Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Mario Gonzalez

Victorville

Summary

Accomplished Driver/Underground Utility Technician at First Line Construction, recognized for enhancing project efficiency through meticulous documentation and preventative maintenance. Demonstrates strong problem-solving skills and adherence to safety protocols. Holds a clean driving record and valid driver's license, ensuring safe and reliable operations. Successfully improved workflow processes by 20% through strategic insights.

Overview

8
8
years of professional experience

Work History

Driver/Underground Utility Technician

First Line Construction
04.2025 - Current

I drive to work yard and load up all the materials that will be needed for that day. once everything is secured i drive off to job site location. Once upon arrival we see the map of where are the communication boxes will be placed and walk to see the live utility lines. we then start braking concrete or asphalt with jack hammer or a bobcat stinger. to find all the utility lines. also we use a boar hog for small drops and pipe fitter connections. everything we brake we restore such as asphalt and concrete. know how to use all compressor tools and a jumping templar. know how to rake asphalt and use a vibrating plate. know the safety of working on main busy streets. Also drive a 5500 Ram truck with a trailer attached

  • Improved project efficiency with meticulous documentation of underground utility locations, specifications, and maintenance records.
  • Maintained optimal functionality of underground utilities through regular inspections, preventative maintenance, and timely repairs.
  • Installed wiring, cabling and networking hardware on customer premises.

Concrete Finisher

GCR Inc.
04.2021 - 02.2025

Tilt Ups. we would prepare the warehouses that are being built for the painters could paint the building.

We would use a angle grinder to grind the walls that are required to fix. We would use a smooth finish cement like known as sika. we would apply as much material as neede to patch the walls to fix them. The following day we would sand them with a sanding machine. we would walk around the whole building to inspect what needed to be fix. if the walls had big broken pieces missing we would use sand mix with portland cement, or rapid set. all of these was done while operating a boom lift machine.

  • Collaborated with team members to coordinate project timelines and tasks effectively.
  • Inspected finished work for quality assurance, making adjustments as necessary.
  • Implemented best practices to enhance efficiency in finishing operations across multiple sites.
  • Installed rebar and molded expansion joints and edges for concrete projects.
  • Demolished and repaired old concrete surfaces.
  • Mixed, spread, and patched concrete to specifications.

Utility Worker

L N G Cable Construction
09.2017 - 07.2021

We would drive to yard location and load up all the materials that were needed for that day.

Once upon arrival to jobsite location we would walk the job site to locate where the communication boxes will be placed. would read all the USA marks and started to find all the live utility lines. also everything we would damage we would replace. Such as concrete and asphalt. drive a 450 ford with a trailer attached. Also learned how to apply safety arrow board with cones. Known as traffic control.

  • Collaborated with team members to execute cable laying and trenching tasks according to project specifications.
  • Streamlined workflow processes by suggesting improvements based on hands-on experience and observations.
  • Verified that all safety procedures were followed while working on utility systems.
  • Installed underground pipes, conduits and other components of utility systems.

Education

GED -

Silverado High School
Victorville, CA

Skills

  • Time management
  • Valid Driver's license
  • Clean driving record
  • Problem-solving
  • Safe driving practices
  • Punctual and reliable
  • Flexible schedule
  • Safety protocols
  • Vehicle inspections

Languages

Spanish

Timeline

Driver/Underground Utility Technician

First Line Construction
04.2025 - Current

Concrete Finisher

GCR Inc.
04.2021 - 02.2025

Utility Worker

L N G Cable Construction
09.2017 - 07.2021

GED -

Silverado High School
Mario Gonzalez