Summary
Overview
Work History
Education
Skills
Timeline
Generic

Markus Hahn

Toronto

Summary

Digital Delivery & BIM Specialist with extensive experience developing and managing BIM models across diverse sectors, including civil infrastructure, residential and commercial projects. Proven ability to lead BIM implementation on-site by establishing workflows, procedures, and promoting best practices that enhance coordination, collaboration, and visualization. Skilled in integrating BIM standards and digital platforms to support project lifecycle delivery and client requirements.

Overview

16
16
years of professional experience

Work History

Freelance BIM Consultant

LEONHARD WEISS GmbH & Co. KG
06.2025 - 08.2025
  • Took time off to take care of aging parents, handled medical appointments, daily transportation and overall household management
  • Worked two days as a Freelance BIM Consultant to support BIM teams by authoring detailed process documentation for site-specific BIM use cases, creating training guides to optimize cross-platform collaboration between “Autodesk Revit and Civil 3D” and general exchange of BIM Knowledge

VDC / Preconstruction Assistant Manager

SKYGRID CONSTRUCTION INC.
10.2024 - 06.2025
  • Trained and mentored BIM Team in Autodesk Software (eg. Infraworks and Civil 3D) and prepared training manuals and workflows
  • Managed Folder Structure and User Access in Autodesk Construction Cloud (ACC)
  • Resolved issues related to plans and specifications, specifically as it relates to organization, use and management of BIM Models by interacting with architects, consultants and owners’ representatives
  • Created 2D Construction Management Plans (CMP) to visualize project activities and site logistics to minimize impact to local roads and adjacent properties
  • Reconciled bids, ensuring accuracy and resolving any discrepancies and reviewing LOIs
  • PROJECTS:

2 Tecumseth St., Toronto, Ontario Kingston

Waterfront Development, Kingston, Ontario

VDC / BIM Lead

KENAIDAN CONTRACTING
03.2017 - 08.2024
  • Managed production of digital as built Models at Airport Projects by ensuring all FM data, design changes and point cloud data incorporated into model to reflect site conditions
  • Run Clash detection to identify clashes between multiple disciplines, analyzed clashes and prepared reports to track solutions
  • Prepared installation coordination drawings to resolve, in advance of construction, potential conflict and interference among multiple disciplines, existing structures and other components
  • Oversaw project-specific BIM Execution Plan requirement, ensured compliance with Owners (TTC, Metrolinx) standards and managed BIM Coordination Meetings
  • Provided Revit, Civil 3D and Navisworks Training and technical orientation in BIM tools for new hires and Site teams, mentored Junior BIM Team members
  • Oversaw the BIM collaboration process on design-build and P3 Projects, collaborate and coordinate with other disciplines, design-changes and model challenges
  • Oversaw and mentored Scheduler by linking a Primavera schedule to a 3D model of a new Parking Garage to visualize opportunities to shorten schedule
  • Tracked excavation quantities based on drone site surveying data by using Civil 3D
  • Supported Design Team and trades with setting up project by coordination of shared project coordinates, templates, floor plans etc. to make sure all models correlate to each other
  • PROJECTS:

TTC Islington Station – Redevelopment, Toronto, Ontario

Weston Tunnel – Phase 3 Grade Separation, Toronto, Ontario GTAA WP2 and WP3 Greater Toronto Airport Authority, Toronto, Ontario Eglinton Crosstown LRT - West Launch Area and Western Tunnel, Toronto, Ontario

Virtual Design and Construction Manager, Civil

ELLISDON CORPORATION
03.2015 - 03.2017
  • Oversaw on-site BIM related project coordination, including model coordination with trades, contractors and Design Firm models to run clash detections of underground utilities which resulted in a reduction of interferences, RFI 's and Site Instructions for a Bus Rapid Transit Project
  • Implemented Autodesk Infraworks software within EllisDon Virtual Design department, trained and mentored BIM staff using Infraworks during bid phase to visualize traffic staging for a LRT Project which reduced duration of street closures
  • Developed 3D conceptual Model of Tunnel structure including shoring and excavation of Launch Shaft to create construction sequence, equipment cycling and overall design authoring to identifying challenges and opportunities
  • PROJECTS:

Finch West Light Rail Transit Pursuit, Toronto, Ontario

Hurontario Light Rail Line Pursuit, Mississauga, Ontario

BIM Construction Coordinator

KENAIDAN CONTRACTING LTD.
01.2010 - 02.2015
  • Produced and updated various digital Building Information Models for site work, concrete and steel structures, mechanical systems and architectural components, supporting Estimating Department by creating accurate quantity take-offs (Volumes, Areas, Fill and Cut and Topographic Surfaces) to bid successful on jobs
  • Modeled complex concrete structures for Wastewater Treatment plants and Renewable Energy Facility and created Lift drawings including accurate inserts and openings
  • Lead BIM Coordination Meetings for a Sports Stadium: Spatial Coordination of Disciplines, gathering all disciplines BIM Models including Civil Models to perform coordination tasks to minimize interferences and conflict resolution, and allocate working areas for trades which resulted in an increase of efficiency
  • PROJECT:

Port Hope Long Term Waste (Nuclear) Management Facility, Port Hope, Ontario

Coventa Waste to Energy, Courtice Ontario

Duffin Creek Wastewater Treatment Plant, Pickering Ontario

Kenaidan Head Office, Mississauga, Ontario

Education

Diploma - Qualified Technical Engineer, Construction Engineering

College for Civil Engineering Karlsruhe
01.2000

Skills

  • Twenty years of Canadian experience in residential (low and high rise), industrial, civil and infrastructure projects from estimation, design and project management aspect
  • Solid knowledge of AutoCAD, Civil 3D, Revit, Navisworks, Cintoo, Infraworks, Bluebeam, Autodesk Construction Cloud (ACC), Recap, Scan to BIM, MS Office, ProjectWise and Common Data Environments
  • Detail oriented, with the ability to handle multiple responsibilities in a fast-paced environment
  • Independent and collaborative work skills

Timeline

Freelance BIM Consultant

LEONHARD WEISS GmbH & Co. KG
06.2025 - 08.2025

VDC / Preconstruction Assistant Manager

SKYGRID CONSTRUCTION INC.
10.2024 - 06.2025

VDC / BIM Lead

KENAIDAN CONTRACTING
03.2017 - 08.2024

Virtual Design and Construction Manager, Civil

ELLISDON CORPORATION
03.2015 - 03.2017

BIM Construction Coordinator

KENAIDAN CONTRACTING LTD.
01.2010 - 02.2015

Diploma - Qualified Technical Engineer, Construction Engineering

College for Civil Engineering Karlsruhe
Markus Hahn