and assembly
Teamwork and Collaboration
Problem-Solving
Pipeline Safety